CITY OF MARYSVILLE
Marysville.Washington
RESOLUTION NO.2.0q 9
A RESOLUTION OF THE CITY OF MARYSVILLE ADOPTING A SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2004-2009),INCLUDING AN
ARTERIAL STREET CONSTRUCTION PROGRAM IN ACCORDANCE WITH
THE REGULATIONS OF THE URBAN ARTERIAL BOARD.
WHEREAS,the City Council of the City of Marysville,
Washington,pursuant to RCW 35.77.010,held a public hearing on
June 23,2003 for the purpose of revising and extending its
Comprehensive Six-Year Transportation Program and for the purpose
of adopting an Arterial Street Construction Program in accordance
with the regulations of the Urban Arterial Board;and
WHEREAS,the City Council has reviewed the current status of
City streets and has considered the testimony and exhibits
presented at the public hearing,and finds that the programs
presented by the Public Works Department are in the long-range
best interests of the City;NOW,THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
MARYSVILLE,WASHINGTON AS FOLLOWS:
1.The Comprehensive Six-Year Transportation Improvement
Program (2004-2009)presented to the City Council,copies of
which are on file and open to public inspection at the office of
the City Clerk,is hereby approved and adopted in its entirety.
2.The Six-Year Program for Arterial Street Construction
utilizing urban arterial trust funds in accordance with the
regulations of the Urban Arterial Board,as presented to the City
Council,copies of which are on file and open to public
inspection at the office of the city Clerk,is hereby approved
and adopted in its entirety.
3.The City Clerk is hereby directed to file copies of
said Programs with the Secretary of Transportation and the Urban
Arterial Board.
/
ASSED by
~3/1 day of
the City Council and APPROVED by the Mayor
~'2003.
this
RESOLUTION -1
Iwpf/mv/res.6yrTIP
yor
,t
ATTEST:
BY~G¢RYBECR;CitYCkrk
Approved as to form:
By W~"'·WpQG~K.WEED,City Attorney
RESOLUTION - 2
Iwpf/mv/res.6yrTIP
1 _
,,
2004-2009 SIX YEAR TRANSPORTATION PLAN
PROGRAM NARRATIVE
ITEM NO.1 67th AVENUE NE: SOUTH CITY LIMITS TO SR 528
The proposed project will construct 8-foot shoulders on 6ih Avenue in areas lacking curb,
gutter, and sidewalk.
ITEM NO.2 GROVE STREET / ALDER AVENUE SIGNAL
The project will signalize the intersection with pedestrian crossing. This signal may include
interconnection with the signal controller of the Grove Street / State Avenue signal.
ITEM NO.3 SR 5281 47TH AVENUENE INTERSECTION
Reconstruction of intersection to provide additional east-west through lanes and longer turn-
pockets. Work involves installing new traffic signal,increasing turn radii on all four corners,
and widening SR528 east of 47th Avenue.
ITEM NO.4 47TH AVENUE NE 1 3RD STREET INTERSECTION
Signalize the existing four-way stop intersection, and possibly add turn pockets.
ITEM NO.5 SR531/19TH DRIVE NE INTERSECTION
Install a signal at the intersection.
ITEM NO.6 SUNNYSIDEBLVD 1 52ND STREET INTERSECTION
Install a traffic signal, and possibly add channelization and address sight distance.
ITEM NO.7 67TH AVENUE NE 1 84TH STREET NE INTERSECTION
Install a traffic signal with possible pedestrian improvements.
ITEM NO.8 67TH AVENUE 1 GROVE STREET INTERSECTION
Widen the eastbound approach to three lanes.
ITEM NO.9 STATE AVENUE NE 1 SR 528 INTERSECTION
Install eastbound right turn lane.
ITEM NO. 10 SR531/27TH AVENUE NE INTERSECTION
Signalize the intersection with possible additional channelization.
ITEM NO. 11 STATE AVENUE: 100TH STREET NE TO 116TH STREET NE
Widen to a five-lane section with curb, gutter and sidewalk. Replace the Quilceda Creek
culvert and embankment with a bridge or a new culvert,embankment and retaining walls.
1
Attachment #1 page 1 of 3
Updated: June 10, 2003
Adopted:
).
ITEM NO. 12 STATE AVENUE:116TH STREET NE TO 136TH STREET NE
The project will reconstruct State Avenue to a 3 lane roadway section with curb, gutter,
sidewalk, and planter strip on the west side and open drainage ditch on the East side of the
roadway. When development occurs on the East Side of State Avenue, the developer will be
required to widen the roadway to the 5-lane roadway section with curb, gutter, sidewalk, and
planter strip. The project is funded with Transportation Improvement Board, ISTEA, and
Growth Management funds. The construction is anticipated to be complete in 2004.
ITEM NO. 13 116TH STREET NE:INTERSTATE-5 TO STATE AVENUE
The project will widen 116'h Street from a 2-lane roadway section to a 5-lane roadway section
with curb, gutter, and sidewalks, with planter strip. The project will install an enclosed
drainage system. Public Works will be applying for Transportation Improvement Board
funding with local match from Developer Mitigation fees and Arterial Street funds.
ITEM NO. 14 STATE AVENUE:136TH ST. NE TO 152ND ST. NE
The project will widen the existing 2-lane roadway to a 5-lane roadway with curb, gutter,
sidewalk, and a planter strip. The project is funded with Transportation Improvement Board
and Growth Management funds.Staff will apply for Federal ISTEA funds for the project.
The balance of the local match is anticipated to be Growth Management funds.
ITEM NO. 15 STATE AVENUE:GROVE STREET TO 1ST STREET
The project scope includes minor widening, drainage, resurfacing, curb, gutter and sidewalk.
The project will move existing overhead utility facilities. The project will construct
decorative illumination and streetscaping. Construction is scheduled to begin in 2003. In
addition to municipal funds, the City has secured $200,000 of Federal ISTEA funding and
$1,600,000 of Transportation Improvement Board funding.
ITEM NO. 16 SR 528:ALLEN CREEK BRIDGE TO 53RD AVENUE NE
This work involves widening SR528 to provide four lanes of travel from the vicinity of the
Allen Creek Bridge easterlyto 53rd Avenue, including a new entrance to Jennings Park.
ITEM NO. 17 51ST AVENUE NE:GROVE ST.TO 84TH ST. NE
The project proposes to construct a 44-foot roadway section with curb, gutter, sidewalk, and
bike lanes. Snohomish County is preparing an environmental impact Statement for the
corridor from Grove Street to I08
th Street NE.
ITEM NO. 18 88TH STREET NE EXTENSION
This project proposes to provide another east-west traffic corridor. The project is being
constructed in phases from the 7400 block up to the intersection of83 rd Avenue as developer
activity occurs. The City will likely need to complete the portion through the lowlands from
67th Avenue east to the 7100 block. Funding for this project is scheduled to come from
developer mitigation fees and yet to be identified external funding sources. The urban minor
arterial configuration includes the construction of a three-lane roadway, drainage, curb, gutter
and sidewalk.
l
Attachment #1 page 2 of 3 Updated: June 10, 2003
Adopted:
·i
ITEM NO. 19 INTERSTATE-5 NORTH MARYSVILLE INTERCHANGE
This project proposes to build a new interchange in the I52
nd to 156
th Street vicinity. The first
phase of the project is the completion of Access Point Decision Report necessary to complete
the environmental review and proceed into construction plans, specifications and estimate.
ITEM NO. 20 ANNUAL STREET OVERLAY PROGRAM
This project is a continuation of the City's annual pavement maintenance and preservation
program utilizing Arterial Street funds.
ITEM NO. 21 SR-528 I SR-9 INTERSECTION
Install a signal and possibly add channelization. It is anticipated that private development will
design, construct and fund the project as required by Washington State Department of
Transportation to mitigate traffic impacts.
ITEM NO. 22 88TH STREET NE:STATE AVENUE TO 67TH AVENUE NE
The project will widen the existing 2-lane road to a 3-lane roadway with curb, gutter, and
sidewalk. This project involves the acquisition of additional right-of-way.
ITEM NO. 23 51ST AVENUE:84TH STREET NE TO 88TH STREET NE
This project will extend 51st Avenue NE from 84
th Street NE to 88
th Street NE. The project
proposes to construct a 44-foot roadway section with curb, gutter, sidewalk and bike lanes.
Considerable additional right-of-way acquisition is required including possible displacement
of residents. City has completed pre-design to assess the feasibility of this project. The City
plans to conduct a joint environmental review with Snohomish County.
ITEM NO. 24 51ST AVENUE:88TH STREET NE TO 108TH STREET NE
This project will widen 51st Avenue NE from 88
th Street NE to 108
th Street NE. The project
will construct a 44-foot roadway section with curb, gutter, sidewalk and bike lanes.
Snohomish County will take the lead in preparing the design report and conducting the
environmental review phase for project. Project will include signalization of ss"Street NE
and 51st Avenue NE.
ITEM NO. 25 51ST AVENUE NE I 152ND STREET NE INTERSECTION
Signalize the intersection with possible additional channelization.
ITEM NO. 26 67TH AVENUE NE 1100TH STREET NE INTERSECTION
Install a traffic signal with possible additional channelization.
ITEM NO. 27 STATE AVENUE DEBT SERVICE
Anticipated yearly debt payments necessary to provide some of the local match funding to pay
for the Item #14 and #17 projects listed above.
Attachment #1 page 3 of 3 Updated:June 10, 2003
Adopted:
\.
I
L.-
'.
\.
I •
I
2000 4000
Feet
\'
\\'\""I'I )
Attachment #3 ~J
City of Marysville
2004-2009 Six Year
Transportation )
Improvement Plan \
I !'.~~~·l•.....~=
T ;[21 1.'....',
I -,r---~.L_,I
I I
I
•ProjectsNLinearProjectsnCityLimits
j
I
\'----rrn,=TIl '
r-.:',~)/I----"-'~--
.:
,
I
I
\
/
50
20
510
200
300
40 160
--+----
50
153 357
--+---
20
o 300----
GMA-ST--"-
160 OTHER?
300 OTHER?
GMA-ST----_.---~
40
ALL
o
__200_
ALL
---~t ~-;~t -t~-1F----1 50 1-~_-T~-ST_.
- - -+-_-A_~_~.:..=t _---:=,1-_=__~O_TH~_R?___ill __'53 •_IGMA-S.!._~
ALL __+_357 OTHER?
--I-----j--
+ '
---r-
-+--{~1---I-----------
12t---+----r~--=
14 12
16 12
...
SR 531/19TH AVENUE NE INTERSECT/ON
SIGNALIZE INTERSECTION WITH PEDESTRIAN
CROSSINGS
r=:--i=======:--+-I-A14 12
GROVE STREET/ALDER AVENUEINTERSECTION
SIGNALIZE INTERSECTION WITH PEDESTRIAN
CROSSINGSl---!-
1 arr 67THAVENUE HE: SOUTH CITY UMffS TO SR528
3 CrrY
4 CrrY
5 CrrY
2 efrY
tNFIU. SHOULDER IMPROVEMENTS
2004·2009 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (2003-2004 Financially Constrained)Adopted ResolutIon No.tI#ft:*
CITY OF MARYSYILLE...(Thousands of Dollars)
"~I YEAR 1 YEAR 2 YEAR 3 YEARS 4 THROUGH 6 6 YEAR SUMMARY
z ~~e 0 PROJECT NAME AND DESCRIPTION
o #~2006 2007-2009z~~~v~~g,<t-0 2004 OBUG &FUND 2005 OBUG FUND O~L1G&OTHER FUND OBUG&OTHER FUND 6 YR.PROJECT!!.0 ~•~PHASE CITYFUNDS OTHER FUNOS SOURCE &PHASE CITYFUNDS OTHERFUNDS SOURCE PHASE CITYFUNDS FUNDS SOURCE PHASE CITYFUNDS FUNDS SOURCE CITYFUNDS
OTHERFUNDS COST,,
NON MOTORIZED PROJECTS 0 0 0 0 0 0 0 0 0 20 20 0 20 0 20
6 CITY SUNNYSIDE BLVD.152ND ST.NE INTERSECTION 16
INSTALL SIGNAL
"~-------_.~--------
CITY 67THAVENUE NE I GROVE STREET fNTERSECTION 14
W~N E~~:~A:R:CH TO T::~~_-F
107
300
240
100
300
82
300
100
2,850
o
25
200
---I---
-----4-
1,900 OTHER?
100
1,000._
ALL 200---
=-=+~o
~=*~
__30~~
ALL
GMA-5T ,__~!~__
950 OTHERc?'-lIFAL=L=--_-j~_
.OE&RW
~r _.
~-
----
GMA-ST50
PE
GMA-ST
133 STP
GMA-ST
BOND
100 DEV-MIT
1,209 TIB
539
147
__100 _
_.~!:..028
CONST
1-----1----
PE
1--1-----11- - -
4
4
4
12
12-j---j-
12
14
14
,6
14
16
14
-t--+-_._--11_13
R,
---J
STATEAVE: 116THST.NEto 136THST. NE
SIDEWALK WEST SIDE ONLY (utilityupgrades are reflected
In the water and sewer 6-yr plans)
116TH ST.NE:1-5 TO STATE AVENUE
INSTALL EASTBOUND RIGHT TURN LANE._------""~------
SIGNALIZE INTe:SECTI~WI PEO.IMPR~VEMENTS d'~
1
INSTALL SIGNAL
..
-----------1 1
~------------
.1 1
7 CrTY 67THAVENUE 184TH STREETINTERSECTION
8
9 CITY STATEAVENUEISR528fNTERSECTION
12 CrTY
10 CITY SR531/27TH AVENUE NE
13 atr
-,
11 CITY STATE AVE: 100THST. NE TO 116THSTNE
IDEN TO 5 LANE SECTION WITH CURB,GlJTIER AND
SIDEWALK,BRIDGE CONSTRUCTION
DESIGN BOX CULVERT NORTH OF 100TH ----
-----MONITOR FIll.UNTIL FUNDING IS SECURED -
---j-f~--
WI 5 RDACT
GUTIER.AND SIDEWALK1--1--1
ATIACHMENT#2 :pagelof3
Updated:June ra,200,3
Adopted:June ##.2003------------------------------------------------
___i..-J
YEAR 3
CITY OFMARYSYILLE __
YEAR 1
2004·2009 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (2003-2004 Financially Constrained)
(Thousands of Dollars)
YEAR 2
Adopted Resolution No.ftfi
FUND 6 YR.PROJECT
SOURCE CITYFUNDS OTHER FUNDS COST
----1--
I----L---L--l-- -
------r-t-t---300 f--------IGMA-5 T _98l0.046 I ~2_7
1,777 TIB __I-_
____-I_..c'".0c:3.:.7-t0::T.:.H=ER?__ _---
---------
~9 +-796 2,T!!.
2006 2007·2009
FUND OBLiG &OTHER FUND OBUG &OTHER
CITY FUNDS OTHER FUNDS SOURCE PHASE CITY FUNDS FUNDS SOURCE PHASE CITY FUNDS FUNDS
2005 OBllG
&PHASE
FUND
OTHER FUNDS SOURCEM"~~"~:fJ ~~0 (.CoO 2004 OBUG &«..:s.#PHASE CITY FUNDS
---
PROJECT NAME AND DESCRIPTION
STATE AVENUE;GROVE STREET TO 1ST STREET
zo
~
15 CTTY
14 CITY
oz
I~
STA TE AVENUE: 136TH ST. HE TO 152ND ST. NE
"uo",u,u<."~~."uAu"A rcuae,
GL1TTER,AND SIDEWALKf-l--!--
--1---.-.
--'---------t----
--+---_....
--+-----_._..-1--
--1--1------i--+-.__.-._--1----ALLI-·--II~--+-
----1--------
---f -----f-
-f------
--.----1-------
+-------
41717CITY51STAVENUENE: GROVE STREET TO fUTH ST. NE
_r---WIDEN TO 3 LANES
--.----------t--+----+--
NEW ALIGNMENT PROJECTS ~.0 *0 0 "jg",./~0 0 0 ~s ~"":H'-650 50 600 f 9,600 94 h 9,506 II 144 10,106 10,250
300
'85
__-,',.:300
240
1,150
60
'50
310 4,700 5,o10
__---'0
-40±=_..::'4::::0+-
--+-----r--- -
--t-----
150 CO?
GMA·ST
4700 OTHER?
5.000 OTHER
.1,000 OTHER?
ART·ST
GMA-5T
94
150
60
__-I~~4,506 OTHER?
I--f"
CONST
II---!---
GMA-ST
600
50
1Jlt-_-----:
1:'0
ALL
PE
-~Ih-----==--I
+-----1
--+-
-r-----~-_______+___l·1
----1-----------1-
---1--
-r------"~_-t-~.~-----+-
I-----t------j---~--
--t-_~--t---
4
12
'2
16
17
11
17
17
14
WIDEN TO 44 FT.SECTION.CURB &SIDEWAlKS
51ST AVENUE NE;88TH ST. NE TO 108TH ST.HE
51ST AVENUE NE /152ND ST.NE INTERSECTION
51ST AVENUE HE:84TH ST.NE TO 88TH ST.HE 17
NEW ALIGNMENT WIDEN TO 44 FT SECTION,C3RB.
SIDEWALKS1--+------ ---
1--!-~----I
21 mOOT SR 528/SR 9 INtERSECTION
SIGNALIZEINTERSECTIONWHEN WARRANTE:~D I-
...
24 CO
23 co
25 CO
19 mOOT 1-5NORTH MARYSVIUE INTERCHANGE
CONSTRUCT INTERCHANGE,PREPARE ACCESS POINT
DECISION REPORT (APDR)
22 CO 88THSTREETHE:STATEAVE.T067THAVE.NE
WIDEN TO 3LAN"E",S,-_
I
201 CITY
+-
18 CITY 88TH STREET 8CTENSfON
CONSTRUCTROADWAY WITH CURB,GUneR,AND
SIDEWALK (67TH AVE. TO 84TH)I-l--!------.----
1=:I:=j=IN=STALlS='~G=NA~L========:====j:==I==t=j====t====t===j===II=---==-------=i====t===::l:=ALL 240 OTHER?
ATIACHMENT #2 page 2 of 3
Updated:June 18.20~3
Adopted:June ##.2003
,,
2004 -2009 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (2003-2004 Financially Constrained)
(Thousands of Dollars)
I YEAR 1 YEAR 2 YEAR 3 YEARS 4 THROUGH 6
Adopted Resolution No.####
6 YEAR SUMMARY
oz
!!,
26 co
zo
~PROJECT NAME AND DESCRIPTION
67TH AVENUE NE/1ooTH ST. NE INTERSECTION
""i~~~aBUG.FUND 2005 aBUG FUND ~~~:.OTHER FUND ~~~~-:009 OTHER FUND 6 YR.PROJECT#~~?200p~SE CITY FUNDS OTHER FUNDS SOURCE &PHASE CITY FUNDS OTHER fUNDS SOURCE PHASE CITY FUNDS FUNDS SOURCE PHASE CITY FUNDS FUNDS SOURCE CITY FUNDS OTHER FUNDS COST
300
INSTALLSIGNAL
STA TE,FEDERAL AND OTHER FUNDS:
a WSDOT a WSDOT 145 WSOOT a WSDoT 145 WSDOT
;~--.~---~
133 STP a STP a STP a STP 133 STP_._--
a OTHER?a OTHER?---2,390 OTHER?25,234 OTHER?_2~,~OTHER?--
2,232 TIB 658 TIB 864 TIB 1,777 TlB ~.??~~~--------co co CO 150 CO 150 CO--lOa DEV·MIT a DEV-MIT a DEV·MIT a DEV·MIT 100 OEV·MIT-
2465 SUB TOT 658 SUB TOT :3 399 SUB TOT 21.161 SUB TOT 3361J3 5UBTOT
-......--ltiMA-ST --GMA-ST 754 GMA.sT 776 GMA-ST 3,100 GMA-ST _~,383
.'-----~-.
CITY-ST 0'CITY-ST a CITY-ST a CITY·ST a CITY-ST
-...--~---
ART·ST 143 I ART-ST 143 ART-ST 579 ART-ST 1,008 ART-ST-_._-
OTHER (CTY)BONO 0.1
.'..BOND 2,371---_.
SVBTO 897 SUB Tor ·919 SUBro 367 SUB rOT 762 SVBTOT
I .1:',
-5,732_1,555 4,318 '!IiIlJ!<30,840 ~W#f&#*j .,.•
.-----
I
2006 2007-2009 Ii 6 YR.
OTHER FUND 2005 OBUG OTHER FUND osuc &CITY OTHER FUND OBUG &CITY I:OTHER FUND
OTHER PROJECT
FUNDS SOURCE &PHASE CITY FUNDS FUNDS SOURCE PHASE FUNDS FUNDS SOURCE PHASE FUNDS L FUNDS SOURCE CITY FUNDS
FUNDS COST
$0 $0 $0 $0 $0 $0
$0 $20 $20 $0
,$20 $0 .$20
$0 $0 $0 $0 $0 $0 $0 $50 $50 $0 $50 $0 $50
$0 $0 $0 $0 $510 $153 $357 $0 $0 $0 $153 $357 $510
$0 $0 $0 $0 $0 $0 $0 $200 $40 .$160 $40 $160 $200
$0 $0 $0 $0 $0 $0 $0 $300 $0 $300 $0 $300 $300
$0 $0 $0 $0 $0 $0 $0 $300 $60 $240 $60 $240 $300
$100 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $100 $100
$0 $0 $0 $0 $0 $0 $0 $240 $50 $190 $50 $190 $240
$$($$($($C $C $10 $2 $82 $2 $82 $10
$0 $0 $0 $0 $0 $0 $0 $300 $0 $300 $0 $300 $300
$0 $10 $10 $0 $50 $50 $0 $1,000 $200 $800 $273 $BOO $1,073
$1,34 $sc s $<'sc $ $ $0 $68 $1,342 $2,028
$0 $50 $50 $0 $1,000 $50 $950 $2,000 $100 $1,900 $200 $2,850 $3,050
$227 $1,058 $400 $658 $1,476 $129 $1,347
,$3,114 $300 $2,814 $981 $5,046
$6,027
$796 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,979 $796 $2,775
$0 $0 $0 $0 $0 $0 $0
,$398 $119 $279
$119 $279 $398
$0 $0 $0 $0 $0 $0 $0 $4,000 $800 $3,200 $BOO $3,200 $4,000
$0 $0 $0 $0 $10 $10 $0 $4,600 $94 $4,506 $104 $4,506 $5,010
$0 $0 $0 $0 $50 $50 $0 $5,000 $0 $5,000 $50 $5,000 $4,650
$0 $0 $0 $0 $600 $0 $600 $429 $429 $0 $429 $600 $5,600
$$14 $14 $($14 $14
$($0 s $0 $42<$0 $B5
$0 $0 $0 $0 $185 $40 $145 $5,000 $300 $4,700
$340 $4,845 $185
$0 $0 $0 $0 $0 $0 $0 $1,000 $0 $1,000 $0 $1,000 $1,000
s $<$($0 $$C i $1,30 $15 $1,150 $15 $1,150 $1,300
$0 $0 $0 $0 $0 $0 $0 $300 $60 $240 $60 $240 $300
$($<$($$$$C $3Q(s $300 $C $300 $30
$0 $294 $294 $0 $294 $294 $0 $882 $882 $0 $1,764 $0 $1,764
, ,,',,..•:.t ,,....
-
753
a
143
2,311-_
·3267r--
I I
2004 OBUG &
PHASE CITY FUNDS
12 $0 $0
12 $0 $0
12 $0 $0
12 $0 $0
12 $0 $0
12 $0 $0
12 $100 $0
12 $0 $0
12 s s
12 $0 $0
4 $13 $13
4 $2,02 $68
4 $0 $0
4 $379 $152
4 $2,775 $1,979
5 $0 $0
4 $0 $0
4 $0 $0
1 $0 $0
4 $0 $0
12 $14 $14
12 $0 $0
1 $0 $0
4 $$
12 $0 $0
12 $$0
$294 $294
13 CITY 116TH ST. NE: 1·5TO STATE AVENUE 16
14 CITY STATE AVENUE: 136TH ST. NE TO 152NO ST. NE 14
15 CITY STATE AVENUE: GROVE STREET TO 1ST STREET 14
16 CITY SR 528: ALLEN CREEK TO 53rd AVENUE NE 14
17 CITY 51ST AVENUE NE:GROVE STREET TO 84TH ST, NE 17
18 CO 88TH STREET NE:STATE AVE. TO 67TH AVE. NE 17,.CITY 88TH STREET EXTENSION 17
20 WSOOT 1-5NORTH MARYSVILLE INTERCHANGE 16
21 CITY ANNUAl STREET OVERLAY PROGRAM 14
22 WSDOT SR 5281 SR 9 INTERSECTION 14
23 co 51ST AVENUE NE: 84TH ST. NE TO 88TH ST. NE 17
24 CO 51ST AVENUE NE: 88TH ST. NE TO 108TH ST. NE 16
25 co 51ST AVENUE NE/152ND ST, NE INTERSECTiON 17
2.co 67TH AVENUE NE 1100TH ST. NE INTERSECTiON 14
27 co STATE AVENue DEBT SERVICE
7 CITY 67THAVENUE/84THSTREETINTERSECTION 14
8 C!TY 67TH AVENUE NE I GROVE STREET INTERSECTION 14
9 CITY STATE AVENUE I SR 528 INTERSECTION 14
10 CITY SR531 1 27TH AVENUE NE 16
11 CITY STATE AVE:100TH ST. NE TO 116TH ST NE 14
12 CITY STATEAVE:116THST.NEto136THST.NE 14
PROJECT NAME AND DESCRIPTION
WSooT WASH. ST. DEPT OF TRANSPORTATION
STP FED.ROADSFUNDSINCL HAZA=R..a..E=L""IM"'~-I__+_
OTHER UNKNOWN?
GMA-ST GROWTH MANAGEMENT S"'T"'R"'E"ET"S'--I__+_
CITY-$T CITYSTREETS-SALESTAX
CITY FUNDS:
;1 CITY 67TH AVENUE NE: SOUTH CITY LIMITS TO SR528 14
2 CITY GROVE STREET 1 ALDER AVENUE INTERSECTION 16
3 CITY SR 528/47TH AVENUE INTERSECTION 14
4 CITY 47th AVEJNUE NE 13RD STREET INTERSECTION 16
5 CITY SR 531 1 19TH AVENUE NE INTERSECTION 16
6 CITY SUNNYSIDE BLVD./52NO ST. NE INTERSECTION 16
Pi ANNED EXPENQlTURES SUMMARY BY pROJECT:
__ART·ST ARTERIALSTREETFUND
OTHER REVENUE BOND
I~r - --
TlB TRANSPORTATION IMPROVEMENT BOAR..D'-+_-I__+_+~
I-----fQ _SNOHOMISH COUNTY
DEV..MIT DEVELOPER MrrtGATIONFUNDS
ATTACHMENT #2 page 3 of 3
Updated:June 18.20~3
Adopted:June #fI,2003