HomeMy WebLinkAboutR-2149 - Adopting a Six-year Transportation Improvement Program (2006-2011)CITY OF MARYSVILLE
Marysville,Washington
RESOLUTION NO.,)J'!!
A RESOLUTION OF THE CITY OF MARYSVILLE ADOPTING A SIX-YEAR
TRANSPORTATION IMPROVEMENTPROGRAM (2006-2011)
WHEREAS,the City Council of the City of Marysvill e,Washington,
pursuant to RCW 35.77.010,held a public hearing on Ju ly 11,2005 for the
purpose of revising and extending its Comprehensive Six -Year
Transportation Program;and
WHEREAS,the City Council has reviewed the current status of City
streets and has considered the testimony and exhibits presented at the
public hearing,and finds that the programs presented by the Public Works
Department are in the long -range best interests of the City;NOW,
THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF MARYSVILLE,
WASHINGTON AS FOLLOWS:
1.The Comprehensive SiX-Year Transportation Improvement Program
(2006-2011)presented to the City Council,copies of which are on file
and open to public inspection at the office of the City Clerk,is hereby
approved and adopted in its entirety.
2.The Six-Year Transportation Improvement Program as presented
to the City Council,copies of which are on file and open to public
inspection at the office of the City Clerk,is hereby approved and
adopted in its entirety.
3.The City Clerk is hereby directed to file copies of said
Programs with the Secretary of Transportation.
~ED by the City Council and APPROVED by
of:JZ.,!,200 5 .
the Mayor this I/~day
CITY OF MARYSVILLE
By~~;./dlI
DENNIS KENDALL,Mayor
ATTEST:
BY~tu~G~~:City Clerk
Approved as to form:
By;~-;M:;~
GRANT K.WEED,City Attorney
-------------
ITEM NO.3 52ND STREET NE / SUNNYSIDE BLVD.INTERSECTION
Install a traffic signal, and possibly add channelization.
page 1 of 3 Updated:06/20/2005
Recommendedfor Adoption:06/27/2005
ITEM NO.4 GROVE STREET / 67TH AVENUE NE INTERSECTION
Widen the eastbound approach to three lanes (right tum, through, and left tum lanes.)
ITEM NO.6 GROVE STREET / ALDER AVENUE SIGNAL
The project will signalize the intersection with pedestrian crossing. This signal may include
interconnection with the signal controller of the Grove Street / State Avenue signal.
ITEM NO.5 STATE AVENUE NE/SR528 INTERSECTION
Install eastbound right tum lane. Likely will be dependent on the redevelopment of adjacent
property required to dedicate necessary right-of-way to make this improvement.
ITEM NO.1 SR 528 / 47TH AVENUE NE INTERSECTION
Reconstruction of intersection to provide additional east-west through lanes and longer turn-
pockets. Work involves installing new traffic signal, and increasing tum radii on all four
comers.
2006-2011 SIX YEAR TRANSPORTATION PLAN
PROGRAM NARRATIVE
ITEM NO.2 3RD STREET / 47TH AVENUE NE INTERSECTION
Signalize the existing four-way stop intersection, possibly add turn pockets,and coordinate
signal timing with 4
th Street/47 th Avenue intersection to improve north/south traffic flow.
ITEM NO.7 STATE AVENUE: 116TH STREET NE TO 136TH STREET NE
The project will construct curb, gutter and sidewalk on the west side, widen to a 3-lane
section, with eventual developer frontage improvements on the east side providing a 5 lane
roadway section.
ITEM NO.8 STATE AVENUE: 136TH STREET NE TO 152ND STREET NE
The project will widen the existing 2-lane roadway to a 5-lane roadway with curb, gutter, and
sidewalk.
Attachment #1
ITEM NO.9 116TH STREET NE: INTERSTATE-5 TO STATE AVENUE
The project will widen 116
th Street from a 2-lane roadway section to a 5-lane roadway section
with curb, gutter, and sidewalks. North half to be constructed by a developer in the near
future, with the south half constructed via City capital project,developer improvements,or
some other means in the future.
ITEM NO. 10 SR 528: ALLEN CREEK BRIDGE TO 53RDAVENUENE
This project will rechannelize SR528 to four general purpose lanes and modify entrance to
Jennings Park. This is one of the last stages in order to provide a full 5 lane roadway section
from Interstate 5 to the eastern City limits near SR 9.
ITEM NO.11 STATE AVENUE:100TH STREET NE TO 116TH STREET NE
This project will provide a 5 lane roadway section, add gutter, gutter and sidewalk, and
replace the Quilceda Creek culvert and embankment overcrossing with a bridge or a new
culvert,embankment and retaining walls.
ITEM NO. 12 SUNNYSIDE BOULEVARD,47TH AVE.NE-52ND ST. NE
This project will add one general purpose lane each direction with middle dual left turn lane,
bike lanes, and curb, gutter &sidewalk.
ITEM NO. 13 88TH STREET NEEXTENSION: 68TH AVE. TO 74TH AVE.
Construct a new roadway alignment through the Grace Creek basin consisting of 2 lanes, curb,
gutter and sidewalk. Coupled with developer roadway construction to the east, this will
provide connections from 67'h Avenue to SR 9 as the alternate,preferred to the existing 84
th
Street NE corridor.
ITEM NO. 14 INTERSTATE-5 NORTH MARYSVILLE INTERCHANGE
This project proposes to build a new interchange in the l52nd Street NE vicinity. The first
phase of the project is the completion of Access Point Decision Report necessary to complete
the environmental review and proceed into construction plans,specifications and estimate
assumedly for Concept 2A.
ITEM NO. 15 ANNUAL STREET OVERLAYPROGRAM
Miscellaneous locations determined and prioritized by the existing pavement condition.
ITEM NO. 16 108THSTREET NE I 51STAVENUENE INTERSECTION
Snohomish County project converting the two adjacent existing three-legged intersections
(Shoultes Road/1 os"Street NE and 108
lh Street NE/51 51 Avenue NE) into one roundabout.
ITEM NO. 17 122ND PLACE NE I 51STAVENUENE INTERSECTION
Snohomish County project to install a signal, widen intersection legs, and raise profile of 51 51
Avenue.
Attachment #1 page2 of 3 Updated:06/20/2005
Recommended for Adoption:06/27/2005
ITEM NO. 18 67TH AVENUE: 108THSTREET NE TO 132ND STREET NE
This project proposes to reconstruct the roadbed and surface the existing 2-1aneroadway.
ITEM NO. 19 51ST AVENUE NE I 152ND STREET NE INTERSECTION
Proposed Snohomish County project to install a traffic signal and possibly provide additional
channelization.
ITEM NO. 20 67TH AVENUE NE 1100TH STREET NE INTERSECTION
Proposed Snohomish County project to install a traffic signal, and possibly provide additional
channelization.
ITEM NO. 21 51ST AVENUE: 84TH STREET NE TO 88TH STREET NE
Proposed Snohomish County project to construct a new roadway alignment of a 44-foot wide
roadway section with curb, gutter and sidewalks.
ITEM NO. 22 4TH STREET I INTERSTATE 5 INTERCHANGE
Increase capacity by additional channelization and possibly a larger overpass.
ITEM NO. 23 88TH STREET NE: STATE AVENUE TO 67TH AVENUE NE
Proposed joint Snohomish CountylMarysville project to widen the existing 2-lane road to a 3-
lane roadway with curb, gutter and sidewalks. Also provide capacity improvements at arterial
intersections.
ITEM NO. 24 152ND STREET NE: STATE AVENUETO 67TH AVENUE NE
Proposed joint Snohomish CountylMarysville project to widen the existing 2-lane road to a 3-
lane roadway with curb, gutter and sidewalks. Also provide capacity improvements at arterial
intersections
ITEM NO. 25 STATE AVENUE DEBT SERVICE
Yearly debt payments necessary to provide a portion of the local match funding to pay for the
State Avenue, Grove Street to First Street and I16
th Street NE to 136
lh Street NE projects.
I
I
I
I
Attachment #1 page 3 of 3 Updated:06/20/2005
Recommended for Adoption:06/27/2005
6 YEAR SUMMARY
3,450 4,176 ,I 7,626
80 \
I .00320I-+-
I -r
,30 1 -+----190 .320
I
I -1---
300 -k=300'-
----
240 0+__240
I
250 °L 250
=1 -r-
50 0 I 50
I ~t--~_~'4,400,
Adopted Resolution No.__
IGMA-ST
---,
--'-~-T
GMA·$T
-f-r-
+
_FA-ST
------j-
tGMA-ST 1-__
~-+-
i,
240 I
YEARS 4 THROUGH 6
------t
ALL
ALL
ALL
-+----
YEAR 3
-+.
---=r::--+-t --+--
4,522 I----':::=::-j
CNICE
2006 - 2011 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN
(Thousands of Dollars)
YEAR 2
+
+--+----=t:L_.__CN/C~~320 ~:~~- -,----+-----.
1---='<04 '60J ~+GMA-ST ---t---_-'-If-__-II-+-+-_.---.-1-
~,++--[1----I----+---CN~E =r._~:~ER_~~-~=r '-r-L-
+.-t--+--t -+
+--1'-'-+--1--1------j--1--+---__.J.+---t -+---+----I~.,,---=-I
-I ----------+-----+----+--+---j-+---I-:-:-:----==-~
--!-----I-----I-----+--~+------I-
I --+---I~-=C=j-.-=i-~--=f~==1 1 -~
,
~!GMA-ST-'---
t---
.--L
-t---
70 !
YEAR 1
~---_.-
.Lm
PE/RW
ALL
,.4
----_t_
GROVE STREET /67TH AVENUE NE INTERSECTION
WIDEN EASTBOUND APPROACH TO THREE LANES r
I ---.----t,,
S2ND STREET HE I SUNNYSIDE BL vafNTERSECTIO
..""_......rNSTALL SIGNAL
3 CITY
5 CITY
6 CITY
I
8 CITY
4 CITY
7 CITY
SR 528 /47TH A VENUE NE INTERSECTION
INTERSECTION IMPROVEMENTS
3RD STREET /47TH AVENUE NE INTERSECTION
SIGNALIZE WITH ADDITIONAL CHANNELIZATION ---t---+--
STATE A VENUE I SR 528 INTERSECTION 14
1-+_-4INSTAll EASTBOUNDRIGHTTURN LANEASA CONDITION ",-'
OF DEVELOPMENT ----+-t--~_
GROVE STREET I ALDER A VENUE ~"1'2 :~:;'
I--_L._......SIGNALIZE INTERSECTION WITH PEDESTRIAN CROSSIN~_t~_--=1-----1----
I .
12,150
----1-
-t-
750
---,-
+G_MA-$T 100 {-
400 -f0THER?--1---+.-=r
I -,
--+-
I---4
CN
I---I---t---..---+--
"I
II
i -!,
I I-
t +-
+-
100+--o'-::G"MA-C:-_=ST=---t--:-=:-:-:-+
-~'_._-----
I 1900 O::TH~E::Rc:?,-_--11"":;';;;;;"'--'-J--l--j-----
--+--+--
----+-
---=PE/RW
---t
-+------t"-
-.-_-FA.~T~_-
_.~+----1"'=:':':':"_-1
-l+----
I
I
._---r+--
I-+
t--
I
-+-
PE
PE
-------1-..
CNICE
PE
4,~_,?STATE AVENUE:100THST,NE TO 116TH ST, NE 14.---t
WIDENTO 5 LANESECTIONWITH CURB,GUnER ANO._----..
SIDEWALK,AND REPLACEaUllCEDA OVERCRQSSING
J I-
11 CfTY
10 CfTY
I
12 CfTY SUNNYSIDE BOULEVARD,47TH A VE.NE TO 52NtJ S 17 4---------l-.__.
1GENERALPURPOSELANEEACHDIRECTIONWITH DUAL-----~~~
I--+__-,L._EFT_TU__RN ~E.BIKELANES,&CURB,G~DEW~~K _
J ,
ATTACHMENT #2
G:ISharedlEngineeringlTransportationlTiP_06_11106-011 CityTiP
page 1 of3
Updated:6/27/2005
Recommended for Adoption:06/28/2004
#REF!
49.800
433
8,400 9.000
1,920
49,300.-+-_---"-'=-1
o
6 YEAR SUMMARY
#REF!;
----.ool---+-----c-:-:-I
Adopted Resolution No.__
1------:--:-+----+------
5,700 6.000
I----+----!----
0 400 400
400 COUNTY?
0,400 400
400 ICOUN~_I
+
250 ICOUNTY?
0 2'0 2'0--
+----
0 900 900
YEARS 4 THROUGH 6
~.--+--
=~----I--
LL
ALL
ALL
PE
PE
ALL
CN
--t-~--j--=-l---+----I
--11-----+--+----------+-
I
+-----1-----
+----t-~-Wl,-1-__-t-t-__
2000 IOTHER?
I
I
YEAR 3
~=--C
I
--+----1-.
PE
PE
---1----.-+
_l~~A-ST
1800 'OTHER?'-H---~~----I-~~~~~~~~----+-----"=::.:'--~I----~--T__---t----~~
46000
1
1,0~OTHER?
___---1-.~_
30 :
i--
PE
1----1-----;---
YEAR 2
2006·2011 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN
(Thousands of Dollars)
---1-------1
TV
F~-_+:-='*-~--
,
-+--_--J l~l---I---tl---~_.--+----=1 I--+-----;--,---------+-==-f-~I--I--+---+-~I
-I ~---I----=J --+---1
TV ALL _I *_"280_(CO~NTV
- !
WIll
433 COUNTY
I
1379 iCOUN-
300 ~.-
YEAR 1
±
I
I
~==1===f---i-1-
ALL
ALL
12
1217
17
r","'-TB-B-TH~S~T~R£~ET""'£J<T~~E-N-S-IO-N--------+-16 ~_.
oz
~
14 WSDOT
13 CITY
19 COUNTY 51ST A VENUE NE 1152ND ST, NE INTERSECT/ON
!-_-+IN::S:.:T::A,Ll SIG_N_A_L _
17 COUNTY 122ND PLACE NE /51ST AVENUE NE fNTERSECTIO ~17~
~~TALL SIGNAL,WI~EN I~TERSECTION_LEGS,RAISE~.'..
PRO~~LEO~_51STAVENUE ~.~-~"
I '
24 COUNTY 152NDSTREETNE:STATEAVE".T067THAVE.NE 16 4
f_+;;.;...!'WIDEN TO A 3 LANE ROADWAY SECTION WITH IMPROVEMENTS
+-_-+A::T"ARTERJALINTERSECTIONS -- ..~f
Y1=!2
21
I
COUN7Y "57AVENUE NE,84TH ST.NET088TH ST. NE I 12J ,
t-_-f=Ec:IS"AND DESIGN FOR NEW ALIGNMENT FOR A 44 FOOT WIDE
I-+_-!ROADWAY SECTION WITH CURB,GUTIER AND SIDEWALKS
16 COUNTY 108TH STREET NE 1515T A VENUE NE INTERSECTfO
CONVERTTWO ADJACENTTHREE LEGGED---".--t_+__t-"IN"T::E"RS::E::C::T"I,ONS INTO A ROUNDABO'-U_T ~~--+--IE;1_----+--1_
22 WSOOT 4TH5TREET/fNTERSTATE5INTERCHANGE 11
1-_t-__fIN"C"R"EA---,S.=E",CAPACITY BY ADDITIONAL CHANNEllZAT;:IO:cN'---+~_1
AND POSSIBLY LARGER OVERPASS
20 COUNTY 67TH A VENUE NE 1100TH 5T. NE INTERSECTION
I_--,-_-!INSTALL SIGNAL
CONSTRUCT ROADWAY WITH CURB,GUTIER,AND SIDEWALK
1---!-__+(68THAVE."TO 74TH-I------r
"'NORTH MAR:SVlLLE INTERCHANGE -.~
THIS COST ESTIMATE INCLUDESPREPARINGAN ACCESS POINT--.--
DECISION REPORT, THEN CONSTRUCTING CONCEPT 2A
i 1__+
23 COWTY 88TH STREET NE:STATE AVE.TO67TH AVE.NE 16J
'CfTY WIDEN TO A 3 lANE ROADWAY SECTION WITH IMPROVEMENTS----1_+__fA:.:T.:.A::.R:.:T.=E:.:RIAlINTERSECTIONS
ATIACHMENT#2
G:ISharedlEnglneeringlTransporlationlTIP_06_11\06--011 City TIP page 2of3
Updated:6/27/2005
Recommended for Adoption:06/28/2004
2006·2011 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN
(Thousands of Dollars)
SUB TOT
I
I
6 YEAR SUMMARY
94,139 SUB TOT
1.61:...7+,_
12,5"3,,,3+-__~[G-MA-5T_
15,131 GMA·5T
GMA·ST
16,748
Adopted Resolution No.__
GMA-ST
:GMA-ST
JGMA-$T
6,621
4,761
YEARS 4 THROUGH 6
1,860
-4--
--'.
--"------t----+--+
YEAR 3
7,540 SUB TOT
SUB TOT
I
--~+-----
--c-tGMA-ST_
__+GMA-ST
:GMA-5T----:---
YEAR 2
(52)GMA-$T--->-;--
(1,JO",O'-!.)+-_IGMA-5T
_~65+__tART_ST-
-t-----
~~T_
5,349 SUB TOT
YEAR 1
--:---
_.-t--"
-+
-t
+
--+---
..~-)STATE.FEDERALAND OTHERFUNDS:
-t-
tWs,r;~WASH$.DEPTOF TRA'NSPO;r:;.nQN -
lSTP i FED.ROADSFUNDS;NCl HAZARD ELiM.-r"-+~-~-----.__.
OTHER?"UNDETERMINED
-t-r-r-~----.•----
ATTACHMENT #2
G:ISharedlEngineeringlTransportatlonlTiP_06_11106-011 City TIP page 30f3
Updated:6/27/2005
Recommended for Adoption:06128/2004
• Point Projects
I
I
,y-r
I
LJ _f-
1
Feet
2000 4000o
-Linear ProjectsoCity Limits
j
/'
,19'/
Tulalip
Reservation
City Clerk
NOTICE OF PUBLIC HEARING
MARYSVILLE CITY COUNCIL
NOTICEIS HEREBY GIVEN THAT THECITYOF MARYSVILLE WILL HOLDA
PUBLIC HEARING ON MONDAY,JUNE27,2005AT7:00P.M.TO CONSIDER
THE FOLLOWING:
A RESOLUTION OFTHECITYOF MARYSVILLE ADOPTING A
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(2006-2011)IN ACCORDANCE WITH RCW35.77-010.
THE HEARING WILLBEHELDINCITY HALL,COUNCIL CHAMBERS,1049
STATE AVENUE,MARYSVILLE,WASHINGTON.
ANY PERSON MAY APPEAR ATTHE HEARING AND BE HEARD IN SUPPORT
OF,ORIN POOSITION TO THIS PROPOSAL.ADDITIONAL INFORMATION
MAYBE OBTAINED AT THE MARYSVILLE CITY CLERK'S OFFICE,1049
STATE AVENUE,MARYSVILLE,WASHINGTON,98270,(360)363-8000.
CITYOF MARYSVILLE
GERRY BECKER,CITY CLERK
DATED JUNE ,2005
NOTICE DOESNOT REQUIRE PUBLICATION