HomeMy WebLinkAboutR-2185 - Adopting a Six-year Transportation improvement program (2007-2012)CITY OF MARYSVILLE
Marysville.Washington
RESOLUTION NO...:l1 g-S:-
A RESOLUTION OF THE CITY OF MARYSVILLE ADOPTING A SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2007-2012)
WHEREAS,the City Council of the City of Marysvill e,Washington,
pursuant to RCW 35.77.010,held a public hearing on Ju ly 10,2006 for the
purpose of revising and extending its Comprehensive Six -Year
Transportation Program;and
WHEREAS,the City Council has reviewed the current status of City
streets and has considered the testimony and exhibits presented at the
public hearing,and finds that the programs presented by the Public Works
Department are in the long -range best interests of the City;NOW,
THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF MARYSVILLE,
WASHINGTON AS FOLLOWS:
1.The Comprehensive Six-Year Transportation Improvement Program
(2007-2012)presented to the City Council,copies of which are on file
and open to public inspection at the office of the City Clerk,is hereby
approved and adopted in its entirety.
2.The Six-Year Transportation Improvement Program as presented
to the City Council,copies of which are on file and open to public
inspection at the office of the City Clerk,is hereby approved and
adopted in its entirety.
of
3.The City Clerk is hereby directed to file copies of said
Programs with the Secretary of Transportation.
PASSED by the City Council and APPROVED by the Mayor this JO-M
1'v-~,2006.
CITY OF MARYSVILLE
By~;!~!1
DENNIS KENDALL,Mayor
ATTEST:
Approved as to form:
day
1Mary~
WASH1NGTO~~-::
UPDATED 6/22/06,REVISED 7/10/06
2007-2012 SIX YEAR TRANSPORTATION PLAN
PROGRAM NARRATIVE
ITEM NO.1 47TH AVENUE NE SIDEWALKS: 7TH ST. TO 10TH ST.
Install curb, gutter and sidewalk at existing gaps in the vicinity of Liberty Elementary and
Marysville Middle Schools.
ITEM NO.2 STATE AVENUE SIDEWALK: 80TH ST. NE TO 88TH ST. NE
Install sidewalk on the west side of State Avenue adjacent to railroad.
ITEM NO.3 SR 528 I 47TH AVENUENE INTERSECTION
Reconstruction of intersection to provide additional east-west through lanes and longer turn-
pockets. Work involves installing new traffic signal, and increasing turn radii on all four
corners.
ITEM NO.4 3RD STREET I 47TH AVENUENE INTERSECTION
Signalize the existing four-way stop intersection,add turn pockets and through lanes, and
coordinate signal timing with 4
th Street/47'h Avenue intersection to improve traffic flow.
ITEM NO.5 ARTERIAL IMPROVEMENTS FOR TRANSPO COMP PLAN
Allows City staff the ability to credit traffic mitigation fees to developers for select arterial
road connections that do not directly benefit a particular land development action.
ITEM NO.6 STATE AVENUENE / SR 528 INTERSECTION
Install eastbound right turn lane. Likely will be dependent on the redevelopment of adjacent
property required to dedicate necessary right-of-way to make this improvement.
ITEM NO.7 GROVE STREET / ALDER AVENUESIGNAL
The project will signalize the intersection with pedestrian crossing.
ITEM NO. 8 STATE AVENUE: 116TH STREET NE TO 136TH STREET NE
Install additional 2 lanes, curb, gutter and sidewalk to the 3-lane roadway improvement
currently under construction for the ultimate 5-lane roadway section.
ITEM NO.9 STATE AVENUE: 136TH STREET NE TO 152ND STREET NE
The project will widen the existing 2-lane roadway to a 5-1aneroadway with curb, gutter, and
sidewalk.
Attachment #1 page 1of4 Updated:07/12/2006
Recommended for Adoption:07/10/2006
ITEM NO. 10 116TH STREET NE: INTERSTATE-5 TO STATE AVENUE
The project will install additional 2 lanes on the south side with curb, gutter, and sidewalk to
the 3-lane roadway section currently under construction,for the ultimate a 5-lane roadway
section.
ITEM NO. 11 SR 528: ALLEN CREEK BRIDGE TO 53RDAVENUENE
This project will rechannelize SR528 to four general purpose lanes and modify entrance to
Jennings Park. This is one of the last stages in order to provide a full 4/5 lane roadway section
from Interstate 5 to the eastern City limits.
ITEM NO. 12 STATE AVENUE: 100TH STREET NE TO 116TH STREET NE
This project will provide a 5 lane roadway section, add gutter, gutter and sidewalk, and
replace the Quilceda Creek culvert and embankment with a bridge.
ITEM NO. 13 SUNNYSIDE BOULEVARD:47TH AVE.NE TO 52
ND ST. NE
This project will add a minimum of one general purpose lane each direction with middle dual
left tum lane and tum pockets, bike lanes, and curb, gutter &sidewalk. The signalization of
the 52
nd Street intersection is included in this project.
ITEM NO. 14 INGRAHAM BOULEVARD:68TH AVE.NE TO 74TH DR. NE
Construct a new roadway alignment through the Grace Creek basin consisting of a minimum
of 2 lanes, curb, gutter and sidewalk. Coupled with developer roadway construction to the
east, this project will replace the 84
th Street NE corridor as the route between 6ih Avenue NE
and State Route 9.
ITEM NO. 15 156
TH STREET NE RAILROAD OVERCROSSING
A new bridge is proJ'0sed for the safe passage of traffic over the Burlington Northern - Santa
Fe Railroad at 156 Street NE. Since the at-grade railroad crossing has been deleted, this
project is needed for improved access in and out of the Lakewood Annexation area.
ITEM NO. 16 ANNUALSTREET OVERLAYPROGRAM
Miscellaneous locations determined and prioritized by existing pavement condition ratings.
ITEM NO. 17 88TH STREET NE: STATE AVENUETO 67TH AVENUENE
Proposed joint Snohomish County/Marysville project to widen the existing 2-lane road to a 3-
lane and/or 5-lane roadway with curb, gutter and sidewalks. Also provide capacity
improvements at arterial intersections.
ITEM NO. 18 SR 528(4TH STREET) /INTERSTATE 5 INTERCHANGE
Proposed joint Marysville/Washington State Department of Transportation project to increase
capacity by possibly adding through lanes and tum pockets, ramp improvements,and a larger
overpass.
Attachment #1 page2 of 4 Updated:07/12/2006
Recommended for Adoption:07/10/2006
ITEM NO. 19 122ND PLACE NE/ 51ST AVENUE NE INTERSECTION
This Snohomish County project will change the vertical profile of 51st Avenue to provide
adequate sight distance, install a signal, widen intersection legs, and install a new Quilceda
Creek cuIvert.
ITEM NO.20 67TH AVENUE:108THSTREET NETO 152ND STREET NE
Snohomish County proposes to reconstruct the roadbed and pavement of the existing 2-lane
roadway in conjunction with the Marysville Waterrnain Extension project.
ITEM NO.21 51ST AVENUE NE/152ND STREET NE INTERSECTION
Proposed Snohomish County project to install a traffic signal and possibly provide additional
channelization.
ITEM NO.22 67TH AVENUE NE/ 100THSTREET NE INTERSECTION
Proposed Snohomish County project to install a traffic signal, and possibly provide additional
channelization.
ITEM NO.23 51ST AVENUE NE: 84TH STREET NE TO 88TH STREET NE
Proposed Snohomish County project to construct a new roadway segment with curb, gutter
and sidewalks. Also include improvements to 80
th Street NE between State Avenue and 51
51
Avenue to accommodate increased traffic flows resulting from the 51st Avenue extension.
ITEM NO.24 SR531 LAKEWOOD SCHOOLS SIDEWALKS
The Washington State Department of Transportation will construct a sidewalk through a small
business district and adjacent to Lakewood schools on the south side of State Route 531
(In"d Street NE) to increase pedestrian safety.
ITEM NO.25 SR529EBEYSLOUGH BRIDGE REPLACEMENT
The Washington State Department of Transportation will replace the existing swing-span
bridge with new 4-lane fixed-span bridge.
ITEM NO.26 116
TH STREETIINTERSTATE 5 INTERCHANGE
The Tulalip Tribes are the lead agency to reconstruct the existing interchange into a single
point urban interchange.
ITEM NO.27 SR 531(l72ND ST. NE)IINTERSTATE5INTERCHANGE
Phase 2 of the Washington State Department of Transportation improvement project, adding
an eastbound to southbound loop ramp and other ramp improvements to the widened bridge.
ITEM NO.28 PARK-AND-RIDE LOTS
Community Transit is planning to construct two park-and-ride lots within or near the
Marysville Urban Growth Area. The northern lot is approximately 250 -350 stalls, and the
south lot is proposed to be 300-400 stalls.
Attachment #1 page 3 of 4 Updated:07/12/2006
Recommendedfor Adoption:07/10/2006
ITEM NO. 30 67TH AVENUE NE EXTENSION
Extend 67'h Avenue south of 44th Street NE for improved traffic safety and connectivity.
ITEM NO. 31 TRANSPORTATION ELEMENT UPDATE OF COMP PLAN
Develop a traffic model to project future traffic volumes, perform level of service analysis,
and develop capital improvement and financial plans.
page4 of 4 Updated: 07/12/2006
Recommendedfor Adoption: 07/10/2006
ITEM NO. 29 152ND STREET NE: STATE AVENUE TO 67TH AVENUE NE
Proposed joint Snohomish County/Marysville project to widen the existing 2-1ane road to a 3-
lane roadway with curb, gutter and sidewalks. Also provide capacity improvements at arterial
intersections
ITEM NO. 32 STATE AVENUE DEBT SERVICE
Yearly debt payments necessary to provide a portion of the local match funding to pay for the
State Avenue, Grove Street to First Street project.
Attachment #1
I
500
so
250
128
600
180
'00
tA,
o
OJ
-I
o
97
162
o
so-+-
,--
18'
6 YEAR SUMMARY
600 .
500
.00
Adopted Resolution No.__
GMA-ST
GMA·ST
!
250 DEVELOPER-- +---.~
I
50
-+
300
---1-
.~+-_.
YEARS 4 THROUGH 6
ALL
ALL
CN
GMA-ST
-,
YEAR 3
__t
100
. ----I,
;
~---.-t
~-.j'
+-
+
J
-i --
CN
GMA-5T
----,.GMA-ST
97 UNFUNDED
J 1"
-'"'1-.....,.-
\-
25
100
ill
CrUCE
CN
YEAR 2
2007 ·2012 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN
(Thousands of Dollars)
GMA·ST
GMA·ST
L
1
t
GMA-5T
GMA-ST
162 UNFUNDED
6
18
YEAR 1
t-
100
500
400
12 ,i.
"1"
17
16
~--,
PROJECT NAMEAND DESCRIPTION
•
i--r-__----------....,--1It528I..7TH AVENUE HE tM'ERSECTfON 14
INTERSECTIONIMPROVEMENTS INCLUDING SIGNALIZATlON
1 CtTY 7TH AVE.HE SIOEWAUC$:7TH ST.TO 10TH ST.
L_"",':.:NSTAU SIDEWALKAT EXISTINGGAPS
3 f1Y
2-CtTY AJFAVE.SIDEWAIX:50THST.NET088THST.NE 14
INSTAll POROUS PAVEMENT SIDEWALK ON WEST SIDE
5 CITY ARTERIAL IMPROVEMENTS FORTRANSPO CaMP PLAN 16
j
CREDITTRAFFICMIT.FEESFORARTERIAL CONNTECTIQNS
7 eTTY GROVE STREET I AUJER AVENUE 16 12
SIGNALIZEINTERseCTION WITH PEDESTRIAN CROSSING!-""""'"
,
6 rC::f1Y=:--i"'~A::TE~A::V'::.::'N:::U:-.~/:-SR~S::':::8~,NTE~R::S:::.':CT::,O~N-----'.--"1/
_~tNS~_ALl E~STBOU_N~RI.9H!.!U~N LANE AS A~<::~~rTlON +__
L_....OF DEVELOPMENT t -t-_..
oz
!!,
MAJOR WIDENING I LANE ADDITION PROJECTS 9,616 5,575 4,041 7,539 3,609 3,929 7,100 0 7,100 I 25,270 1'-"0 25,270 ~9,184 40,340 35,822,,
. 4 ,tTY JROSTREET/47TH AVENUE NE IHTFRSECTION
,,-_...SCIGNALIZE WITH ADOITIONAL CHANNELIZATION
•
•
SOO
1,500
2,750
22,568
a +
a
··-1
--l
a-.•1
".270 8,504
13,502 I 13,702--r--------
._+
o
500
f --
-i -----1----
-+-200---+-
1,500
4,234
2,150
--~~_..
-
---
f--
f-
GMA--5T
5,502 UNFUNDED
-f-
i .__
---
GMA·ST
19,768 UNFUNDED
--_.r
i
-t
+
a
a
,--
__I
i _.;.
,- j
t
....-~-"
--.'"".t
--,.
+--..
t t
..-1-
---.
---..----:
GMA·ST
o TIB
o STP
-'
-+.
-,
1
GMA-ST
6,000 UNFUNDED,
GMA-ST
1,100 UNFUNDED
-+---
r --.,.-
-,
a
a
_.---t-
;-
i
~I
--'-.-
~IALL
CN/CE
GMA·ST
729 TIB
600 STP
GMA-ST
---1
GMA-ST
GMA-ST
1,200 UNFUNDED
--~
--,
,-
T·_·
1.
-t
,-
i
a
o GMA.$T
1,400 UNFUNDED
500
2,000
1,109
...1.-.-
.
ALL
Uti ICNICE
GMA-ST
GMAoST r
All
.----1---...
-+-
__L
GMA-$T
600 UNFUNDED
-i
.--~--.\
750
o GMA·ST
SOD UNFUNDED
3,125 GMA·ST.-
__~__~1,897 TIB ~-F==--'
1,044 STP
--I
---_.,
1,500
------t
i.,
'00
---l-
-J
i
- j
~I
~..
~I
§.QUI
--"
MRRICNICE
ALL
ALL
I
4
4 .'
4
5 "
,-
.-
I 14
,
• 16 ,
I
SR 528:ALLEN CREEK TO 53m AVENUE NE
11STH ST. HE:1-5 TO STATE AVENUE
STATE AVENUE:100TH ST. NE TO 116THST.HE
_r--~~~~TRUCT~S~ERN2 LAN.ES F~~A FU~l 5_~NE~
ROADWAY SECTION
L...-
ROADWAY SECTiON WITH CURB, GUTTER AND SIDEWALK-'---_._-----------.
I ,
--Ii..'.,_~:'
.J-.__..,.-."]---,--..
14 4.8~"__
I-__I,W,--I.D,--E~TO5 LANE SE~TION Wn:!!~URB.GU~TTER AND 1 _ifP.;E:..__-,
SIDEWAlK,AND~CE aUI~CE~A O~~C~SI~__:__~f--
SUNNYSIDEBLVD_,47THAVE.NET052NDST.NE I 16 4 "';"-1------;
'--,~>,;..--
~~N.E_~ENERALPU~~E LANE _~~~DIRECTiON":'ITH ~~_~II-PE....~
,~TWO-WAY lEFT~~~LANE,ANE.CURBS.~~E~S AND S~E~AL,
+_-4WIDEN ON SOUTHERN PORTION TO PROVIDE A 5 LANE
RE·CHANNEUZE TO FOUR GENERAL PURPOSE LANES
-t--MODIFY ENTAANCE TO JE-NNINGS PARK -_.•
-'--.-_.-
8 CITY STATEAVE:115THST.NEro 116THST.NE
9 CTTY STATE AVENUE:IJ6THST.NETO 152NO ST.NE
~WiDEN TO.5 ~NES ROADWAY SECTlO~W~TH
CURB,GUnER,AND SIDEWALK
'--,
--"..--+.--,.-----------------;,-14 ~-~
10 CiTY
11 CiTY
!
13 CITY
12 Cf1Y
•
AITACHMENT•2
G;\Shared\Engineering\Transportatlon\TIP_07-12\City TIP pagelof4
Updated:6/2212006
Recommended for Adoption:07/10/2006 J
2007·2012 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN
(Thousands of Dollars)
6 YEAR SUMMARY
4,969o
,,
4,969 .
•. - _J.
t
+
Adopted Resolution No.__
t
GMA-ST3,455
YEARS 4 THROUGH 6
).m.
CN/CE
GMA-$T
YEAR 3
1,1141,1!~
CNICE
GMA-$T
YEAR 2
+
150
PE/RW
YEAR 1
250
PE
PROJECT NAME AND DESCRIPTION
14 efrY IJNGRAHAMBDULEVARD:65THAVENET074THDRI 16
CONSTRUCT.~OADWA~~ITH CURB,~UnER.AND ~~~'A4LK
·t---1IA-CROSS THE ALlEN CREEK TRIBUTARY BASIN.__~__.-----r----+
.cITY OF MAR
•
BRIDGES .'.-•ZOO --200 '.0'-350'.,~~:.:O -35~""-I 1,240'~0 1,240 ~.--I -3.312:::~-0 --·--3,312"200 -;4,902 5,102
15 CITY 156THSTREETNERAfLROADOVERCROSSING I 17
I-__+CO~TRUCTBRID~E OVER THE B,!RUNGT?N ~~THERN•
SANTA FE RAILROAD FOR ACCESS TO lAKEWOOD AREA~---..-_.----.----,.
6
PE
200
-~
GMA-$T
o UNFUNDED
-~
PE/RW
o GMA-ST
350 UNFUNDED IA:.:=LL::.-__.J
o GMA-ST
1,240 UNFUNDED
~"1
CN/CE
o GMA-ST
3,312 UNFUNDED
'00
-T
4,902 5,102
S"fREET OVERLAYS 265 265,~•.~0 '277'277·l.!lr I'~293 .,293 -0..I 879 .•~879 ,o·~"1,714 - 0 1,714
1,714o-,1,714
,
ART-ST~879
+
ALL
ART-ST293
CONST
--+
ART--5T
,
277 '
IlIZ
ALL
.,ART-ST
,
265
ALL
r---"-""''''-====~=::::7:':'---iI TBD~-7
"T
16 CITY ~NUAL STREET OVERLAYPROGRAM
MISCELLANEOUS LOCATIONS DETERMINED BYf--..--
PAVEMENT CONDITION
'----'
JOINT AGENCY PROJECTS-MARYSVILLE LEAD -700 200;.'",500 ~-",0 1.200 -". 0 --~I 1.200'~O'....3.600~:{~~..::~~~0 --T-3,600 -1"1 -0 I 50.410 ~$ijI;o'"¥-'j50,410.,-:;o't,~0 200.55.710 .55,910
17 CITYJ 38TH STREETNE:STATE AVE.T067THAVE.NE I 16·4
COUNTY WID~N TO A 3 ~ROADWAY S~CTlON ~1~H IMPROVEMENTS
AT ARTERIALINTERSECTlONS
-'--.
26,500
29,410
26,300
29.410o
<
200
23,400 UNFUNDED
13,505 UNFUNDED
13,505 COUNTYUNFUNQ Q
~-----1
~IPE
900 UNFUNDED ALL
900..:COU_~TY~UNO 0
1,800 UNFUNDED
URQI
PEJRW I800UNFUNDED
200 UNFUNDED
200 COUNTY UNFUN D
!QQI
300 UNFUNDED ~P~E .J
100 UNFUNDED ""PE::...__....J
100 COUNTY UNFUNO 0
200
--1
~IPE
PE
4,9
-,
11
ON
eTrYI lSR528 (4THSTREET)I INTERSTATE 5 INTERCHANGE I
W5DOT INCREASE CAPACITY BY ADDITIONAL CHANNELIZATI
lAND POSSIBLY LARGER OVERPASS
~,_.----~----~--
18•
OTHER AGENCY PROJECTS.:OTHER AGENCY LEAD 11,190 O.~~1.190 ,~O 19,492 0 19,492_~0 I .22,850 0 22,850 0 21,076 >f 0 21.076.0 0 74,608 37,908
20 COWrY 67THAVENUE:loaTH ST.NETO IS2ND ST.NE I 16
RECONSTRUCT THE ROADBED AND SURFACING OF THEf--.-----------1
...._-'.EXISTING 2-lANE ROAOSAY +_+_
.1...ill1
CNICE I
5.057
,-
4.201 4,201.~---..;.------
o 5.057
o
----'-,
--j -'-
.L
t ----
-',
J
-+
~--_.-
-t-.
500 COUNTY
~,~ICNICE
3,033:COUNTY
4,557 COUNTY
--"T~ICN/CE
3
'2
I
17'I19"COlJNTY 122ND PLACENEI 51STAVENUE NE INTERSECTION I
INSTAll SIGNAL, WIDEN INTERSECTiON LEGS. RAISE=PROFILE OF ~~T AVENUE -------.
24 CrTY ~.53JL.A.KEWOODSCHOOLSS'DfWAl.K I 14
CONSTRUCT SIDEWALK ON THE SOUTH SIDE OF 172ND ST.
- IN THE iMMEDIATE VI~Ir!.~~~~~WOOD Hll?~sc-oor.
23 couNTYj 51STAVENUENE:UTH ST.HErO eTH ST.HE I 17
-
EIS AND DESIGN FoR NEW ALIGNMENT FOR A 44 FOOT WIDE
----I ROADWAY SECTION WITH CURI3,GUTTER ~NO SIDEWALKS-------------
400
500
400
--
250
400
500
~-1---_
-,
o 400
o
o 250
o
.......--
--I..__
250 COUNTY?--._---.-._-
400 .COUNTY?
400 COUNTY?
,_._---+
ALL
PE
...-
--
500 WSDOT
__--I _
)-'
~ICN/CE
.,
_ _..1_
12 ~
,i:(\
12 ;)'
.~
i¥.')I
32!-
..~
-----",.
16
17-,
I
I
-,
22ICOlJNTYI67THAVENUENEI rOOTH ST.NE INTERSECTION
I IINSTALL SIGNAL
•
ATTACHMENT 112
G:\SharecftEngineerlng\Transportation\TIP_07-12\City TIP page 201 4
Updated:6122/2006
Recommended for Adoption:07/10/2006
27,100o27,100
6 YEAR SUMMARY
Adopted Resolution No.__
YEARS 4 THROUGH 6
10,OOO"WSDOT
2010-2012
DBLIG s 6 YR.PROJECT
OTHER FUNDS FUND SOURCE PHASE CITY FUNDS OTHER FUNDS FUND SOURCE CITY FUNDS OTHER FUNDS COST
YEAR 3
=CNICE15,600 WSQOT
20090BUG s
OTHER FUNDS FUND SOURCE PHASE CITY FUNDS
.._'§~~~
CNICE
YEAR 2
2007 - 2012 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN
(Thousands of Dollars)
r-soo WSOOT
."T-
YEAR 1
2008 DEllG
CITY FUNDS OTHER FUNDS FUND SOURCE & PHASE CITY FUNDS
____!500
PE!RW
9
PROJECT NAME AND DESCRIPTION
SR529 E8EY SlOUGH 8RIOGE REPLACEMENT 14
REPLACE EXISTING 2 LAND SWING SPAN BRIDGE WITH A--_...--------~
-1__.14 LAND FIXEO SPAN BRIDGE
c:iz
\!,
25 crrr•
27 WSDOTI Sf(531 (I 72NO ST.HE) I INTERSTATE 5 INTERCHANGE 11 4,8
TULAUP ~~~_~OF IMPROVEMENTS ADDING fB/58 ~~~,~~
RAMP AND OTHER RAMP IMPROVEMENTS TO WIDER BRIDGE
-1-......
'00
18,000
~---'
900
18,000
17,800 17,800
o
o
0;
--!---
13,650 ·CT
~.-t
6376
CNICE
n_~59
CNICE
2,850 CT
r-
1'---
10,000 WSDQT...1-_
724 .WSD~)T ___1JlJl!lR
CN/CE
-1-'
1,000 CT
r.,
..-t
'---1
,_000.
PE,RW
PE
,
500 'CTf •._._.
700 ,WSOOT
900 WSDOT
__._--I..
-----.;
PE
PE
PE
TBD
,
PARK.AND·RIOE LOTS T80
CONSTRUCT A PARK AND RIDE LOT IN THE NORTH 250-350
STAllS,THE OTHER IN THE SOUTH 300=400 sTALLs;------
28 CT
26 WSDOTI I 16TH STREET NE /INTERSTATE 5 fHTCRCHANGE 11 4,8
roLAUP UPGRADE THE EXISTING INTERCHANGE TO A SINGLE POINT----------._------
URBAN INTERCHANGE FOR INCREASED CAPACITY..._....._ . . _~..I
CO~!,~EH~NS"VEPLAN~~~~~~~a~'l1.)~~-,,-150 v.;-;~...150:l::•../",~~~,.O~""",,,,~-~t!~'~~:O~:';O;,"':.l~:--:'0 O~.'"~.-",_,~_~":ff:'\~~4uO~t:'-";";:-'~fJ.~J.-0;";"t{\T,~.¥01'......·~",I 0 -~,i0.!~_""'.0 :;';-'._..,150"~.~0 1,806 0
•,I
.JOI!:iT.AGENC'(>~RO.JECTS,,,,OTHER,AGENCY,,LEAD.~_._'.ff~0
0 GMA-ST ~~OO 0 GMA-ST 0 9,000 9,000
100·COUNTY?AU 1,000 :COUNTY?
600 UNFUNDED 7,000 UNFUNDED
.._----_.
L!J!JfI.500 SOO SOO 1,000-_.~.
ALL 500 COUNTY?
'--'~1
,,.'___·"-"~·1·'"'"',,,...~..-."".,,.."_.-.'''","---;........"'"
300 0 GMA·ST .70 0.
PE 100 COUNTY?PE
200 UNFUNDED
-.-i
-.--r4
TBD
-1 - _ ..
30 COUNTY 61th AVENUE HE EXTENSION TBD
CITY ELIMINATE 90-DEGREE TURN;NORTH-SOUTH CONNECTIVITY
29 COUNTY 152ND STREETNE:STATE AVE.TO 67TH AVE. NE 16 :
CITY WIDEN TO A 3 LANE ROADWAY SECTiON WITH IMPROVEMENTS-- -._..--_.._..--
AT ARTERIAL INTERSECTiONS
•31 CITY TRANSPORTATION ELEMENTUPDATE
TRAFFIC MODELING,ANALYSIS,AND CtP PLAN
14
.0
4
PE
150 GMA·ST
--;-l--
lS0 o lS0
32S~ATEAVENUE om SERVICE 14 4
138 GMA-ST 138
L
GMA-ST 138 GMA·ST 414
I
GMA-ST 82'o 828
•
ATTACHMENT #2
G:\Shared\Engineering\Transportation\TIP_07·12\City TIP page 3 014
Updated:612212006
Recommended for Adoption:07/10/2006
•
_JSTATE.FEDERAL AND UNFUNDEDFUNDS:L
YEAR 1
2007·2012 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN
(Thousands of Dollars)
YEAR 2 YEAR 3 YEARS 4 THROUGH 6
.~-
'--
Adopted Rnolution No.__
6 YEAR SUMMARY
+----
WSDOT WASH.ST. DEPT OF TRANSPORTATION~ST~'yEO.RO~S FUNDS~NCl H~RD ELI~:_
UNFUNOI CITY UNDETERMINED
---TIS ----"-TAANSPORTATIONIMPROVEMENT BOARD-I-._..._~._
,COU~;SNOHOM~SH CO~"!.TY
COUNTy'SNOHOMISH COUNTY,UNFUNDED_..-~~.--. .
CT COMMUNITYTRANSIT --+
o WSOOT
o STP
72.487 UNFUNDED
OTIS
~,5~O _COUNry
.~3.505.COu.~ry~NF EO
'!.~,650 ~CT
+--
39,924 _W~.o2T
1,644 STP
90,036 UNFUNDED
2,62~JIB
12.008_COUNTY
14.505 COUNTYUNF
18,000 CT
•
•
~CITY FUNDS:
Gf.lA·ST PROJECTED GROWTH MANAGEMENT STREETS REVENUES
+----.-
GROWTH MANAGEMENT STREET FUND DEMAND
ANNUAL DEFICIT OR SURPLUS
-ESTIMATED cARRYOVER SURPLUS OR DEFICIT
FROM PREVIOUS YEAR,
,1."0TAl ESTIMATED ANNUAL SURPLUS OR OEFIC.!!
ART·ST ARTERIAL STREET FUND
~"~
_I
5,250
4,219
,1,O~1 •
{7.82QL
J8.78~L
879
5,0'81 -
88542 SUB TOT
"GMA·ST
GMA·ST
.GMA-ST
.GMA·ST
.~MA·ST
ART·ST
SUB TOT
93,640
11,750
17,130
1,714
1',844
,.
178,743 SUB TOT
GMA-5T
GMA-ST
GMA·ST
,GMA-ST
"G~~~T
ART·ST
SUB TOT
$197,587 RAND TOT
ATIACHMENT#2
G:\Shared\Engineerlng\Transportation\TIP_07-12\Clty TIP page 4 014
Updated:612212006
Recommended for Adoption:07/10/2006
1\••<"'.
''-~.
'"\
l...
!
'.
\
\-,'\,.
'.
/
-,
\
i,
\\-,
i
i
i
!
\
,
\.
".
~
l>I ,I
'.
t,-~'r
'-\\
"
\
i '.'\'"
\
~>-'!
J
/
2500
\Attachment #3
\
\.
'.
\.
~\'-
'.
\\
o
City of Marysville
2007-2012 Six Year
Transportation
Improvement Plan
o Point Projects
- Linear ProjectsoCity Limits
...._.;:::..\.'
"'\\
(
._.J
\'1 \~\\
./.._.-.\".\.4f ......I
"\.-_.-/'\._,,\'t
'.'\
/-
j
i
..~._...j /
!21 ,/"
It-
)
·.i~.~:-···
_.......i._•
J,!
!
"
J
\
i '-~,>,!r~
f {\,.\
\.
'.r
(,
/
)
'.
j
<
"
.\,
"
_.i -"
Tulal/p
Reservation
\\
".
......._l...-L....
••,J-"-..'
•
•
•
1Mar"s~YWASHINGTO~P \/
Office of City Clerk
Gerry Becker
1049 State Avenue
Marysville,WA 98270
Phone:360-363-8000
Fax:360-651-5033
ci.marysville.wa.us
July 12,2006
Mr.Douglas D.MacDonald
Secretary of Transportation
Washington State Department of Transportation
PO Box 47316
Olympia WA 98504-7316
Dear Mr.MacDonald:
Enclosed please find a copy of Resolution No.2185 of the City of Marysville adopting a Six-
Year Transportation Improvement Program (2007-2012)for the City of Marysville.Please
note that this resolution and 6-year T.I.P.were adopted by the Marysville City Council on
July 10,2006.
Should you have any questions regarding the above,please do not hesitate to contact City
Engineer Kevin Nielsen at 360-363-8100.
Sincerely,
GBIII
Enclosl,Jre
cc: Kevin Nielsen,City Engineer