Loading...
HomeMy WebLinkAboutR-1633 - Adopting a six-year transportation improvement program (1994-1999) including an arterial street construction program in accordance with the regulation·.'. CIT Y 0 F MAR Y S V ILL E Marysville,Washington RESOLUTION No.A:;.3) A RESOLUTION OF THE CITY OF MARYSVILLE ADOPTING A SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM (1994-1999) INCLUDING AN ARTERIAL STREET CONSTRUCTION PROGRAM IN ACCORDANCE WITH THE REGULATIONS OF THE URBAN ARTERIAL BOARD. WHEREAS,the City Council of the City of Marysville,Washington pursuant to RCW 35.77.010,held a public hearing on July 12,1993 for the purpose of revising and extending its Comprehensive Six-Year Transportation Program and for the purpose of adopting an Arterial Street Construction Program in accordance with the regulations of the Urban Arterial Board;and WHEREAS,the City Council has reviewed the current status of City streets and has considered the testimony and exhibits presented at the public hearing,and finds that the programs presented by the Public Works Department are in the long-range best interests of the City; NOW,THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF·THE CITY OF MARYSVILLE, WASHINGTON AS FOLLOWS: 1.The Comprehensive Six-Year Transportation Improvement Program (1994-1999)presented to the City Council,copies of which are on file and open to public inspection at the office of the City Clerk, is hereby approved and adopted in its entirety. 2.The Six-Year Program for Arterial Street Construction utilizing urban arterial trust funds in accordance with the regulations of the Urban Arterial Board,as presented to the City Council,copies of which are on file and open to public inspection at the office of the City Clerk,is hereby approved and adopted in its entirety. 3.The City Clerk is hereby directed to file copies of said Programs with the Secretary of Transportation and the Urban Arterial Board. PASSED by the City Council and APPROVED by the Mayor this 12th day of July,1993. CITY OF MARYSVILLE RESOLUTION - 1 it . • ATTEST: By~l~ITYCLERK Approved as to form: BY~.W~ •CITY ATTORNEY RESOLUTION - 2 CITY OF MARYSVILLE 1994-1999 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY, CITY NO., COUNTY NO.: MARYSVILLE 0745 31 HEARING DATE, ADOPTION DATE: RESOLUTION NO. , JULY 12,1993 JULY 12,1993 1633------------------------------------------------------------------------------------------------------------------------------- Fe P Me we P'S NL R AL 00 NT C A I PROJBCT ID JAR D TOTAL D A T 8 n WORX DESCRIPTION R S J:II:LENGTH Q T I ---------------------------------------------------------I ·-- -- -- - - - -- --- -- -- - - - -- - - - - - - - - ·--.- -- - - - -.-- -- -.-- - - - - - -- - ·---..----- --.-- - - - - ---- - - - - - COPT312100238 P.A.PROJECT NO. ................................/··..···1······/..····1 P.A.PROJECT NO. J P.E.I 20 I I / R/W 1 1 / I CONST. I 200 I I I TOTAL I 220 I I /1 // ///1 ///1 ................................,···..··1······1 ....../ 145 590 Ip.E.1201 I P.A.PROJECT NO.I R/w I I I I CONST. I 560 I I I TOTAL I 580 I I ................................/..·····1··..··/..····1 75 50 CGPTN J P.E.I I I if.A.PROJECT NO.I R/N I I I I CONST. I 125 I I I TOTAL J 125 I I ................................//// 30 320 COPT I P.E.I I I if.A.PROJECT NO.I R/W I t I I CONST. I I J I TOTAL I I 725 125 350 78 LOCAL 180 NAVY 7061 FAUS 80.5 B MIT 140 LOCAL STP 590? TIB 300 700 125 350 RAP.FEDERAL C~PP.OBLIGATION UAT",PLAN 1997 -TOTAL LOCAL rIA FEDERAL UTILITY J I 1994 -r 1997- 1994 1995 1996 1999 FUNDS PUNDS FUNDS FUNDS CODES I I 1996 I 1999 t ----------------------------------------------------1 -----/----I ----I 501 1039 1538 125 243 caPT I P.E.I 3 t I / R/W 1 0 /1 I CONST.I 240 I I I TOTAL I 243 I I 1 / / 1 //1 / / 1 I BTP 162.5 I HBB 125 I 268 213 I CT 20 1 . I 3S 615 650 / I BTP 2201 I CT 20 I TIB 20o? 1 / /. / / I TIB 94? I UATA 941 I·······..·········. / / I HBB 50 I LOCAL 75 I···..·..···········. / / I GKA 50 / p p u u p .38 .38 .67 .80 .10I HI DP'GL AIl.a ABOF • 6 STATE AVENUE:l09TH STREET N.B.TO 13GTH STREET N.E.;ADD WALKWAYS, SHOULDERS,TURN LANES INCLUDING A TWO-WAY LEFT TURN ON STATE AVENUE, ONE SIGNAL AT 136TH AND IMPROVEMENTS TO THE SIGNAL AT 116TH STREET N.E. STATE AVENUE:eeTH STRRET N.E.TO 94TH PLACE N.E.;WIDEN EXISTING ROADWAY SECTION TO FIVE LANES. INSTALLATION OF TRAFFIC SIGNAL AT THE INTERSECTION OP 92ND STREET N.B.AND STATE AVENUE AND IMPROVEMENTS TO SIGNAL AT 99TH STREET N.B. STATE AVENUE:PIPTH STREET TO GROVE STREET WIDENING.PLANING OF EXISTING ASPHALT PAVEMENT.OVERLAY BR'52e (64TH STREET N.E.): INTERSECTION OF 67TH AVENUE N.E. SIGNALI ZATION SR'S28 (64TH STREET N.B.): 53RD AVENUE N.E.TO 67TH AVENUE N.E. COHPLETION OF WIDENING,SIGNALIZATION 1 3 • 5 - - ----- ---- -- -.-- -.- - - - - - -- -. 16 16 16 16 16 1997·t 1999 I ----I I 1 I / --..··1 I / 1 I --....I I I / / I ----../ I I 1 I --...·1 / I I / ·..·..1 / 1 I I I I --....I 130 J I 340 I 4.70 I ....../ 32 / 1 I 32 I ...--·1 10 I 1 I 10 I P'EDSRAL I P.E.I 11 I I R/N /I I CONST.t 99 I I TOTAL J 110 I 1----..·1·--···1 I P, E. I I I R/N 1 I I CaNST.I I I TOTAL I I /.....--/....../ I P.E./ I I R/N I I I CaNST.J I TOTAL I I / /--...--1 I P.R.I I R/N 1 I CONST.J I TOTAL I I .....--I J P.E •t 1 R/N 1 1 CONST.I I TOTAL I 1------·1 I P.X.I I R/N 1 I CONST.I I TOTAL I CGPT 110 32 10 1252 <70 P'.A.PROJECT NO. 313 238 F.A.PROJECT NO. 4.00 1600 1".A.PROJECT NO. 9 F.A.PROJECT NO. 3 ~.A.PROJECT NO. I 14,12.0 0 13B 29 I P.A.PROJECT NO. I 1 1 •••••....•••••••••........••••••••••.....••••.••..••••••••....••••••....••• I 2000 2000 1 I 1 I····················. I 25 200 lHO 1565 1 1 / 1 I .........................•.......................•.....................•... 1 709 I FAUS BO?PUNDS 98TH? I ISTEA/FED 430 VIC?ISTEA 4.01 1 I····················. 1 <0 / CT 9 I STP 321 I 1 ••••••••......••••••••......•••••••.•....•••••••....••••••.....••••••.....• 1 13 I STP 10? u .30 1.0 .12 NODG ABDP DFGL2 !'5 STUDY FUTURE CORRIDORS 116TH STREET N.B.I STATE AVENUE TO TO INCLUDE TURN LANKS.WIDENING. AND PEDESTRIAN FACILITIES SR·520 (6.(TH STREET N.E.):67TH AVENUE TO 03RD AVENUE N.E. VERTICAL RE·ALIGNMENT AND WIDENING. BTORM DRAINAGE STATE AVENUE:100TH STREET N.E. TO 1D9TH STREET N.R. WIDEN TO PIVE'LANE SECTION. RE·ALIGNMENT.BRIDGE CONSTRUCTION. SIGNALIZATION.CHANNELIZATION. B9TH STRBET N.E.IMPROVEMENTS: 1-5 TO NEST SIDE OF THE RAILROAD TRACXB,INTERAGENCY AGREEMENT WITH SNOHOMISH COUNTY.VIC CITY OF MARYSVILLE:CORRIDOR ~OR HOV TRBATMENT,DETERMINE HOV TREATMENT FOR MARYSVILLE ROAD CHARACTERISTIC BTUDY:COMPUTER AND SOFTWARX FOR ROAD INVENTORY 6 7 9 • 10 11 -- -_.- -- - -_-- - - -- -- ---_- - - ---. ·--- - ---.- - - -.---- -- - - - -. ......._.- - ---.--_--- - --_-- - - - - - - - -. ·..- -- --._---- - -__..----- -- - -_- ·- -- ----- - - -.-..--- - -- -- -.---- - -- - - 16 16 16 16 16 16 F C P M C W C F S CAPP.OBLIGATION N L R A L 0 0 N T UATA,PLAN C A I PROJECT 10 JAR 0 TOTAL n A 1997·TOTAL LOCAL TIA FEDB:R.AL UTILITY 199.- T B #HORX DESCRIPTION R S [B:LENGTH G T I 199.(1995 1996 1999 FUNDS FONDS P'UNDS FUNDS CODES J J 1996 I ---------------------------------------------------------1--------------------------------------------------__I 1 I CITY OF MARYSVILLE 1994-1999 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY, CITY NO.I COUNTY NO.I KARYSVILLB 0745 31 HEARING DATEI ADOPTION DATE I RESOLUTION NO.I--------------------------------------------------------------------------------------------------------------------------------- RAP,PBDERAL OBLIGATION PLAN 199(·I 1997· 1996 I 1999 I ----I ----I 114 I I o I I BB6 I I 1000 1 I ······1 ....··1 I I 1 I I 1 I I I I 1 1 ••••••I ••••..1 1 I I 1 I I 1 I I I I I I I ······1 ······1 I I 1 I I I I 1 ······1 ······1 I I I 1 1 I I I P'.A.PROJECT NO. P.A.PROJECT NO. P.A.PROJECT NO. BO 625 <50 600 PRIVATE 720 •020 25 BO 1000 575 50 10 450 CAPP, UATA, 1997·TOTAL LOCAL TIA P'EDERAL UTILITY I 19!H 1995 1996 1999 PUNDS rUNDS rUNDS rUNDS CODgS I------------------------------------------------------I ----- lU 1524 1720 720 1000 I P.E. P'.A.PROJECT NO.I R/w I eONSI'. I TOTAL • . . • ....•••••••••••......••••••••.•1 ••••••• BO PI'I P.B • I R/" ICONSI'. I TOTAL 1 I · . . . ...I . !SO 57!5 I P.8. I R/. I CONST. I TOTAL I I I · . . . ...I . 450 I P.E. P.A.PROJECT NO.I RIM ICONSI'. I TOTAL · . . . ...I . CGPT I P.E. I R/. I CONST. I TOTAL 2 67TH AVENUE N.B.I BOUTH CITY LIMITS :I:DP'GL 1.70 U I TO GROVE STREET I IMPROVEMENTS TO VARIOUS 1 SECTIONS OP 67TH AVENUE N.E.TO INCLUDE I CITY 15? WIDENING OF SHOULDERS,INSTALLATION CURB,t eIP 93 GUTTER,AND SIDEWALK,STORM DRAINAGE AND J PAVING,I · . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . • • . . . . . . . . . . . . . • . . . . . ...............•.•....I 3 FOURTH STREET BY-PASS (TRIBES)I 5 01 .20 U I STATE AVENUE TO NBSI'CITY LIMITS I P'IRST STREBT INTBRCONNECT TO TULALIP I TRIBES TRIBES BY·PASS INCLUDES OVERLAY,I CITY RAILROAD CROSSING IMPROVEKENTS,I INTERSBCTION(S)IMPROVEMENTS AND r SIGNALIZATION AT STATE AVENUE I ·............................................................•..................I 4 rIRST STREET BY·PASSI STATE AVENU!TO 1 ABDP'.45 U I 47TH AVENUE N.E.,NEW CONSTRUCTION,I GRADING,STORM SEWER,CURB,GUTTER,I SIDEWALKS AND PAVING.I •.•••••••••••..........•.•.••••••••••••••••••....••••••••••.•.•..•••••••••••••••1 5 GROV!STREET I CEDAR AVENUE TO 2 ABDP .20 P I STATE AVENUE,WIDENING,CURB,t GUTTER AND SIDEWALKS I I 17 1 57TH AVENUE N.!.I GROVE STREET TO d DOPL ,73 P I B9TH STREET N.E.,WIDENING SHOULDERS,I TURN LANES.CURB,WALKWAYS,STORM I UNFUNDED DRAINAGE AND PAVING.POSSIBLE LID.t • • • • • • • . . . . . . • . . • • • • . • • • • • • • • • • • • • • • • • . • • . . . . . • • • • • • • • • . . . •...•••••••••••••••...1 17 17 17 17 PC P HC WC PS NL R AL 00 NT C A I PROJECT ID JAR D TOTAL D A T S It MaRX DESCRIPTION R S K E LENGTH G T I ---------------------------------------------------------I RAP,Il'BDERAL 1997·I 1999 I ----I 1 1 1 1 ......I 1 1 1 1 ·..•..1 1 1 1 1 ......I 1 1 1 1 ......I 1 1 1 1 ......I 1 1 1 1 1 1 ·....·1 1 1 1 1 ,50 .25 ,3B ABDF ABOP '"BOll' 2 2 2 88TH STREET:WEST CITY LIMITS TO A. POINT TO STATE AVENUE;WIDENING, RECONSTRUCTION, CURB, GUTTER,AND SIORNALX,SIGNAL MODIFICATION 84TH STREET N.E.:STATE AVENUE TO (7TH AVENUE N.E.;CURB,GUTTER,AND SIDEWALX, WIDENING,PAVING,AND DRAINAGE (lRDVE STREET I 67TH AVENUE N,E. TO 7181'AVENUE N.E. VERTICAL RE'ALIGNMENT,RECONSTRUCTION, WIDENING,CURB, GUTTER,SIDEWALKS, STORM DRAINAGE,MODIFICATIONS TO EXISTING CREEK CROSSING 10 11 12 17 17 17 17 17 17 II'C P Hew C Il'S CAPPo OBLIGATION N L R A L 0 0 N T I UAT1o.,PLAN C It.I PROJECT ID JAR D TOTAL D A I 1997·TOTAL LOCAL 1'IA P'EDERAL UTILITY I U94.I T 8 #;NORI(DESCRIPTION R a K E LENGTH 0 T I 1994,1995 1996 1999 PONDS i1UNDS FUNDS rUNDS CODES I I 1996 I ---------------------------------------------------------1--------------------------------------------------I -----1 1 17 6 4.7TH AVENUE:GROVE STREET TO BOTH 2 ABDP'.50 P I 50 550 600 120 foSo cos r I P.E.I STREBT N.B.;RECONSTRUCTION,I P'.A.PROJECT NO,I R/w I NIDKNING.CURB,GUTTER,AND 8IDEWALJCB.r UAT"BO'?I CONST.I STORM DRAINAGE,PAVING I I TOTAL I ......................................................··························1···························I I 7 EIGHTH STREET:CEDAR AVENUE TO STATE :2 ABOP'.20 P I 160 160 160 I P.E.I AVENUE;WIDENING.CURB,GUTTER,AND I P'.A.PROJECT NO.J R/w I SIDEWALKS.STORM DRAINAGE:.PAVING.I I CONST.I RAILROAD CROSSING IMPROVEMENTS J I TOTAL I ..•..•..•..•..• •..•••..• ••1 •I 1 B GROVE STREET:ASH AVENUE TO 2 ABDF .20 P I 150 150 150 CGPT I P.E.I CEDAR AVENUE,RECONSTRUCTION,I F.A.PROJECT NO.I R/W I WIDENING,DRAINAGE,CURB, GUTTER,I I CONST.I AND SIDEWALKS I I TOTAL I ................................................................................1 I g 51ST AVENUE N.B.:GROVE STREET TO (ABDF .50 I 50 500 550 550 P.E.I 80TH STREET N.E.I F.A.PROJECT NO.R/W I RECONSTRUCTION,WIDENING I CONST.I I TOTAL I ................................................................................1 1 U I 200 100 100 (00 20t 80'TIB P.E.I I P.A.PROJECT NO.R!W I I TIB 80t CONST.J I LOCAL 20"TOTAL I 1 I P I 310 310 310 310 COPT P .E.I 1 R/N 1 I P.A.PROJECT NO.CONST.t I TOTAL I 1 1 1 1 ................................................................................1 1 U I 420 420 (20 CGPT P.E.I I F.A.PROJECT NO.R!N I I CONST.I I TOTAL I RAP,P'B:OERAL P'C P Me we 16 NL R.AL 00 NT C A I PROJECT 10 JAR 0 TOTAL 0 A T 6 It WORK DESCRIPTION R B It:K LENQTH o T I---------------------------------------------------------I -. 1I'.A.PROJBCT NO. 337 278 100so CAPP.OBLIGATION OATA.PLAN 1997·TOTAL LOCAL TIA FEDERAL UTILITY I 1994·I 1997. 1994 1995 1996 1999 IPUNDS rUNDS FUNDS FUHDS COORS I I 1996 I 1999 I ------------------------------------------------------1-----1 ----I ----I 160 COPT I P.R,I I I V.A.PROJECT NO.I R/w I I I 1 CONST.1 1 I I TOTAL I I I ..--------.--..-------..-.----------------,.-- 1 -····-1 ·-····1 1 P.'.1 1 1 1 R/W 1 I 1 1 CONST.1 1 1 I TOTAL I I I "······1 ·----·1 ------I 1 1 1 1 1 --..---1 ·---··1 ·----·1 1 1 1 I 1 1 1 1 1···----1 ·--·-·1 ··----1 1 1 1 1 1 ------·1------1 ·----·1 1 1 1 1 -------..----------.--1 -------1 --···-1 ----··1 1 1 1 I 1 1 I I ------.--------------.,.------1 ·--···1 --·---1 1 I 1 1 1 I 1 1 1 I 1 I 1 1 1 I 1 1 ------------------•••--.--••----•••••--•••••••---------------••••••••••••••••••- 1 15 BRACH AVBNUB:FOURTH STREET TO GROVE STREET .62 1 ---.------..•-..------------------------.--'-"- -••••..--··1 16 BRACH AVENUR I GROVS STREET TO CEDAR AVBNUE .39 I (INCLUDING SHORT STRRRT)r -----------------.-.-.-••••--••-•••-••-•••••••••••-------------.--••••-•••••••--1 --.-----.-••-••--••••-••••-----••••--•••-.- 17 41TH AVENUE N.E.:SIXTH STRRRT TO GROVE STRZET .53 I 599 ----------•••- -•••---.----.- -••••-. -. -.- - ---- - - - - - - - - ---••••------ - -••-••-•••---1 •••••-••-"---.- - - - -••--- - - --- 18 ((TH AVKNUB N.R.:QROVE STREET TO 76TH STREBT N.B..23 I 170 --.---------------..-.-----.--.-------.--I .-.----------------.------.---..--- -..---- 19 52ND STRBBT N.B.I SUNNYSIDE BOULEVARD I DBVELOPERS TO RECONSTRUCT MAJOR PORTION TO 75TH AVENUB N.E.I AS DEVELOPER BXTBNSIONS OCCUR (THREB IN 1993) -----.----.--..- -.......----'--.- - --- --- - - - - ---.-------.-•••••••••••---.----••••1 •--•••---••--.--...--••-.-••- - - - - ---- - -.---• - - --.- 20 136TH STREBT N.B.:STATB AVENUE TO BAST CITY LIMITS I NAVY TRAFFIC MITIGATION FUNDS TO RBCONSTRUCT. I SNOHOMISH COUNTY IS LBAD AGENCY.AS SUCH 6 COUNTY I WILL PRBPARE PLANS,SPECIFICATIONS AND ENGINEERING, I ACQUIRE RIQHT·OF·NAY IN THE CITY'S NAME 17 13 lfIFTH STRBBT:DRLTA AVENUS TO CKDAR 4.Bort .20 P I AVENUE,RAILROAD CROSBING IMPROVRMBNTS I PAVIWO.DRAINAGB,CURBS, GUTTERS,AND I SIDEWALkS I • - ._••-.- - • - - - - - - - - - - - - - • - - - - • - • -••••--••-••••••••-•••••--••- - - - - - - -•••-•••••••••1 l'SUNNYSIDB BOULBVARD:47TH AVENUB TO I BOUTH CITY LIMITS;OVERLAY AND SHOULDBRS I 17 17 17 17 17 17 17 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM CODE EXPLANATION ·. , C N L PUNCTIONAL C A CLASBIFICATION T S THE FBDBRAL FUNCTIONAL CLASSIPICATIONS SHOWN ON THB O"ICIAL 'UNCTIONAL CLASSIPICAION NAPS PREPARED BY WSDOT. ....--. .......................................................................................................................................................................................... P R I ~ PRIORITY NUMBER LOCAL AGENCY PROJBCT IDENTIPYING NUMBERS H C A L NAJOR CLASS J A 0'1I0RIC R S 1.NEil CONSTRUCTION DN NBW ALIGNH!NT 2.NAJDR WIDENING (ADDITIONAL LANES) 3.HINOR WIDENING (INCRBASE LANE IIIDTH,ADD SHOULDERS) 4.REHABILITATION/RECONSTRUCTION I.RESURFACING I.TRAP'IC CONTROL 7.CAPITAL PURCHASES 8.NON CAPITAL IHPROVEH!NTS I.NON HOTOR VEHICLE USB 10.TRANSIT CAPITAL PROJBCT 11.TRANSIT OPERATING PROJECT 12.TRANSIT PLANNING PROJECT ·. " C o 0 WORIC CODES R D ~B A.GRADING B.DRAINING C.LIGHT BITUHINOUS SURFACE D. A.C.OR P.C.C.PAVEHINT B.SEALCOAT ,.CURBS AND GUTTERS G.SID!IIAL~S H.CHANNELIZATION I,SIGNALIZATION J.LIGHTING ~.SIGN.ING L.BRIDGl!: H.LANDSCAPING N.PATHS AND TRAILS O.BIICBIIAYS P.TRANSIT PACILITY Q.CAR/VAN POOL PROQRAH R.HIGH OCCUPANCY VEHICLB LANES S.SURVEI~LANCB CONTROL AND DRIVER INFORMATION r.'ERRY FACILITY U,PROJECT STUDIES rOTAL ~BNGTH ....................-. LENGTH (IN HILES)OF PROJECT TO THB NEAREST HUNDREDTH ·-. P S N T rUNDING D A STATUS G T F.PUNDED P.PROPOSED 'OR PUNDING U.'UNDING IS UN~OIlN ·-. 1194·1ST,2ND,3RD,ESTIHATED PROJBCT COSTS (IN THOUSANOS OP DOLLARS) 1119 4,I,&ITH YEARS PLANNED POR EXPENDITU.RE EACH YBAR . .... .--. TOTAL TOTAL PUNDS PUNDS TOTAL PROJECT COST .................................................................................................................. DO~LAR AMOUNT (IN THOUSANDS OF DOLLARS)PLANNBD TO BB PROGRAMMED. RAP, CAPP,~ONDINa BY UATA,SOURCE rIA PUNDS P.CAPP R.RAP T,TIA U.OATA UTILIT CODES ............................................................................................................. UTI~ITIEB TO BE RELOCATBD OR ARE IHPACTEO SY PROPOSED CONSTRUCTION or THE PROJECT. C.CABLB (TV) G.GAS P.PONER T.TELEPHONB S.SBI1!RS (OTHER THAN AGENCY OIlNED) N.IIATER O.OTHER .................... rA'rED PROJECT •ASSIaNBD AT rUND APPROVAL STAQE BY LOCAL PRDaRAHS ...... PBDBRA OBLIGATION PLAN (FUNDINa) P.B.,THE AMOUNT (IN THOUSANDS OP DOLLARS)OF TH;PROPOSED rBDERAL PUNDS TO BB OBLIaATED.DOES NOT INCLUDE ANY PHASES rOR IINICH FEDERAL rUNDS HAVB ALREADY BEEN AUTHORIZBD. a/N'(SAHB AS P.E.) CONST.,(SAME AS P.E.) .,