Loading...
HomeMy WebLinkAboutR-0647 - Employing Wm. P. Harper & Son & Company of Seattle Wa and Porter, Barry & Associates of Baton Rouge, Louisiana to perform certain services before theRESOllJT10N NO.0c1-/7 ) , , A RESOllJT10N of the City of'fYl..alUfl11A employing Wm.P.Harper &Son &.CODIp~0 Seattle,Washington and Porter,Barry & Associates of Baton Rouge,Louisiana,to perform certain services before the Federal Power ColIlIIIi.ssion,certain engineering ser- vices,and certain services in connection with the issuance and sale of Natural Gas Revenue Bonds and for the payment thereof. WHEREAS,within the last year there bas developed a strong probability that a sup~of natural gas will be aVailable in different parts of the State of Washington in the near future.Efforts are at / present be ,/made by several different parties to obtain authority frCIII th Federal Power Commission to pipe adequate supplies of natural to the cities and industrial areas of the State.A hearing on engineers and financial advisors and agents for and in behalf Of the City to handle the tec11nical utters in conneetdcn therewith;' same shall be available frCIII any responsible source.It is therefore con- an adequate supply of gas is to be assured it will be necessary to inter- dealer and Po!'1;er,Barry &.Associates,consulting engineers of Baton Rouge, vene and establish the need and methods of payment therefore.If,as and be made by the transporting cClllpanies OOt left to local effort,either mun- icipal or otherwise;and l , WHEREAS,the City of ht.«l-l/'lMLLt.,Washington,desires.to be in a position to obtain an adequate supply for the collllllUIlity whenever the when such supplies of natural gas are available,local dis~ibution may not Nai,THEREFORE,BE IT nESOLVED by the COlUlQU (Commission)of the City of~'V)l11eL "Washington,as foli~:,. SECTION 11 That the City of )JL(3.-~hereby employs Wm.P.Harper &Son &.Compa~of Seattle (hereinafter referred to as "The Comp~·)whose principle bu5iness is that of financial agent and security sidered that in order to be in a position to prClllptly furnish such service, public convenience and necessity require the employment of competent counsel,., i l; \ \ I, ,-I 1 gas /.r'_../r~this matter ill now pending before the Federal Power Colllllli.ssion and if ~ i • '-.;." , .-~ • •2 - Louisiana (hereinafter referred to as "The Engineers-)'whose principle , business is that of designing plants and distributing systems for natural gas and supervising the construction thereof,such EIlIployment being on the foUowing terms and conditions."The Engineers"snd "The Comparv"shall each and severally furnish or perfo:nn the services to the lIIUnicipality as herein set forth,to wit: A."The Engineers"shall 1.Make preliminary survey and prepare preliminary plan:s; 2.Prepare exhibits and engineering report for submission to the Federal Power Commission; 3.Furnish the services of a reputable firm of attorneys qualified and experienced in the Illatters before the Federal Power Commission,it being understood that the municipality will bear the cost of these services from the proceeds of the bond issue if a supply of gas is secured, 4.Assist in the intervention to obtain a supply of natural gas for the municipality by the preparation of necessary infoma- tion and appearing as a witness in the proceedings before the Federal Power Commission; 5.Following allocation of gas,prepare final work- ing pl2DS and specifications and contract documents; 6.Assist the municipality in aWarding of the con- struction contract; 7.Prepare final engineering report for the purpose of giving necessary information to the prospective purchasers of the Natural Gas Revenue Bonds; 8.Maintain a full-time resident engineer on the project in order that the municipality may be assured of conformity with the plans and specifications. B."The COlIIPazv'sha1l 1.Prepare and recommend a:plan of 1;inaneing,includ- ing JIl8turitiss,call features,etc.,of a bond issue,together with a feasib- ility report showing coverage arufesti)nated earmngs; " :,t.,:-c.'~,"i" -3 • 2.Prepare and submitf'inancial plans and shoWing of feasibility for use in hearing before the Federal Power COIIllllission; 3.Prepare the Plan and System Resolution and other proceedings incident to the voting on the proposed financing; 4.Furnish all legal proceedings up to the time of the issuance of the bonds; S.Furnish a bid upon request tor the financing at the ti,me the bids are called for on the work; 6.Furnish printed bonds;ready for execution by the municipal authorities. SECTION II:For and in consideration of the above services there sllall be paid to "The Company"and "The Engineers"a combined fee equal to 9%of the bonds sold exclusive of the llIllOunt of escrowed interest. Of the total fee of 9%there shall be paid 7%when the bonds sllall have been sold.and·the remainder of said fee shall be paid 1%when the work:is substantial]y one-half completed,the balance when the construction of the plant shall have been completed and the work accepted.There shell be no contingent liability to the municipality as to cost of such services herein referred to,unl.ese and until bonds have been issued and sold,and the funds received. SECTION III:This employment shall continue until five years from the date of signing hereof and may be extended by'llIUtual consent. ATTEST: ftj.;f tr n.2~ DATED:[)it.I ~.1 Cf ~..:-. •• The terms of this Resolution are aclmowledged and approved. WASHINGTON - WH.P.HARPER &SON &COMPANY