Loading...
HomeMy WebLinkAboutR-0896 - Approving Street Department Construction Projects for 1978ATTEST: 7' / CIT Y 0 F M.A R Y S V ILL E Marysville,Washington RESOLUTION NO.C 9~ A Resolution of the City of Marysville approving Street Department Construction Projects for 1978. BE IT RESOLVED BY THE CITy COUNCIL OF THE CITY OF MARYSVILLE,WASHINGTON AS FOLLOWS: Section 1.The Street Department Construct~on Projects for the year 1978,as described in Exhibit "A" attached hereto,are hereby approved. Section 2. The Street Department is hereby authorized to proceed with the said Construction Projects fifteen (IS)days ifter publicaton of this Resolution and the attached exhibit. PASSED by the City Coucil and APPROVED by'the Mayor this --3']"II day of .J U be',1978. THE CITy O~MARySVILLE'.\I' BY~'~ M KY 0 R '.'I,. ~··f·...."\,."} ;.i '."f,~..,.("'. ,l,~",!....\.'~>,•\''I..~..I BY'~liJetL, APPROVED AS TO FORM: ·' EXHIBIT "A" LINNIHAN APARTHENTS 518 QUINN AVENUE CURB AND GUTTER PAVING PROJECT #T -041 -78A Project consists of preparing and paving between new Curb and Gutter and existing street and between curb and sidewalk. PREPARATION: 251.26 70.35 22.10 64,,00 48.00 36.00 16.20 10,,00 2.00 519.91$ $-..- --- 40 manhours - - --- - 281.fringe benefits -- 10 cubic yards @ $2.21 cu.yd.- 8 hours @ 8.00 per hour - - - 8 II @ 6.00 "II 8 II @ 4.50 " " 12 II @ 1.35 " " 2 "@ 5',,00 "II 1 "@ 2.00 II II -----,---:--:-- TOTAL -PREPARATION - Labor - - - - - - Labor - - - - Crushed Rock -- Grader - - - - - J.D.Loader - - - 66 Dump Truck Pickups - - - - - 8 Ton Roller 12 Ton Trailer PAVING: Labor - - - -80 manhours - - - - - - - - - Labor - - - - - -28%fringe benefits -,-- - - - - Asphalt - - - - -100 tons @ $14.00 per ton - - - Tack - - - - - -40 gals.@ .40 per gallon - - 73 Dump Truck - -10 hours @ 7.50 per hour - 66 Dump Truck - -12 II @ 4.50 II II _ _ _ Pickups - - - - -16 II @ 1.35"II _ Paving Box - - -10 "@ 3;00 II II _ - _ 8 Ton Roller 8"@ 5.00 II "-- - 1 Ton Roller 8"@ 1.50"II - - - Tack l-!achine - - 2 ,,@ .75 II II _ _ _ 12 Ton Trailer _1 II @ 2.00 II II _ TOTAL -PAVING $502;,52 ·14°.71 1,400.00 16.00 75.00 54.00 21.60 30.00 40.00 12.00 1.,50 2.00 :I;2,295.33 TOTAL -JOB DUPLEX 1619 -1621 -SIXTH STREET CURB AND GUTTER PAVING PROJECT #T -041 - 78B Project consists of preparing and paving between new.Curb and Gutter and existing street. PREPARATION: Labor - - - - - - 30 manhours - - - - - - - - - - - $188.45 Labor - - - - 28~fringe benefits ...52.77------- Crushed Rock 33 cubic yards]@-$2.21 cu.yd.-72.93 Grader ---4 hours @ $8;00 per hour 32.00 J.D.Loader - - -4 II @ 6.00 II 11 24.00 66 Dump Truck 4 II @ 4.50 II II 18.00 Pickups 6 II @ 1.35 II II 8.10--- - - 8 Ton Roller 1 II @ 5.00 II II 5.00 12 Ton Trailer -1 11 @ 2.00 II II --2.00 TOTAL -PREPARATION $403.25 PAVING: Labor ---- - - 20 manhours - - - - - ,----$125.64 Labor - --- - - 2810 fringe benefits --- - - 35.18 Asphalt - ----26 tons·@ $14.00 per ton 364.00 Tack - ---- - 6 gals.@ .40 pel'gal.2.40 73 Dump Truck - -4 hours @ 7.50 per hour - - 30.00 66 Dump Truck - -4 II @ 4.50 11 11 18.00 Pickups -----6 11 @ 1.35 II 11 8.10 Paving Box ---4 II @ 3.00 II 11 12.00 8 Ton Roller -..2 II @ 5.09 II II 10.00 1 Ton Roller --4 II @ 1.;50 II 11 6.00 Tack r-1achine 1 11 @ .75 II 11 .75 12 Ton Trailer -1 II @ 2.00 II II 2.00 TOTAL -PAVING -$614.07 TOTAL -JOB $1.017.32 .. CLIFF SANDS 1115 -FIFTH STREET CURB AND GUTTER PAVING PROJECT #T -041 -78C Project consists of preparing and paving between new Curb and Gutter and existing street and between curb and sidewalk. PREPARATION: Labor - - - - 60 rnanhours -------- - --$376.16 Labor - - - - 28~fringe benefits - - --- - - 105~32 Crushed Rock 33 cubic yards @ $2.21 cu.yd.-72.93 Grader ---14 hours @ $8.00 per hour 112.00 J.D.Loader -14 II @ 6.;00 II II 84.00 73 Dump Truck 4 II @ 7.50 II II 30.00 66 Dump Truck 14 II @ .4.;50 "II 63.00 Pickups ---10 II @ 1.35 II II 13050- - 8 Ton Roller 2 II @ 5.00 II II 10.00 TOTAL-PREPARATION $866.91 PAVING: Labor - ---44 manhours - --- - - - $285.03 Labor -- --28~fringe benefits - - -- - 79.81 Asphalt -40 tons @ $14.00 pe;o ton - - - 560.00 Tack 20 gals.@ .40 per gallon 8;00 73 Dump Truck 6 hours @ 7.50 per hour 45.00 66 Dump Truck - - 8 II @ 4.;50 II II 36.00 Pickups -- ---12 II @ 1.35 "II 16.20 Paving Box -6 II @ 3.00 II II 18.00 8 Ton Roller 6 II @ 5.00 II II 30.00 1 Ton Roller 8 II @ 1.50 II II 12.00 Tack Uachine 2 II @ .75 II II 1.50 12 Ton Trailer -1 II @ 2.00 II II 2.00 TOTAL -PAVING $1,093.54 TOTAL -JOB $1,960.45 .. UNITED INSURAl'lCE AGENCIES,INC. 1803 GROVE STREET CURB Al'lD GUTTER PAVING l PROJECT #T -041 -78D Project consists o£preparing and paving between new Curb and Gutter and existing street and between curb and sidewalk. PREPARATION: Labor - - -""--37 manhours - - - ------$231054 Labor -- - .,.28~£ringe bene£its - - - ----64.83 Crushed Rock --18 cubic,yards @$2.21 cu.yd.-39.78 Grader -...-.--2 hours @ $8.00 per hour --16.00 J.D.Loader ""--10 II @ 6.00 II II 60.00 66 Dump Truck ""10 II @ .4.50 II II --45.00 Pickups -- - 4 II @ 1.35 II "5.40 8 Ton Roller 1 II @ 5.00 II "5.00-- TOTAL -PREPARATION -$467.55 PAVING: Labor ----25 manhours -- -------$157.06 Labor ----28~£ringe benefits -- ---43.98 Asphalt - -- --18 tons'@ $14.00 per ton ---252.00 Tack -- - - 10 gals.@ .40 per gallon 4.00 73 Dump Truck 3 hours @ 7.50 per hour --22.50 66 Dump Truck 5 "@ 4.50 II "22050 Pickups - - - 6 "@ 1.35 11 11 8.10 Paving Box ---3 "@ 3.00 "11 9.00 8 Ton Roller 1 "@ 5.00 "II 5.00 1 Ton Roller - - 3 II @ 1050 "II 4050-- Tack Machine - - 1 11 @ .75 "11 .7~ 12 Ton Trailer -1 "@ 2.00 " " 2.00 TOTAL -PAVING -:I>531.39 TOTAL -JOB -:I>998.94 .. WESTERGREEN SHEET METAL -41l.th.AVENUE CURB AND GUTTER PAVING PROJECT #T -OU - 78E Projec·t consists:of preparing and paving between new Curb and Gutter and existing street and between curb and sidewalk. PREPARATION: Labor ...;...;- ---64 manhours --------- Labor - - - - 28~fringe benefits ------- Crushed Rock -..;33 cubic yards @'$2.21 cu.yd...; Grader ---12 hours @$8.00 per hour -- J .D.'Loader -12 II @ 6.00 II II 73 Dump Truck - - 12 II @ 7050 11 II -- 66 Dump Truck 12 11 @ 4.50 II II Pickups ---6 II @ 1;35 II II 8 Ton Roller 2 II @ 5.00 11 II TOTAL -PREPARATION $308.82 86.47 72.93 96.00 72;00 90.00 54.00 8.10 10.00 PAVING: Labor ---..44 manhours - ---- ----$285.03 Labor --- - 28~fringe benefits -,-- --79.8l Asphalt ---39 tons'@ $U~.OO per ton --546.00 Tack ----25 gals.@ .40 per gallon -10;00 73 Dump Truck ..-6 hours @ 7050 per hour - - 45.00 66 Dump Truck --8 II @ 4.50 II 11 36.00-- Pickups --- --10 II @ 1.35 II II 13.50 Paving Box ---5 11 @ 3.00 "II 15.00 8 Ton Roller --3 11 @ 5.00 II II 15.00-- 1 Ton Roller 6 II @ 1.50 II II 9.00 Tack ~fachine --2 II @ .75 II II 1050 12 Ton Trailer 1 11 @ 2.00 11 11 2.00• TOTAL -PAVING $1.°57.84 TOTAL -JOB $1.856.16 .1 •....' .. FRED GROTIS I'1INI HAREHOUSES -44th.AVENUE CURB AND GUTTER PAVING PROJECT #T -oU - 78F Project consists of preparing and paving between new Curb and Gutter and existing street and betwoen curb and sidewalk. PREPARATION: Labor - - - - Labor - - - - Crushed Rock Grader - -...; J.D.Loader - 73 Dump Truck ...;- 66 Dump Truck Pickups - ---...; 8 Ton Roller 12 Ton Trailer PAVING: 64 manhours - - - - - - - - -$ 28~fringe benefits - - - - - 28 cubic yards @.$2.21 cu.yd.- 8 hours @ $8.00 per hour - - 8 II @ 6.00 II II 2 II @ 7.50 II II 8 II @ 4.50 II II 12 II @ 1.35 II II 2 II @ 5.00 II II 1 II @ 2.00 II II TOTAL -PREPARATION -$ UO.67 114.99 61.88 64.00 48.00 15.00 36.00 16.20 10.00 2.00 778.74 Labor -- - - 34 manhour-s --- - --- - ---$222.22 Labor --28~fringe benefits -------62.22 Aspha.1t 28 tons .@ $14.00 per ton ,392.00--.-'-... Tack --20 gals.@ .40 per gallon -8.00 73 Dump Truck - -4 hours @ 7.50 per hour - - 30.00 66 Dump Truck - - 6 II @ 4.50 II II -...27.00 Piokups - - - 8 II @ 1.35 II II 10.80-- Paving Box -6 ·11 @ 3.00 II II 18.00-- 8 Ton Roller -..2 II @ 5.00 II II 10.00- - 1 Ton Roller --4 II @ 1.50 II II 6.00 Taok Maohine --1 II @ .75 II II .75 12 Ton Trailer -1 II @ 2.00 II II 2.00 TOTAL -PAVING $788.99 TOTAL -JOB -$1,567.73 • • ,. LIBERTY LANE REBUILD WEST END PROJECT #T -051 - 78 Project consists of rebuilding west end of Liberty Lane by installing two catch basins,grading and reshaping approxi- mately the last 120 feet and asphalting of same.Developer to the west,Dujardin Custom Homes,Inc.gave the City $600.00 towards the cost of this and they also extended their storm line to the end of their property. PREPARATION: Labor - - - - - -128 manhours - - - - - - Labor - - - - - -28%fringe benefits -- Crushed Rock 55 cubic yards @ $2.21 cu.yd.- CB 15 Bases - - -2 @ $78.83 - - - - - - Frame &Grates - 2 @ 104.52-- - - - - - - 6 11 Plastic Pipe -100 feet @ $1;49 foot 4 11 Plastic Pipe -36 feet @ .32 foot - - - - Grader - - - - -12 hours @ $8.00 per hour J.D.Loader - - -20 II @ 6.00 II II.__ 73 Dump Truck - -·.•4 II @ 7.50 II II 66 Dump Truck 16 II @ 4.50 II II Pickups - - - - -32 II @ 1.35 II II 8 Ton Roller 4 II @ 5.00 II II TOTAL -PRE~ARATION PAVING: $821.32 229.97 121.55 157.66 209.04 J49.00 11.52 96.00 120.00 30.00 72.00 43.20 20.00 $2,081.26 Labor ----20 manhours -- - -- - - - - $125.64 Labor ..-- ---28%fringe benefits -------35.18 Asphalt ---40 tons·@ $14.00 per ton 560.00 Tack - ---5 gals.@ .40 per gallon -2.00 73 Dump Truck - -4 hours @ 7.50 per hour 30.00 66 Dump Truck - -4 II @ 4.50 II II 18.00 Pickups - - - - - 6 II @ 1.35 II II 8.10 Paving Box -- - 4 II @ 3.00 II II 12.00 8 Ton Roller --2 II @ 5.00 II II 10.00 1 Ton Roller --4 II @ 1.50 II II 6.00 12 Ton Trailer 1 II @ 2.00 II II 2.00 TOTAL -PAVING $808.92 .1 TOTAL -JOB $2,890.18