HomeMy WebLinkAboutO-0700 - Amends Sec. 12.02.010; adds Sec. 12.02.040 – 12.02.120, street department code (Repealed by 2724)ORDINANCE NO.1 ,,-JJ ,
An ordinance of the City of Marysville adopting
a Street Department Code.
THE CITY COU~CIt OF THE CITY OF MARYSViLLE DO ORDAIN AS FOLLOWS a
SECTIO~1:hdoEtionof Street Code I
There is hereby adopted a Street Department''Code governing
the rules and specifications to be followed in public-.works
construction in the ,City 'of MarysviLle public rights-of-way.
S),£CTI9i.\J 21 A2plicable SEeQfications 1
'Specifications to be adhered to in performing work in/or
~pon public rights-of-way of the City'of ~mrysville shall
·.J3e'inaccordance with Standard Specifications.for t1unicipal
Public Worl<s Construction,'as supplemented and modified by
the City of Marysville Street Department Code.Three copies
of the standard 'specification are on file in the'office of
the City Clerk.
SZqJ..l.0N';1 Construction Requirements =-General Specificatioi1§ll
A.All'lines installed in existing or new City streets
shall have the location designated by the City Engineer.
B.All "Asbestos .CemEmt"and/or pListtic pipes crossing
City,streets must 'be encased in a.steel pipe of,larger '
'diameter.
c.There shall be rio.tunneling of.streets or alleys.
'Lines shall be laid by either open c~t 'or by the method Qf
jacked casing.
,D. No open cut eros's Lng of City street~or alley;aha l.l,
be made without the approval,.ofthe City Engineer....''.'
~.All open cut cr-oss'Ings of streets shall conform to
the,following:Existing surface'shall be pcecur 2 ·f.eet wider
than.bucket'width.Backfilling and compaction shall be
accomplished immediately af.ter installation qf pipe.Backfill
material shall be completely granular and free draining.
Immediately followlng·:compaction 'effort,4 Lnches minimum
compacted crushed 'rock shall be-.installed and patched with
cold mix of 2 incheS minimum thickness.
~,
\
\
..~.
Page 1.
'\
F.Final restoration of open cuts ,shall be as fol~ows:
Temporary cold patch shal~be removed.~dges'of existing"
road surface shall be cut,and trimmed to a neat,straight'
line,then tacked and a 2-inch minimum compacted thickness
of Class B asphalti~concrete installed in a manner
satisfactory to the City ,~ngineer.
G.Shoulders disturbed 'by excavat Lon shall be shaped'
to City standards and'be followed with minimum 2 inch'compacted
crushed top course,foilowed by';:the installation of a
double Bituminous Surfa~e Treatment.
H.Compaction of backfill under special conditions:,At
locations where paved streetp,driveways,sidewalks or curb
and gutters will·be constr~cted or reconstructed over the
trench or where provided for in the special provisions or
directed by th~En8ineer,the backfill shall be spread in
layers and be compac~ed by mechanical tampers.In such,
cases,the backfill shall be placed in successive layers,
not 'exceeding 12 inches in thicknass and each layer shall
'be compacted with mechim'ica:l 'tampers .tro the density directed
by the Engineer.Mechanical tampers shall be of the impact
type as specified in Sect'ion 15-2.OlA of -Standard Specifications
for Municipal Public Works Construction 1963.
1.,On graded st~eets 'without pavement or on street
shoulders and unimp~oved areas,compaction of'backfill shall
be ?y water settlin&orwheel rolling as directed by City
Engineer.~vhen water settling is directed by the Engineer,
it shall be in accordance,vlith '''Section 73-2.07/\and Section
73 ...2.0713 of Standard Speci'fi'cations for Municipal Public'
Horks Construction 1963 ..If ''
J~All crossings of City rights-of-ways shall be as
follows:'
1.Asbestos cement pipe for water supplies shall be
installed in accordance with ,If John Manville Transite Water
Pipe Installation Specifications D$..348~6l.11
2.The permittee shall advise the City 24 hours before
frtarting any of the above described work arid no backfill,
shall be placed without the approvai of tha City Engineer.
K.'Existing'drainage :ditches,culverts',etc.,shall be
kept,clean at all times.Temporary diversion of 'any
'drainage system will not be permitted ~17ithout the consent of
the City Engineer •.Any ~rainQge,culvert tile,catch basins,
manholes,etc.~disturbed by excavation,shall be replaced
with new mater~alsor repaired ,as directed by the City Engineer.
·Page 2.
.....
";;~.)f.:'~
/.,~,,~,":,1
'/..~
L..If;"in the oparu.on of the'C:i.ty.-Engi1"leer the weather.
is ,such that 'by a particular contract renders the traveled.
roadways unsafe for public passage then upon his orders,
excavation shall cease imm~diatelY arid .clean-up promptly
'.accomplished..,
H.The'maximum amount of 'open trench on City Streets
shall be 400 lineal feet..
.'.
N.All pipe strung along City rights-oi-ways must be
placed a safe distance from the ~raveled roadway'in such
a manner as to avoid accidental"rolling onto roadway •.
O.Final cleanup~including'complete restoration pf
shoulders,cleaning of ditches,culverts and catch basins,
removal of loose material from back slope of ditches,shall
not exceed 800:lineal .feet·behind excav.ating operation.
P..Street surfaces shall be cleaned at end of each-day's
operation with a power'broom or other approved means •
.Blading of Asphalt Stree.tEl will not be permitted~
Q.No excess material or unsuitable material shall be
.'left on City rights-of-wayswithout theexpJ;:'ess consent
of the City Engineer..
R.Signs and traffic.;controls will be furnished by the
contractor and shall be in accord,ance with regulations,as
established byt~e Washington State Department of Saf~ty•
S.
.Ci.ty
..
No backfill shall be placed without approval by the
Engineer.'' .
'r.The t~rm,.City Engineer,as used'above shall mean
City Engineer ,.,superintendent of Streets or their
authorized representatives.
gCTION 4,·Ins:eecS_iol1Y
All work to be performed in the City'streets shall be
......".:.supervised by a .full time inspector retained by.the City.
The cost'of inspection shall .be paid by ;the permittee
prior t,o acceptance by City and prior to Ls suance of
,further permi.tis,.Th?i~section does not apply to public
"works projects under contract with,the City.
SBCTION 5:As-I3uijJ:Dra~ill5:
Permittee will be.required to submt.t; a complete set of
as~built drawings upon'c6mpletion of a project.The
drawings shall :contai~such information as depth,location
Page 3.
...''~..
''':~-:~}I J".....~'.c'. ',.,.....~,..~-'....
"~"'
t c... • .
from the street centerline or the rtght:-of-way line,size,
type of material'and any other information that may be
useful in locating the completed work at a 'futt:tre <;late •.
S€CTIONl6.·Standard Street S'ections I==+
All City streets shall be 'constructed acc6rding to the
.··,specifications and details .shown on the standard street
"sections marked Exhibits "Aft.and'"13 11.attached hereto and.
by.this reference made a part of this code.
~ECTION 7iDrivewax§1
Dr:iveways shall'not ~xceed'jO%of the fJ;ontae;e of the
p~operty along the street on which the driveway is to be
constructed.Driveways shall be..nor less than 1:0 feet nor
"more than 30 feet in width.The exact 't-Tidth shall be '
determined by the Street Superintendent.Driveways shall
."be a minimum of,6"deep.Where driveways are constructed
.over an existing ,drainage ditch,a·culvertshali be installed.
The size of the culvert shall be determined bythe'Street
.Superintendent.
SECTION 8:
All driveHays,paving,'curbing',fencing,tiling of ditches
or:any other ~ype of workwithirt the City rights-of-way
will not be,allowed without,first obtaining'a permit fbr
such work from the City Street Department.,The permits
.~aybe obtained at the Street Department o(fice at nocost~
Variances:...._-.,....".
:The permittee may,by application in,\~iting,request a
variance from the Code'requirements where it can b~shown
that undue hardship'wou Ld otherWise ,result.
SECTION 10:Sign Removal:
~Hi utiU..t y installers"cC?,tl~ractors or others shall notify
'the City Street Depar-tment;of the need for removing any
sign on'Cityright-of~way.·The notice shall be given 24
hours in advance of such removal.'The Street Department
. s hal l,remove the sign,and replace it again at no char-ge ,
",.,,.
.If:a .sign 'is re~oved by anyone o·ther,than the 'Street
Department,.S:char-ge will he "made for the work involved .
in replacing the:sign and for th~cost of the s Lgn t Ltrae l.f ;:
Irt addition,unauthorized removal of signs shall be subject
to ~he penalties provided'for in applicable ordinance~.
Page'4'~
'\'
,~ECTIO!11:All or-d Lnancea or".P?:r:ts of'or,dinances'in conflict
herewith are hereby repealed.
S€CTION 12:'This ordinance shall:t.ake effect'from and after itsa ,
passa.ge,approva.l and five (5)daYs following its pu!:?lication as
requir~d bY·law.
'PASSED by the City Council of the City qf Marysville this //day
.of 1970 •
,C~TY OF MARYSVILLE
,ATTEST I
City Clerk
By s
,'
I 'V