HomeMy WebLinkAboutO-2552 - Adds Sec. 14.18.110, Marysville area regional storm water ponds and conveyance systems (14.18).-------~-----------------------------------..,..
r,..\,1 ,
~.':l ...'-0'
CITY OF MARYSVILLE
Marysville, Washington
ORDINANCE NO.J,SSJ--
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
MARYSVILLE WASHINGTON ADDING A NEW SECTION
14.18.110, TO THE MARYSVILLE MUNICIPAL CODE RELATING
TO REGIONAL STORM WATER PONDS AND CONVEYANCE
SYSTEMS; AND ESTABLISHING POLICY,PROCEDURES AND
PRIORITIES FOR COMMERCIAL PROPERTIES TO CONNECT
TO MARYSVILLE AREA REGIONAL STORM WATER PONDS
AND CONVEYANCE SYSTEMS.
~CO~
~!?d-
/11A':.-5C-
<c
WHEREAS, by Chapter 14.16 of the Marysville Municipal Code the City
provides for the establishment of public storm water systems;
WHEREAS, MMC 14.18.060 provides for the construction of regional
drainage facilities;
WHEREAS, the City began construction in April 2004 and is about to
complete construction of the North Marysville Area Regional Storm Water Pond and
Conveyance System;
WHEREAS, subject to adequate funding and demand, it is anticipated that
other storm water ponds and conveyance systems may be constructed to promote
economic development;
WHEREAS, the City Council now wishes to establish policy, procedures and
priorities for commercial properties to connect to such ponds and conveyance systems;
NOW, THEREFORE, the City Council of the City of Marysville do ordain as
follows:
Section I.A new section 14.18.110 entitled "Marysville Area Regional Storm
Water Ponds and Conveyance Systems" is hereby added to the Marysville Municipal
Code which shall read as follows:
ORDINANCE - 1
W/wpf/mv/ord.ponds
..,,.
e >.•
14.16.110 MARYSVILLE AREA REGIONAL STORM WATER
PONDS AND CONVEYANCE SYSTEMS
In addition to any other requirements of the Marysville Municipal Code, and in
particular Chapters 14.16 and 14.18 MMC, the following policies, procedures and
priorities are hereby established for connection to and use of all Marysville Area
Regional Storm Water Ponds and Conveyance Systems which are now or hereafter
constructed by the City of Marysville:
(a) Regional Storm Water Ponds and Conveyance Systems shall only be
used to receive waters from commercial or industrial development on
properties bearing the zoning designations of Community Business, General
Commercial, Mixed Use, Light Industrial or Business Park.
(b) Connection to and discharge into any Regional Storm Water Pond and
Conveyance System shall not be made, until the applicant has been issued a
building permit for commercial or industrial development on a property
bearing one or more of the zoning designations referenced in MMC
14.16.l50(a)above.
(c) All Regional Storm Water Ponds and Conveyance Systems have a
limited capacity. Acceptance of an application and discharge into the system
shall be contingent upon available capacity. Applications shall be given
priority based upon the date the initial deposit has been received as referenced
in subsection (e) below bythe City.
(d) A fee for connection to all regional stormwater drainage facilities shall
be established by the City Engineer. Said fee shall be determined by
calculating the total cost of the detention facility and dividing said cost by the
cubic feet of as built capacity. Total cost shall include land acquisition, design,
construction, construction management, City staff overhead and
environmental/ecological mitigation.
(e) All properties qualifying to connect to a regional stormwater drainage
facility shall pay a nonrefundable 10% deposit for the connection fee at the
time of City receipt of an application for connection to the regional stormwater
facilty following the effective date of this ordinance. Said application shall
describe the property to be served by the regional stormwater facility, the
proposed development, and the storage volume requested.An additional 10%
ORDINANCE - 2
W/wpf/mv/ord.ponds
refundable deposit shall be paid at the time of City receipt of any building
permit application on the described property which must be within one hundred
twenty (120) days of the City receipt of the approved regional pond application
or right to capacity within the stormwater drainage facility shall be forfeited.
The balance of the fee shall be paid at the time of issuance of the first building
permit for the property to be served.If a building permit has not been issued
within one hundred twenty (120) days of the City receipt of a building permit
application the right to capacity within the stormwater drainage facility shall be
forfeited. The City may grant a time extension of up to 120 days for building
permit if substantial progress has been made by the applicant to complete
design and construction plans to receive permit approval.
(D Non-transferability.All rights conferred by this ordinance shall inure
solely to the development applicant and shall not be transferable, sold, assigned
or in any way conveyed to any third party. Said rights shall not run with the
land and shall inure solely to the benefit of the development applicant.
PASSED by the City Council and APPROVED by the Mayor thisJ3~day of
~r,2004.
~
CITY OF MARYSVILLE
BY~-X/W
DENNIS KENDALL,Mayor
ATTEST:
Approved as to form:
By /j~W..J;)
GR1\NT K.WEED,City Attorney
Date of Publication:/:<../5·Of-
Effective Date (5 days after publication):I;l.-;l.O·01
ORDINANCE - 3
WIwpllll1v/ord.ponds
1