Loading...
HomeMy WebLinkAboutR-2149 - Adopting a Six-year Transportation Improvement Program (2006-2011)CITY OF MARYSVILLE Marysville,Washington RESOLUTION NO.,)J'!! A RESOLUTION OF THE CITY OF MARYSVILLE ADOPTING A SIX-YEAR TRANSPORTATION IMPROVEMENTPROGRAM (2006-2011) WHEREAS,the City Council of the City of Marysvill e,Washington, pursuant to RCW 35.77.010,held a public hearing on Ju ly 11,2005 for the purpose of revising and extending its Comprehensive Six -Year Transportation Program;and WHEREAS,the City Council has reviewed the current status of City streets and has considered the testimony and exhibits presented at the public hearing,and finds that the programs presented by the Public Works Department are in the long -range best interests of the City;NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF MARYSVILLE, WASHINGTON AS FOLLOWS: 1.The Comprehensive SiX-Year Transportation Improvement Program (2006-2011)presented to the City Council,copies of which are on file and open to public inspection at the office of the City Clerk,is hereby approved and adopted in its entirety. 2.The Six-Year Transportation Improvement Program as presented to the City Council,copies of which are on file and open to public inspection at the office of the City Clerk,is hereby approved and adopted in its entirety. 3.The City Clerk is hereby directed to file copies of said Programs with the Secretary of Transportation. ~ED by the City Council and APPROVED by of:JZ.,!,200 5 . the Mayor this I/~day CITY OF MARYSVILLE By~~;./dlI DENNIS KENDALL,Mayor ATTEST: BY~tu~G~~:City Clerk Approved as to form: By;~-;M:;~ GRANT K.WEED,City Attorney ------------- ITEM NO.3 52ND STREET NE / SUNNYSIDE BLVD.INTERSECTION Install a traffic signal, and possibly add channelization. page 1 of 3 Updated:06/20/2005 Recommendedfor Adoption:06/27/2005 ITEM NO.4 GROVE STREET / 67TH AVENUE NE INTERSECTION Widen the eastbound approach to three lanes (right tum, through, and left tum lanes.) ITEM NO.6 GROVE STREET / ALDER AVENUE SIGNAL The project will signalize the intersection with pedestrian crossing. This signal may include interconnection with the signal controller of the Grove Street / State Avenue signal. ITEM NO.5 STATE AVENUE NE/SR528 INTERSECTION Install eastbound right tum lane. Likely will be dependent on the redevelopment of adjacent property required to dedicate necessary right-of-way to make this improvement. ITEM NO.1 SR 528 / 47TH AVENUE NE INTERSECTION Reconstruction of intersection to provide additional east-west through lanes and longer turn- pockets. Work involves installing new traffic signal, and increasing tum radii on all four comers. 2006-2011 SIX YEAR TRANSPORTATION PLAN PROGRAM NARRATIVE ITEM NO.2 3RD STREET / 47TH AVENUE NE INTERSECTION Signalize the existing four-way stop intersection, possibly add turn pockets,and coordinate signal timing with 4 th Street/47 th Avenue intersection to improve north/south traffic flow. ITEM NO.7 STATE AVENUE: 116TH STREET NE TO 136TH STREET NE The project will construct curb, gutter and sidewalk on the west side, widen to a 3-lane section, with eventual developer frontage improvements on the east side providing a 5 lane roadway section. ITEM NO.8 STATE AVENUE: 136TH STREET NE TO 152ND STREET NE The project will widen the existing 2-lane roadway to a 5-lane roadway with curb, gutter, and sidewalk. Attachment #1 ITEM NO.9 116TH STREET NE: INTERSTATE-5 TO STATE AVENUE The project will widen 116 th Street from a 2-lane roadway section to a 5-lane roadway section with curb, gutter, and sidewalks. North half to be constructed by a developer in the near future, with the south half constructed via City capital project,developer improvements,or some other means in the future. ITEM NO. 10 SR 528: ALLEN CREEK BRIDGE TO 53RDAVENUENE This project will rechannelize SR528 to four general purpose lanes and modify entrance to Jennings Park. This is one of the last stages in order to provide a full 5 lane roadway section from Interstate 5 to the eastern City limits near SR 9. ITEM NO.11 STATE AVENUE:100TH STREET NE TO 116TH STREET NE This project will provide a 5 lane roadway section, add gutter, gutter and sidewalk, and replace the Quilceda Creek culvert and embankment overcrossing with a bridge or a new culvert,embankment and retaining walls. ITEM NO. 12 SUNNYSIDE BOULEVARD,47TH AVE.NE-52ND ST. NE This project will add one general purpose lane each direction with middle dual left turn lane, bike lanes, and curb, gutter &sidewalk. ITEM NO. 13 88TH STREET NEEXTENSION: 68TH AVE. TO 74TH AVE. Construct a new roadway alignment through the Grace Creek basin consisting of 2 lanes, curb, gutter and sidewalk. Coupled with developer roadway construction to the east, this will provide connections from 67'h Avenue to SR 9 as the alternate,preferred to the existing 84 th Street NE corridor. ITEM NO. 14 INTERSTATE-5 NORTH MARYSVILLE INTERCHANGE This project proposes to build a new interchange in the l52nd Street NE vicinity. The first phase of the project is the completion of Access Point Decision Report necessary to complete the environmental review and proceed into construction plans,specifications and estimate assumedly for Concept 2A. ITEM NO. 15 ANNUAL STREET OVERLAYPROGRAM Miscellaneous locations determined and prioritized by the existing pavement condition. ITEM NO. 16 108THSTREET NE I 51STAVENUENE INTERSECTION Snohomish County project converting the two adjacent existing three-legged intersections (Shoultes Road/1 os"Street NE and 108 lh Street NE/51 51 Avenue NE) into one roundabout. ITEM NO. 17 122ND PLACE NE I 51STAVENUENE INTERSECTION Snohomish County project to install a signal, widen intersection legs, and raise profile of 51 51 Avenue. Attachment #1 page2 of 3 Updated:06/20/2005 Recommended for Adoption:06/27/2005 ITEM NO. 18 67TH AVENUE: 108THSTREET NE TO 132ND STREET NE This project proposes to reconstruct the roadbed and surface the existing 2-1aneroadway. ITEM NO. 19 51ST AVENUE NE I 152ND STREET NE INTERSECTION Proposed Snohomish County project to install a traffic signal and possibly provide additional channelization. ITEM NO. 20 67TH AVENUE NE 1100TH STREET NE INTERSECTION Proposed Snohomish County project to install a traffic signal, and possibly provide additional channelization. ITEM NO. 21 51ST AVENUE: 84TH STREET NE TO 88TH STREET NE Proposed Snohomish County project to construct a new roadway alignment of a 44-foot wide roadway section with curb, gutter and sidewalks. ITEM NO. 22 4TH STREET I INTERSTATE 5 INTERCHANGE Increase capacity by additional channelization and possibly a larger overpass. ITEM NO. 23 88TH STREET NE: STATE AVENUE TO 67TH AVENUE NE Proposed joint Snohomish CountylMarysville project to widen the existing 2-lane road to a 3- lane roadway with curb, gutter and sidewalks. Also provide capacity improvements at arterial intersections. ITEM NO. 24 152ND STREET NE: STATE AVENUETO 67TH AVENUE NE Proposed joint Snohomish CountylMarysville project to widen the existing 2-lane road to a 3- lane roadway with curb, gutter and sidewalks. Also provide capacity improvements at arterial intersections ITEM NO. 25 STATE AVENUE DEBT SERVICE Yearly debt payments necessary to provide a portion of the local match funding to pay for the State Avenue, Grove Street to First Street and I16 th Street NE to 136 lh Street NE projects. I I I I Attachment #1 page 3 of 3 Updated:06/20/2005 Recommended for Adoption:06/27/2005 6 YEAR SUMMARY 3,450 4,176 ,I 7,626 80 \ I .00320I-+- I -r ,30 1 -+----190 .320 I I -1--- 300 -k=300'- ---- 240 0+__240 I 250 °L 250 =1 -r- 50 0 I 50 I ~t--~_~'4,400, Adopted Resolution No.__ IGMA-ST ---, --'-~-T GMA·$T -f-r- + _FA-ST ------j- tGMA-ST 1-__ ~-+- i, 240 I YEARS 4 THROUGH 6 ------t ALL ALL ALL -+---- YEAR 3 -+. ---=r::--+-t --+-- 4,522 I----':::=::-j CNICE 2006 - 2011 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (Thousands of Dollars) YEAR 2 + +--+----=t:L_.__CN/C~~320 ~:~~- -,----+-----. 1---='<04 '60J ~+GMA-ST ---t---_-'-If-__-II-+-+-_.---.-1- ~,++--[1----I----+---CN~E =r._~:~ER_~~-~=r '-r-L- +.-t--+--t -+ +--1'-'-+--1--1------j--1--+---__.J.+---t -+---+----I~.,,---=-I -I ----------+-----+----+--+---j-+---I-:-:-:----==-~ --!-----I-----I-----+--~+------I- I --+---I~-=C=j-.-=i-~--=f~==1 1 -~ , ~!GMA-ST-'--- t--- .--L -t--- 70 ! YEAR 1 ~---_.- .Lm PE/RW ALL ,.4 ----_t_ GROVE STREET /67TH AVENUE NE INTERSECTION WIDEN EASTBOUND APPROACH TO THREE LANES r I ---.----t,, S2ND STREET HE I SUNNYSIDE BL vafNTERSECTIO ..""_......rNSTALL SIGNAL 3 CITY 5 CITY 6 CITY I 8 CITY 4 CITY 7 CITY SR 528 /47TH A VENUE NE INTERSECTION INTERSECTION IMPROVEMENTS 3RD STREET /47TH AVENUE NE INTERSECTION SIGNALIZE WITH ADDITIONAL CHANNELIZATION ---t---+-- STATE A VENUE I SR 528 INTERSECTION 14 1-+_-4INSTAll EASTBOUNDRIGHTTURN LANEASA CONDITION ",-' OF DEVELOPMENT ----+-t--~_ GROVE STREET I ALDER A VENUE ~"1'2 :~:;' I--_L._......SIGNALIZE INTERSECTION WITH PEDESTRIAN CROSSIN~_t~_--=1-----1---- I . 12,150 ----1- -t- 750 ---,- +G_MA-$T 100 {- 400 -f0THER?--1---+.-=r I -, --+- I---4 CN I---I---t---..---+-- "I II i -!, I I- t +- +- 100+--o'-::G"MA-C:-_=ST=---t--:-=:-:-:-+ -~'_._----- I 1900 O::TH~E::Rc:?,-_--11"":;';;;;;"'--'-J--l--j----- --+--+-- ----+- ---=PE/RW ---t -+------t"- -.-_-FA.~T~_- _.~+----1"'=:':':':"_-1 -l+---- I I ._---r+-- I-+ t-- I -+- PE PE -------1-.. CNICE PE 4,~_,?STATE AVENUE:100THST,NE TO 116TH ST, NE 14.---t WIDENTO 5 LANESECTIONWITH CURB,GUnER ANO._----.. SIDEWALK,AND REPLACEaUllCEDA OVERCRQSSING J I- 11 CfTY 10 CfTY I 12 CfTY SUNNYSIDE BOULEVARD,47TH A VE.NE TO 52NtJ S 17 4---------l-.__. 1GENERALPURPOSELANEEACHDIRECTIONWITH DUAL-----~~~ I--+__-,L._EFT_TU__RN ~E.BIKELANES,&CURB,G~DEW~~K _ J , ATTACHMENT #2 G:ISharedlEngineeringlTransportationlTiP_06_11106-011 CityTiP page 1 of3 Updated:6/27/2005 Recommended for Adoption:06/28/2004 #REF! 49.800 433 8,400 9.000 1,920 49,300.-+-_---"-'=-1 o 6 YEAR SUMMARY #REF!; ----.ool---+-----c-:-:-I Adopted Resolution No.__ 1------:--:-+----+------ 5,700 6.000 I----+----!---- 0 400 400 400 COUNTY? 0,400 400 400 ICOUN~_I + 250 ICOUNTY? 0 2'0 2'0-- +---- 0 900 900 YEARS 4 THROUGH 6 ~.--+-- =~----I-- LL ALL ALL PE PE ALL CN --t-~--j--=-l---+----I --11-----+--+----------+- I +-----1----- +----t-~-Wl,-1-__-t-t-__ 2000 IOTHER? I I YEAR 3 ~=--C I --+----1-. PE PE ---1----.-+ _l~~A-ST 1800 'OTHER?'-H---~~----I-~~~~~~~~----+-----"=::.:'--~I----~--T__---t----~~ 46000 1 1,0~OTHER? ___---1-.~_ 30 : i-- PE 1----1-----;--- YEAR 2 2006·2011 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (Thousands of Dollars) ---1-------1 TV F~-_+:-='*-~-- , -+--_--J l~l---I---tl---~_.--+----=1 I--+-----;--,---------+-==-f-~I--I--+---+-~I -I ~---I----=J --+---1 TV ALL _I *_"280_(CO~NTV - ! WIll 433 COUNTY I 1379 iCOUN- 300 ~.- YEAR 1 ± I I ~==1===f---i-1- ALL ALL 12 1217 17 r","'-TB-B-TH~S~T~R£~ET""'£J<T~~E-N-S-IO-N--------+-16 ~_. oz ~ 14 WSDOT 13 CITY 19 COUNTY 51ST A VENUE NE 1152ND ST, NE INTERSECT/ON !-_-+IN::S:.:T::A,Ll SIG_N_A_L _ 17 COUNTY 122ND PLACE NE /51ST AVENUE NE fNTERSECTIO ~17~ ~~TALL SIGNAL,WI~EN I~TERSECTION_LEGS,RAISE~.'.. PRO~~LEO~_51STAVENUE ~.~-~" I ' 24 COUNTY 152NDSTREETNE:STATEAVE".T067THAVE.NE 16 4 f_+;;.;...!'WIDEN TO A 3 LANE ROADWAY SECTION WITH IMPROVEMENTS +-_-+A::T"ARTERJALINTERSECTIONS -- ..~f Y1=!2 21 I COUN7Y "57AVENUE NE,84TH ST.NET088TH ST. NE I 12J , t-_-f=Ec:IS"AND DESIGN FOR NEW ALIGNMENT FOR A 44 FOOT WIDE I-+_-!ROADWAY SECTION WITH CURB,GUTIER AND SIDEWALKS 16 COUNTY 108TH STREET NE 1515T A VENUE NE INTERSECTfO CONVERTTWO ADJACENTTHREE LEGGED---".--t_+__t-"IN"T::E"RS::E::C::T"I,ONS INTO A ROUNDABO'-U_T ~~--+--IE;1_----+--1_ 22 WSOOT 4TH5TREET/fNTERSTATE5INTERCHANGE 11 1-_t-__fIN"C"R"EA---,S.=E",CAPACITY BY ADDITIONAL CHANNEllZAT;:IO:cN'---+~_1 AND POSSIBLY LARGER OVERPASS 20 COUNTY 67TH A VENUE NE 1100TH 5T. NE INTERSECTION I_--,-_-!INSTALL SIGNAL CONSTRUCT ROADWAY WITH CURB,GUTIER,AND SIDEWALK 1---!-__+(68THAVE."TO 74TH-I------r "'NORTH MAR:SVlLLE INTERCHANGE -.~ THIS COST ESTIMATE INCLUDESPREPARINGAN ACCESS POINT--.-- DECISION REPORT, THEN CONSTRUCTING CONCEPT 2A i 1__+ 23 COWTY 88TH STREET NE:STATE AVE.TO67TH AVE.NE 16J 'CfTY WIDEN TO A 3 lANE ROADWAY SECTION WITH IMPROVEMENTS----1_+__fA:.:T.:.A::.R:.:T.=E:.:RIAlINTERSECTIONS ATIACHMENT#2 G:ISharedlEnglneeringlTransporlationlTIP_06_11\06--011 City TIP page 2of3 Updated:6/27/2005 Recommended for Adoption:06/28/2004 2006·2011 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (Thousands of Dollars) SUB TOT I I 6 YEAR SUMMARY 94,139 SUB TOT 1.61:...7+,_ 12,5"3,,,3+-__~[G-MA-5T_ 15,131 GMA·5T GMA·ST 16,748 Adopted Resolution No.__ GMA-ST :GMA-ST JGMA-$T 6,621 4,761 YEARS 4 THROUGH 6 1,860 -4-- --'. --"------t----+--+ YEAR 3 7,540 SUB TOT SUB TOT I --~+----- --c-tGMA-ST_ __+GMA-ST :GMA-5T----:--- YEAR 2 (52)GMA-$T--->-;-- (1,JO",O'-!.)+-_IGMA-5T _~65+__tART_ST- -t----- ~~T_ 5,349 SUB TOT YEAR 1 --:--- _.-t--" -+ -t + --+--- ..~-)STATE.FEDERALAND OTHERFUNDS: -t- tWs,r;~WASH$.DEPTOF TRA'NSPO;r:;.nQN - lSTP i FED.ROADSFUNDS;NCl HAZARD ELiM.-r"-+~-~-----.__. OTHER?"UNDETERMINED -t-r-r-~----.•---- ATTACHMENT #2 G:ISharedlEngineeringlTransportatlonlTiP_06_11106-011 City TIP page 30f3 Updated:6/27/2005 Recommended for Adoption:06128/2004 • Point Projects I I ,y-r I LJ _f- 1 Feet 2000 4000o -Linear ProjectsoCity Limits j /' ,19'/ Tulalip Reservation City Clerk NOTICE OF PUBLIC HEARING MARYSVILLE CITY COUNCIL NOTICEIS HEREBY GIVEN THAT THECITYOF MARYSVILLE WILL HOLDA PUBLIC HEARING ON MONDAY,JUNE27,2005AT7:00P.M.TO CONSIDER THE FOLLOWING: A RESOLUTION OFTHECITYOF MARYSVILLE ADOPTING A SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2006-2011)IN ACCORDANCE WITH RCW35.77-010. THE HEARING WILLBEHELDINCITY HALL,COUNCIL CHAMBERS,1049 STATE AVENUE,MARYSVILLE,WASHINGTON. ANY PERSON MAY APPEAR ATTHE HEARING AND BE HEARD IN SUPPORT OF,ORIN POOSITION TO THIS PROPOSAL.ADDITIONAL INFORMATION MAYBE OBTAINED AT THE MARYSVILLE CITY CLERK'S OFFICE,1049 STATE AVENUE,MARYSVILLE,WASHINGTON,98270,(360)363-8000. CITYOF MARYSVILLE GERRY BECKER,CITY CLERK DATED JUNE ,2005 NOTICE DOESNOT REQUIRE PUBLICATION