RESOLUTION No.A:;.3)
A RESOLUTION OF THE CITY OF MARYSVILLE ADOPTING A
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM (1994-1999)
INCLUDING AN ARTERIAL STREET CONSTRUCTION PROGRAM IN
ACCORDANCE WITH THE REGULATIONS OF THE URBAN ARTERIAL
BOARD.
WHEREAS,the City Council of the City of Marysville,Washington
pursuant to RCW 35.77.010,held a public hearing on July 12,1993 for
the purpose of revising and extending its Comprehensive Six-Year
Transportation Program and for the purpose of adopting an Arterial
Street Construction Program in accordance with the regulations of the
Urban Arterial Board;and
WHEREAS,the City Council has reviewed the current status of City
streets and has considered the testimony and exhibits presented at the
public hearing,and finds that the programs presented by the Public
Works Department are in the long-range best interests of the City;
NOW,THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF·THE CITY OF MARYSVILLE,
WASHINGTON AS FOLLOWS:
1.The Comprehensive Six-Year Transportation Improvement
Program (1994-1999)presented to the City Council,copies of which are
on file and open to public inspection at the office of the City Clerk,
is hereby approved and adopted in its entirety.
2.The Six-Year Program for Arterial Street Construction
utilizing urban arterial trust funds in accordance with the
regulations of the Urban Arterial Board,as presented to the City
Council,copies of which are on file and open to public inspection at
the office of the City Clerk,is hereby approved and adopted in its
entirety.
3.The City Clerk is hereby directed to file copies of said
Programs with the Secretary of Transportation and the Urban Arterial
Board.
PASSED by the City Council and APPROVED by the Mayor this 12th
day of July,1993.
CITY OF MARYSVILLE
RESOLUTION - 1
it
.
•
ATTEST:
By~l~ITYCLERK
Approved as to form:
BY~.W~
•CITY ATTORNEY
RESOLUTION - 2
CITY OF MARYSVILLE
1994-1999 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
CITY,
CITY NO.,
COUNTY NO.:
MARYSVILLE
0745
31
HEARING DATE,
ADOPTION DATE:
RESOLUTION NO. ,
JULY 12,1993
JULY 12,1993
1633-------------------------------------------------------------------------------------------------------------------------------
Fe P Me we P'S
NL R AL 00 NT
C A I PROJBCT ID JAR D TOTAL D A
T 8 n WORX DESCRIPTION R S J:II:LENGTH Q T I
---------------------------------------------------------I
·-- -- -- - - - -- --- -- -- - - - -- - - - - - - - -
·--.- -- - - - -.-- -- -.-- - - - - - -- -
·---..----- --.-- - - - - ---- - - - - -
COPT312100238
P.A.PROJECT NO.
................................/··..···1······/..····1
P.A.PROJECT NO.
J P.E.I 20 I I
/ R/W 1 1 /
I CONST. I 200 I I
I TOTAL I 220 I I
/1 //
///1
///1
................................,···..··1······1 ....../
145 590 Ip.E.1201 I
P.A.PROJECT NO.I R/w I I I
I CONST. I 560 I I
I TOTAL I 580 I I
................................/..·····1··..··/..····1
75 50 CGPTN J P.E.I I I
if.A.PROJECT NO.I R/N I I I
I CONST. I 125 I I
I TOTAL J 125 I I
................................////
30 320 COPT I P.E.I I I
if.A.PROJECT NO.I R/W I t I
I CONST. I I J
I TOTAL I I
725
125
350
78
LOCAL 180
NAVY 7061
FAUS 80.5
B MIT 140
LOCAL
STP 590?
TIB 300
700
125
350
RAP.FEDERAL
C~PP.OBLIGATION
UAT",PLAN
1997 -TOTAL LOCAL rIA FEDERAL UTILITY J I 1994 -r 1997-
1994 1995 1996 1999 FUNDS PUNDS FUNDS FUNDS CODES I I 1996 I 1999 t
----------------------------------------------------1 -----/----I ----I
501 1039 1538 125 243 caPT I P.E.I 3 t I
/ R/W 1 0 /1
I CONST.I 240 I I
I TOTAL I 243 I I
1 / / 1
//1 /
/
1
I BTP 162.5
I HBB 125
I 268 213
I CT 20
1 .
I 3S 615 650
/
I BTP 2201
I CT 20
I TIB 20o?
1
/
/.
/
/
I TIB 94?
I UATA 941
I·······..·········.
/
/
I HBB 50
I LOCAL 75
I···..·..···········.
/
/
I GKA 50
/
p
p
u
u
p
.38
.38
.67
.80
.10I
HI
DP'GL
AIl.a
ABOF
•
6
STATE AVENUE:l09TH STREET N.B.TO
13GTH STREET N.E.;ADD WALKWAYS,
SHOULDERS,TURN LANES INCLUDING A
TWO-WAY LEFT TURN ON STATE AVENUE,
ONE SIGNAL AT 136TH AND IMPROVEMENTS
TO THE SIGNAL AT 116TH STREET N.E.
STATE AVENUE:eeTH STRRET N.E.TO
94TH PLACE N.E.;WIDEN EXISTING
ROADWAY SECTION TO FIVE LANES.
INSTALLATION OF TRAFFIC SIGNAL AT THE
INTERSECTION OP 92ND STREET N.B.AND
STATE AVENUE AND IMPROVEMENTS TO
SIGNAL AT 99TH STREET N.B.
STATE AVENUE:PIPTH STREET TO
GROVE STREET
WIDENING.PLANING OF EXISTING
ASPHALT PAVEMENT.OVERLAY
BR'52e (64TH STREET N.E.):
INTERSECTION OF 67TH AVENUE N.E.
SIGNALI ZATION
SR'S28 (64TH STREET N.B.):
53RD AVENUE N.E.TO 67TH AVENUE N.E.
COHPLETION OF WIDENING,SIGNALIZATION
1
3
•
5
- - ----- ---- -- -.-- -.- - - - - - -- -.
16
16
16
16
16
1997·t
1999 I
----I
I
1
I
/
--..··1
I
/
1
I
--....I
I
I
/
/
I
----../
I
I
1
I
--...·1
/
I
I
/
·..·..1
/
1
I
I
I
I
--....I
130 J
I
340 I
4.70 I
....../
32 /
1
I
32 I
...--·1
10 I
1
I
10 I
P'EDSRAL
I P.E.I 11 I
I R/N /I
I CONST.t 99 I
I TOTAL J 110 I
1----..·1·--···1
I P, E. I I
I R/N 1 I
I CaNST.I I
I TOTAL I I
/.....--/....../
I P.E./ I
I R/N I I
I CaNST.J
I TOTAL I
I /
/--...--1
I P.R.I
I R/N 1
I CONST.J
I TOTAL I
I .....--I
J P.E •t
1 R/N 1
1 CONST.I
I TOTAL I
1------·1
I P.X.I
I R/N 1
I CONST.I
I TOTAL I
CGPT
110
32
10
1252
<70
P'.A.PROJECT NO.
313
238
F.A.PROJECT NO.
4.00 1600
1".A.PROJECT NO.
9
F.A.PROJECT NO.
3
~.A.PROJECT NO.
I 14,12.0 0 13B 29
I P.A.PROJECT NO.
I
1
1 •••••....•••••••••........••••••••••.....••••.••..••••••••....••••••....•••
I 2000 2000
1
I
1
I····················.
I 25 200 lHO 1565
1
1
/
1
I .........................•.......................•.....................•...
1 709
I FAUS BO?PUNDS 98TH?
I ISTEA/FED 430 VIC?ISTEA 4.01
1
I····················.
1 <0
/ CT 9
I STP 321
I
1 ••••••••......••••••••......•••••••.•....•••••••....••••••.....••••••.....•
1 13
I STP 10?
u
.30
1.0
.12
NODG
ABDP
DFGL2
!'5
STUDY
FUTURE
CORRIDORS
116TH STREET N.B.I STATE AVENUE TO
TO INCLUDE TURN LANKS.WIDENING.
AND PEDESTRIAN FACILITIES
SR·520 (6.(TH STREET N.E.):67TH
AVENUE TO 03RD AVENUE N.E.
VERTICAL RE·ALIGNMENT AND WIDENING.
BTORM DRAINAGE
STATE AVENUE:100TH STREET N.E.
TO 1D9TH STREET N.R.
WIDEN TO PIVE'LANE SECTION.
RE·ALIGNMENT.BRIDGE CONSTRUCTION.
SIGNALIZATION.CHANNELIZATION.
B9TH STRBET N.E.IMPROVEMENTS:
1-5 TO NEST SIDE OF THE RAILROAD
TRACXB,INTERAGENCY AGREEMENT WITH
SNOHOMISH COUNTY.VIC
CITY OF MARYSVILLE:CORRIDOR
~OR HOV TRBATMENT,DETERMINE
HOV TREATMENT FOR MARYSVILLE
ROAD CHARACTERISTIC BTUDY:COMPUTER
AND SOFTWARX FOR ROAD INVENTORY
6
7
9
•
10
11
-- -_.- -- - -_-- - - -- -- ---_- - - ---.
·--- - ---.- - - -.---- -- - - - -.
......._.- - ---.--_--- - --_-- - - - - - - - -.
·..- -- --._---- - -__..----- -- - -_-
·- -- ----- - - -.-..--- - -- -- -.---- - -- - -
16
16
16
16
16
16
F C P M C W C F S CAPP.OBLIGATION
N L R A L 0 0 N T UATA,PLAN
C A I PROJECT 10 JAR 0 TOTAL n A 1997·TOTAL LOCAL TIA FEDB:R.AL UTILITY 199.-
T B #HORX DESCRIPTION R S [B:LENGTH G T I 199.(1995 1996 1999 FUNDS FONDS P'UNDS FUNDS CODES J J 1996 I
---------------------------------------------------------1--------------------------------------------------__I 1 I
CITY OF MARYSVILLE
1994-1999 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
CITY,
CITY NO.I
COUNTY NO.I
KARYSVILLB
0745
31
HEARING DATEI
ADOPTION DATE I
RESOLUTION NO.I---------------------------------------------------------------------------------------------------------------------------------
RAP,PBDERAL
OBLIGATION
PLAN
199(·I 1997·
1996 I 1999 I
----I ----I
114 I I
o I I
BB6 I I
1000 1 I
······1 ....··1
I I
1 I
I 1
I I
I I
1 1
••••••I ••••..1
1 I
I 1
I I
1 I
I I
I I
I I
······1 ······1
I I
1 I
I I
I 1
······1 ······1
I I
I 1
1 I
I I
P'.A.PROJECT NO.
P.A.PROJECT NO.
P.A.PROJECT NO.
BO
625
<50
600
PRIVATE 720
•020
25
BO
1000
575
50
10
450
CAPP,
UATA,
1997·TOTAL LOCAL TIA P'EDERAL UTILITY I
19!H 1995 1996 1999 PUNDS rUNDS rUNDS rUNDS CODgS I------------------------------------------------------I -----
lU 1524 1720 720 1000 I P.E.
P'.A.PROJECT NO.I R/w
I eONSI'.
I TOTAL
• . . • ....•••••••••••......••••••••.•1 •••••••
BO PI'I P.B •
I R/"
ICONSI'.
I TOTAL
1
I
· . . . ...I .
!SO 57!5 I P.8.
I R/.
I CONST.
I TOTAL
I
I
I
· . . . ...I .
450 I P.E.
P.A.PROJECT NO.I RIM
ICONSI'.
I TOTAL
· . . . ...I .
CGPT I P.E.
I R/.
I CONST.
I TOTAL
2 67TH AVENUE N.B.I BOUTH CITY LIMITS :I:DP'GL 1.70 U I
TO GROVE STREET I IMPROVEMENTS TO VARIOUS 1
SECTIONS OP 67TH AVENUE N.E.TO INCLUDE I CITY 15?
WIDENING OF SHOULDERS,INSTALLATION CURB,t eIP 93
GUTTER,AND SIDEWALK,STORM DRAINAGE AND J
PAVING,I
· . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . • • . . . . . . . . . . . . . • . . . . . ...............•.•....I
3 FOURTH STREET BY-PASS (TRIBES)I 5 01 .20 U I
STATE AVENUE TO NBSI'CITY LIMITS I
P'IRST STREBT INTBRCONNECT TO TULALIP I TRIBES
TRIBES BY·PASS INCLUDES OVERLAY,I CITY
RAILROAD CROSSING IMPROVEKENTS,I
INTERSBCTION(S)IMPROVEMENTS AND r
SIGNALIZATION AT STATE AVENUE I
·............................................................•..................I
4 rIRST STREET BY·PASSI STATE AVENU!TO 1 ABDP'.45 U I
47TH AVENUE N.E.,NEW CONSTRUCTION,I
GRADING,STORM SEWER,CURB,GUTTER,I
SIDEWALKS AND PAVING.I
•.•••••••••••..........•.•.••••••••••••••••••....••••••••••.•.•..•••••••••••••••1
5 GROV!STREET I CEDAR AVENUE TO 2 ABDP .20 P I
STATE AVENUE,WIDENING,CURB,t
GUTTER AND SIDEWALKS I
I
17 1 57TH AVENUE N.!.I GROVE STREET TO d DOPL ,73 P I
B9TH STREET N.E.,WIDENING SHOULDERS,I
TURN LANES.CURB,WALKWAYS,STORM I UNFUNDED
DRAINAGE AND PAVING.POSSIBLE LID.t
• • • • • • • . . . . . . • . . • • • • . • • • • • • • • • • • • • • • • • . • • . . . . . • • • • • • • • • . . . •...•••••••••••••••...1
17
17
17
17
PC P HC WC PS
NL R AL 00 NT
C A I PROJECT ID JAR D TOTAL D A
T S It MaRX DESCRIPTION R S K E LENGTH G T I
---------------------------------------------------------I
RAP,Il'BDERAL
1997·I
1999 I
----I
1
1
1
1
......I
1
1
1
1
·..•..1
1
1
1
1
......I
1
1
1
1
......I
1
1
1
1
......I
1
1
1
1
1
1
·....·1
1
1
1
1
,50
.25
,3B
ABDF
ABOP
'"BOll'
2
2
2
88TH STREET:WEST CITY LIMITS TO A.
POINT TO STATE AVENUE;WIDENING,
RECONSTRUCTION, CURB, GUTTER,AND
SIORNALX,SIGNAL MODIFICATION
84TH STREET N.E.:STATE AVENUE TO
(7TH AVENUE N.E.;CURB,GUTTER,AND
SIDEWALX, WIDENING,PAVING,AND
DRAINAGE
(lRDVE STREET I 67TH AVENUE N,E.
TO 7181'AVENUE N.E.
VERTICAL RE'ALIGNMENT,RECONSTRUCTION,
WIDENING,CURB, GUTTER,SIDEWALKS,
STORM DRAINAGE,MODIFICATIONS TO
EXISTING CREEK CROSSING
10
11
12
17
17
17
17
17
17
II'C P Hew C Il'S CAPPo OBLIGATION
N L R A L 0 0 N T I UAT1o.,PLAN
C It.I PROJECT ID JAR D TOTAL D A I 1997·TOTAL LOCAL 1'IA P'EDERAL UTILITY I U94.I
T 8 #;NORI(DESCRIPTION R a K E LENGTH 0 T I 1994,1995 1996 1999 PONDS i1UNDS FUNDS rUNDS CODES I I 1996 I
---------------------------------------------------------1--------------------------------------------------I -----1 1
17 6 4.7TH AVENUE:GROVE STREET TO BOTH 2 ABDP'.50 P I 50 550 600 120 foSo cos r I P.E.I
STREBT N.B.;RECONSTRUCTION,I P'.A.PROJECT NO,I R/w I
NIDKNING.CURB,GUTTER,AND 8IDEWALJCB.r UAT"BO'?I CONST.I
STORM DRAINAGE,PAVING I I TOTAL I
......................................................··························1···························I I
7 EIGHTH STREET:CEDAR AVENUE TO STATE :2 ABOP'.20 P I 160 160 160 I P.E.I
AVENUE;WIDENING.CURB,GUTTER,AND I P'.A.PROJECT NO.J R/w I
SIDEWALKS.STORM DRAINAGE:.PAVING.I I CONST.I
RAILROAD CROSSING IMPROVEMENTS J I TOTAL I
..•..•..•..•..• •..•••..• ••1 •I 1
B GROVE STREET:ASH AVENUE TO 2 ABDF .20 P I 150 150 150 CGPT I P.E.I
CEDAR AVENUE,RECONSTRUCTION,I F.A.PROJECT NO.I R/W I
WIDENING,DRAINAGE,CURB, GUTTER,I I CONST.I
AND SIDEWALKS I I TOTAL I
................................................................................1 I
g 51ST AVENUE N.B.:GROVE STREET TO (ABDF .50 I 50 500 550 550 P.E.I
80TH STREET N.E.I F.A.PROJECT NO.R/W I
RECONSTRUCTION,WIDENING I CONST.I
I TOTAL I
................................................................................1 1
U I 200 100 100 (00 20t 80'TIB P.E.I
I P.A.PROJECT NO.R!W I
I TIB 80t CONST.J
I LOCAL 20"TOTAL I
1 I
P I 310 310 310 310 COPT P .E.I
1 R/N 1
I P.A.PROJECT NO.CONST.t
I TOTAL I
1 1
1 1
................................................................................1 1
U I 420 420 (20 CGPT P.E.I
I F.A.PROJECT NO.R!N I
I CONST.I
I TOTAL I
RAP,P'B:OERAL
P'C P Me we 16
NL R.AL 00 NT
C A I PROJECT 10 JAR 0 TOTAL 0 A
T 6 It WORK DESCRIPTION R B It:K LENQTH o T I---------------------------------------------------------I
-.
1I'.A.PROJBCT NO.
337
278
100so
CAPP.OBLIGATION
OATA.PLAN
1997·TOTAL LOCAL TIA FEDERAL UTILITY I 1994·I 1997.
1994 1995 1996 1999 IPUNDS rUNDS FUNDS FUHDS COORS I I 1996 I 1999 I
------------------------------------------------------1-----1 ----I ----I
160 COPT I P.R,I I I
V.A.PROJECT NO.I R/w I I I
1 CONST.1 1 I
I TOTAL I I I
..--------.--..-------..-.----------------,.-- 1 -····-1 ·-····1
1 P.'.1 1 1
1 R/W 1 I 1
1 CONST.1 1 1
I TOTAL I I I
"······1 ·----·1 ------I
1 1 1 1
1 --..---1 ·---··1 ·----·1
1 1 1 I
1 1 1 1
1···----1 ·--·-·1 ··----1
1 1 1 1
1 ------·1------1 ·----·1
1 1 1 1
-------..----------.--1 -------1 --···-1 ----··1
1 1 1 I
1 1 I I
------.--------------.,.------1 ·--···1 --·---1
1 I 1 1
1 I 1 1
1 I 1 I
1 1 1 I
1
1
------------------•••--.--••----•••••--•••••••---------------••••••••••••••••••- 1
15 BRACH AVBNUB:FOURTH STREET TO GROVE STREET .62 1
---.------..•-..------------------------.--'-"- -••••..--··1
16 BRACH AVENUR I GROVS STREET TO CEDAR AVBNUE .39 I
(INCLUDING SHORT STRRRT)r
-----------------.-.-.-••••--••-•••-••-•••••••••••-------------.--••••-•••••••--1 --.-----.-••-••--••••-••••-----••••--•••-.-
17 41TH AVENUE N.E.:SIXTH STRRRT TO GROVE STRZET .53 I 599
----------•••- -•••---.----.- -••••-. -. -.- - ---- - - - - - - - - ---••••------ - -••-••-•••---1 •••••-••-"---.- - - - -••--- - - ---
18 ((TH AVKNUB N.R.:QROVE STREET TO 76TH STREBT N.B..23 I 170
--.---------------..-.-----.--.-------.--I .-.----------------.------.---..--- -..----
19 52ND STRBBT N.B.I SUNNYSIDE BOULEVARD I DBVELOPERS TO RECONSTRUCT MAJOR PORTION
TO 75TH AVENUB N.E.I AS DEVELOPER BXTBNSIONS OCCUR (THREB IN 1993)
-----.----.--..- -.......----'--.- - --- --- - - - - ---.-------.-•••••••••••---.----••••1 •--•••---••--.--...--••-.-••- - - - - ---- - -.---• - - --.-
20 136TH STREBT N.B.:STATB AVENUE TO BAST CITY LIMITS I NAVY TRAFFIC MITIGATION FUNDS TO RBCONSTRUCT.
I SNOHOMISH COUNTY IS LBAD AGENCY.AS SUCH 6 COUNTY
I WILL PRBPARE PLANS,SPECIFICATIONS AND ENGINEERING,
I ACQUIRE RIQHT·OF·NAY IN THE CITY'S NAME
17 13 lfIFTH STRBBT:DRLTA AVENUS TO CKDAR 4.Bort .20 P I
AVENUE,RAILROAD CROSBING IMPROVRMBNTS I
PAVIWO.DRAINAGB,CURBS, GUTTERS,AND I
SIDEWALkS I
• - ._••-.- - • - - - - - - - - - - - - - • - - - - • - • -••••--••-••••••••-•••••--••- - - - - - - -•••-•••••••••1
l'SUNNYSIDB BOULBVARD:47TH AVENUB TO I
BOUTH CITY LIMITS;OVERLAY AND SHOULDBRS I
17
17
17
17
17
17
17
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
CODE EXPLANATION
·.
, C
N L PUNCTIONAL
C A CLASBIFICATION
T S
THE FBDBRAL FUNCTIONAL CLASSIPICATIONS SHOWN ON THB
O"ICIAL 'UNCTIONAL CLASSIPICAION NAPS PREPARED BY WSDOT.
....--.
..........................................................................................................................................................................................
P
R
I
~
PRIORITY
NUMBER
LOCAL AGENCY PROJBCT IDENTIPYING NUMBERS
H C
A L NAJOR CLASS
J A 0'1I0RIC
R S
1.NEil CONSTRUCTION DN NBW ALIGNH!NT
2.NAJDR WIDENING (ADDITIONAL LANES)
3.HINOR WIDENING (INCRBASE LANE
IIIDTH,ADD SHOULDERS)
4.REHABILITATION/RECONSTRUCTION
I.RESURFACING
I.TRAP'IC CONTROL
7.CAPITAL PURCHASES
8.NON CAPITAL IHPROVEH!NTS
I.NON HOTOR VEHICLE USB
10.TRANSIT CAPITAL PROJBCT
11.TRANSIT OPERATING PROJECT
12.TRANSIT PLANNING PROJECT
·.
" C
o 0 WORIC CODES
R D
~B
A.GRADING
B.DRAINING
C.LIGHT BITUHINOUS SURFACE
D. A.C.OR P.C.C.PAVEHINT
B.SEALCOAT
,.CURBS AND GUTTERS
G.SID!IIAL~S
H.CHANNELIZATION
I,SIGNALIZATION
J.LIGHTING
~.SIGN.ING
L.BRIDGl!:
H.LANDSCAPING
N.PATHS AND TRAILS
O.BIICBIIAYS
P.TRANSIT PACILITY
Q.CAR/VAN POOL PROQRAH
R.HIGH OCCUPANCY VEHICLB LANES
S.SURVEI~LANCB CONTROL AND
DRIVER INFORMATION
r.'ERRY FACILITY
U,PROJECT STUDIES
rOTAL
~BNGTH
....................-.
LENGTH (IN HILES)OF PROJECT TO THB NEAREST HUNDREDTH
·-.
P S
N T rUNDING
D A STATUS
G T
F.PUNDED
P.PROPOSED 'OR PUNDING
U.'UNDING IS UN~OIlN
·-.
1194·1ST,2ND,3RD,ESTIHATED PROJBCT COSTS (IN THOUSANOS OP DOLLARS)
1119 4,I,&ITH YEARS PLANNED POR EXPENDITU.RE EACH YBAR .
.... .--.
TOTAL TOTAL PUNDS
PUNDS
TOTAL PROJECT COST
..................................................................................................................
DO~LAR AMOUNT (IN THOUSANDS OF DOLLARS)PLANNBD TO BB PROGRAMMED.
RAP,
CAPP,~ONDINa BY
UATA,SOURCE
rIA
PUNDS
P.CAPP
R.RAP
T,TIA
U.OATA
UTILIT
CODES
.............................................................................................................
UTI~ITIEB TO BE RELOCATBD OR ARE IHPACTEO
SY PROPOSED CONSTRUCTION or THE PROJECT.
C.CABLB (TV)
G.GAS
P.PONER
T.TELEPHONB
S.SBI1!RS (OTHER THAN AGENCY OIlNED)
N.IIATER
O.OTHER
....................
rA'rED PROJECT •ASSIaNBD AT rUND APPROVAL STAQE BY LOCAL PRDaRAHS
......
PBDBRA
OBLIGATION
PLAN
(FUNDINa)
P.B.,THE AMOUNT (IN THOUSANDS OP DOLLARS)OF TH;PROPOSED
rBDERAL PUNDS TO BB OBLIaATED.DOES NOT INCLUDE ANY PHASES
rOR IINICH FEDERAL rUNDS HAVB ALREADY BEEN AUTHORIZBD.
a/N'(SAHB AS P.E.)
CONST.,(SAME AS P.E.)
.,