HomeMy WebLinkAboutO-2332 - Amends Sec. 18C.10.010, school impact fee (Repealed by 2852)CITY OF MARYSVILLE
Marysville, Washington
ORDINANCE NO. 2 3 3 2
AN ORDINANCE OF THE CITY OF MARYSVILLE AMENDING MMC
18C.10.010 RELATING TO SCHOOL IMPACT FEES.
THE CITY COUNCIL OF THE CITY OF MARYSVILLE, WASHINGTON
DO ORDAIN AS FOLLOWS:
Section 1. MMC 18C.10.010 is hereby amended to read as
follows:
18c.10.010 Fee required.
(1) Each development activity, as a condition of
approval, shall be subject to the school impact fee
established pursuant to this title. The school impact fee
shall be calculated in accordance with the formula
established in Table 1 below. The school impact fee
calculated in accordance with the formula established in
Table 1 of this chapter shall then be multiplied by .75 to
determine the school impact fee due and payable by the
applicant.
TABLE 1
Impact Fee Calculation Formula
A. General. The formula in this section provides the
basis for the impact fee schedule for each district serving
the city of Marysville. District capital facilities plans
shall include a calculation of its proposed impact fee
schedule, by dwelling unit type, utilizing this formula. In
addition, a detailed listing and description of the various
data and factors needed to support the fee calculation is
included herein and within Chapter 18C.04 MMC, Definitions.
E. Determination of Projected School Capacity Needs.
Each district shall determine, as part of its capital
facilities plan, projected school capacity needs for the
current year and for not less than the succeeding five-year
period. The capital facilities plan shall also include
estimated capital costs for the additional capacity needs,
and those costs shall provide the basis for the impact fee
calculations set forth in this section.
ORDINANCE - 1
/wpf/mv/lBC.lO.OlO.orZ 9/12/2000
C. Cost Calculation by Element. The fees shall be
calculated on a "per dwelling unit" basis, by "dwelling unit
type" as set forth below.
1. S,ite Acquisition Cost Element.
([B(2) X B(3)I + B(l)} X A(1) = Site Acquisition
Where :
B(2) = Site Size (in acres, to the nearest l/lOth)
B(3) = Land Cost (per acre, to the nearest dollar)
B(1) = Facility Design Capacity (see MMC 18C.04.020)
A(1) = Student Factor (for each dwelling unit type -
Cost Element
see MMC 18C.04.020)
The above calculation shall be made for each of the
identified grade levels (e.g., elementary, middle, junior
high and/or senior high). The totals shall then be added with
the result being the "total site acquisition cost element"
for purposes of the final school impact fee calculation
below.
2. School Construction Cost Element.
[C(1) + B(1)I x A(1) = School Construction Cost
Element
Where :
C(1) = Estimated Facility Construction Cost (see MMC
18C.04.020)
B(1) = Facility Design Capacity
A(1) = Student Factor (for each dwelling unit type)
The above calculation shall be made for each of the
identified grade levels (e.g., elementary, middle, junior
high and/or senior high). The totals shall then be added and
multiplied by the 'square footage of permanent facilities
divided by the total square footage of school facilities,
with the result being the "total school construction cost
element" for purposes of the final school impact fee
calculation below.
.ORDINANCE - 2
lwpflmv/iac.io.oio.or2 8/11/2000
3. Relocatable Facilities (Portables) Cost Element.
[E(l) P E(2)I x A(1) = Relocatable Facilities Cost
Element
Where :
E(1) = Relocatable Facilities Cost
E(2) = Relocatable Facilities Student Capacity (see
MMC 18C.04.020)
A(1) = Student Factor (for each dwelling unit type)
The above..calculation shall be made for each of the
identified grade levels (e.g., elementary, middle, junior
high and/or senior high). The totals shall then be added and
multiplied by the square footage of relocatable facilities
,divided by the total square footage of school facilities,
with the result being the "total relocatable facilities cost
.element" for purposes of the final school impact fee
calculation below.
D. Credits Aqainst Cost Calculation - Mandatorv. The
following monetary credits
calculated cost elements de
calculating the final schoo
1. State Match Credit.
D(1) x D(3) x D(2) x A
Where :
D(1) = Boeckh Index
hall be deducted from the
ined above for purposes of
impact fee below.
1) = State Match Credit
(see MMC 18C.04.020)
D(3) = Square footage of school space allowed per
student, by grade span, by the Office of the
Superintendent of Public Instruction
D(2) = State Match Percentage (see MMC 18C.04.020)
A(1) = Student Factor (for each dwelling unit type)
The above calculation shall be made for each of the
identified grade levels (e.g., elementary, middle, junior
high and/or senior high). The totals shall then be added with
the result being the "total state match credit" for purposes
of the final school impact fee calculation below.
ORDINANCE - 3
/vpf/m"/lsC.lo.olo.or2 8/11/2000
2. Tax Payment Credit.
Tax Credit ((1 * F11))101 ~ Ix F(2) x F(3) =
F(1) (1 + F(1))lO
Where :
F(1) = Interest Rate (see MMC lSC.04.020)
F(2) = District Property Tax Levy Rate (see MMC
18C.04.020)
F(3). = Average Assessed Value (for each dwelling unit
type - see MMC 18C.04.020)
E. Adjustments Against Cost Calculation - Elective by
District. .Recognizing that the availability of other sources
of public funds varies among districts, each district may
provide an additional credit against school impact fees which
the district determines will provide the best balance in
school impact fees and other sources of local public funds
.available to the district.-.This adjustment may reduce, but
may not increase, the school impact fee from the 'amount
determined by application of the elements identified above.
The.adjustment, if any, applied by the district shall be
specified within the capital facilities plan adopted by the
city.
" system improvement funding within the district, between
F. Calculation of Total Impact Fee
1. The total school impact fee, per dwelling unit,
.assessed on a development activity shall be the sum of:
Total Site Acquisition Cost Element
Total School Construction Cost Element
Total Relocatable Facilities Cost Element
minus the sum of:
Total State Match Credit
Total Tax Payment Credit
Elective Adjustment by District
expressed in total dollars per dwelling unit, by
dwelling unit type.
2. The total school impact fee obligation for each
development activity pursuant to the school impact fee
schedule of this chapter shall be calculated as follows:
ORDINANCE - 4
/vpf/mv/l8~.~0.0~O.or2 8/11/2000
Number of Dwelling Units, by Dwelling Unit Type
multiplied by
School Impact Fee for Each Dwelling Unit Type
less
the value of any in-kind contributions proposed by the
developer and accepted by the school district, as
provided in this chapter.
Section 2. If any section, subsection, sentence,
.clause, phrase or word of this ordinance should be held to be
invalid or unconstitutional .by a court of competent
jurisdiction, such invalidity or unconstitutionality thereof
shall not affect the validity or constitutionality of any
other section, subsection, sentence, clause, phrase or word
of this ordinance.
D by the Cit C unci1 and APPROVED by the Mayor * , 2000.
CITY OF MARYSVILLE
ATTEST :
Approved as to form:
BY GRANT K. WEED, City Attorney
Date of Publication:
Effective Date (5 days after publication):
ORDINANCE - 5
/up€/m"/l0C.10.010.or2 8/11/2000