Loading...
HomeMy WebLinkAboutR-1357 - Amending the City's cost sharing policy for voluntary sidewalk construction and repair by private property owners·, CIT Y 0 F MAR Y S V ILL E Marysville,Washington RESOLUTION NO.13S7 A RESOLUTION OF THE CITY OF MARYSVILLE AMENDING THE CITY'S COST SHARING POLICY FOR VOLUNTARY SIDEWALK CONSTRUCTION AND REPAIR BY PRIVATE PROPERTY OWNERS. WHEREAS,on July 1,1982,the City enacted an optional one- half percent sales tax pursuant to RCW 82.14.030(2);and WHEREAS,it was the intention of the City in enacting said tax to utilize the proceeds by providing the benefit of public works improvements to the taxpayers and property owners of the City;and WHEREAS,the City Council finds that the construction and repair of sidewalks on public right-of-way is a priority need in the City,and would constitute a proper utilization of the sales tax proceeds;and WHEREAS,the City Council desires to amend the policy established by Resolution 1122 which was adopted on March 12, 1984;NOW,THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF MARYSVILLE,WASHINGTON,AS FOLLOWS: section 1.Voluntary sidewalk Construction and Repair Program.The City hereby adopts the policy of actively encourag- ing voluntary construction and repair of curb,gutter and sidewalk improvements on public right-of-way by all property owners in the City.the provisions of this Resolution shall apply to all persons participating in said program with the exception of the following: (a)Persons who are required to construct curbs, gutters and sidewalks pursuant to Section 12.02.170 of the Marysville Municipal Code. (b)Persons who are required to construct curbs, gutters and sidewalks by the conditions of a Resolution - 1 .' subdivision approval,a Conditional Use Permit,or Mitigation Contract. section 2.City Participation.The City agrees to participate in all voluntary construction and repair projects referred to in Section 1 above by performing all required surveying and engineering services,by contracting for labor and materials needed on the project,by performing inspection and approval services,and by paving the street from the point of its former edge to the new curb line.Provided,that the city's participation with respect to commercial properties shall be limited to repair and replacement of existing curb,gutter and sidewalk facilities and shall not apply to new construction where no such improvements previously existed. section 3.Residential Property Owner participation.As a pre-condition to City participation on a project abutting residential property,the property owner shall do the following: (al Dedicate to the city sufficient property to widen the abutting pUblic right-of-way to the full width as measured from the design centerline so as to conform to the applicable road standards specified by the city Engineer;or prove to the satisfaction of the City Engineer that such pUblic ownership already exists. (b)Pay the city the sum of $10.00 per lineal foot of proposed construction. Section 4.Commercial property Owner Participation.As a pre-condition to City participation on a project abutting commercial property,the property owner shall do the following: (al Dedicate to the city sufficient property to widen the abutting public right-of-way to the full width as measured from the design centerline so as to conform to the applicable road standards specified by the City Engineer;or prove to the satisfaction of the City Engineer that such pUblic ownership already exists. (b)Pay the city 50 percent of all actual costs incurred by the city on the project. Section 5.Reimbursement to City in Certain Cases.If, within two years following completion of construction,a residential property owner or its successor develops its property in such a way as to trigger the mandatory curb,gutter and sidewalk construction provisions referred to in paragraphs (a) and (b)of Section 1 above,said property owner,or its succes- sor,shall be required to reimburse the City for the reasonable Resolution - 2 -l cost of its participation in the original curb,gutter and sidewalk project.Said reimbursement shall be a pre-condition to final approval of any development permits on the property. section 6.Duration of policy.This policy shall continue in force and effect subject to modification or termination by the city Council at the time of adoption of each annual Budget Ordinance. ~ADOPTED by the City ~day of 2Z'l€?if Council and APPROVED by the Mayor this ,1989. CITY OF MARYSVILLE By Attest: BY~~RR Approved as to form: By0\-2e"-«"12"e pc ftt'4?./~'~ITY ATTO EY Date of Publication:IV/IhC---_ ,N/fbEffectiveDate(5 days after pUblication): Resolution - 3