HomeMy WebLinkAboutR-2308 - Adopting a Six-Year Transportation improvement program (2012-2017)CITY OF MARYSVILLE
Marysville,Washington
RESOLUTION NO.J-"30~
A RESOLUTION OF THE CITY OF MARYSVILLE ADOPTING A SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2012-2017)
WHEREAS,the City Council of the City of Marysville,Washington,pursuant to RCW
35.77.010,held a public hearing on July 11,2011 for the purpose of revising and extending its
Comprehensive Six-Year Transportation Program;and
WHEREAS,the City Council has reviewed the current status of City streets and has
considered the testimony and exhibits presented at the public hearing,and finds that the programs
presented by the Public Works Department are in the long-range best interests of the City;NOW,
THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF MARYSVILLE,
WASHINGTON AS FOLLOWS:
1.The Comprehensive Six-Year Transportation Improvement Program (2012-2017)
presented to the City Council,copies of which are on file and open to public inspection at the office
of the City Clerk,is hereby approved and adopted in its entirety.
2.The City is hereby directed to file copies of said Programs with the Secretary of
Transportation.
PASSED by the City Council and APPROVED by the Mayor this -.lL day of~,2011.
CITY OF MARYSVILLE
ATTEST:
By4!~-
Apri1Brien:Deputy City Clerk
App"""'""to Imm'Q
B~!c..0-JA..
GRANT K.WEED,City Attorney
2012-2017 SIX YEAR TRANSPORTATION PLAN
PROGRAM NARRATIVE
ITEM NO.1 80'h ST NE SIDEWALK:47 TH AVE NE TO 51 ST AVE NE
Construct curb,gutter,sidewalk and drainage facilities along the south side of 80th St.NE
ITEM NO.2 531\D AVENUE NE:SR 528 TO SUNNYSIDE BLVD
Construct bicycle and pedestrian facilities.
ITEM NO.3 STATE AVENUE /SR 528 INTERSECTION
Change SE and SW radii as a condition of development of adjacent property to dedicate
necessary right-of-way to make this improvement.
ITEM NO.4 53 rd AVENUE NE /SR 528 INTERSECTION
Construct a new traffic signal at the intersection.
ITEM NO.5 48 TH DRIVE NE /100TH STREET NE INTERSECTION
Construct turn lane and a new traffic signal at the intersection.
ITEM NO.6 116TH ST NE /STATE AVENUE
Construct turn lane(s),modify traffic signal,add a second westbound thru lane and extend the
eastbound right-turn lane.
ITEM NO.7 SR 528 /DELT A AVENUE PEDESTRIAN SIGNAL
Construct pedestrian signal at the intersection ofSR 528 and Delta Avenue.
ITEM NO.8 STATE AVENUE /88TH ST NE INTERSECTION
Add thru lanes and turn lanes.Modify traffic signal.
ITEM NO.9 STATE AVENUE /84TH ST NE INTERSECTION
Construct rail crossing and install a traffic signal.Close adjacent rail crossings.
ITEM NO.10 51 ST AVENUE NE /152 ND STREET NE INTERSECTION
Install a traffic signal and possibly provide additional channelization.
ITEM NO.11 INTELLIGENT TRANSPORTAnON SYSTEM
Implement Intelligent Transportation Systems Program to improve signal coordination and
management,roadway monitoring and response,ITS device management,and data collection.
System to include communications equipment,traffic signal equipment,video surveillance
and monitoring,video detection,and satellite traffic management center.
page 1 of 4 Updated:0612912011
Recommended for adoplion;07111/2011
ITEM NO.12 STATE AVENUE:116TH STREET NE TO 136TH STREET NE
Install additional 2 lanes,curb,gutter and sidewalk to the existing 3"lane roadway for the
ultimate 5"lane roadway section.
ITEM NO.13 STATE AVENUE:100TH STREET NE TO 116TH STREET NE
This project will provide a 5 lane roadway section with curb,gutter and sidewalk,and replace
the Quilceda Creek culvert and embankment.
ITEM NO.14 SUNNYSIDE BOULEVARD:47 TH AVE.NE TO 52 NO ST.NE
This existing two-lane roadway is proposed for expansion to a five-lane roadway section in a
phased manner.New traffic signals at 53'd Ave NE and 52,d St NE
ITEM NO.15 40'h STREET NE:SUNNYSIDE BOULEVARD NE TO SR 9
Improvements consistin~of one or two general pUJ;pose lane each direction and shoulder.
The 73'd to 87'h and 87'to SR 9 segments are proposed new aligrunents.This creates the
fourth leg to the SR 9 /SR 92 Intersection
ITEM NO.16 152"d STREET NE:STATE AVE.TO 43 RO VIC.
Widen existing roadway from two lanes to three,install curb,gutter and sidewalk.
ITEM NO.17 51 ST AVENUE NE:160TH ST NE TO ARLINGTON CITY LIMITS
Widen existing roadway from two lanes to 5 lanes,install curb,gutter and sidewalk,including
bicycle and pedestrian facilities.
ITEM NO.18 88 TH STREET NE:QUIL CEDA BRIDGE TO 1-5
Construct westbound right turn drop lane on 88 th St NE from the west end of Quil Ceda
bridge to Interstate 5.
ITEM NO.19 SR 528 /1-5 INTERCHANGE ADDITIONAL LANES
Construct additional eastbolUld and westbound lanes along SR 528 at the interchange with
Interstate 5.Add turn lanes.
ITEM NO.20 156TH STREET NE:STATE AVE.TO 51 ST AVE.VIC.
Provide new east-west 5-lane connection between State Avenue to the west and 51 51 Avenue
to the east,complete with curb,gutter,and sidewalk.
ITEM NO.21 FIRST STREET BYPASS
Preliminary study to explore possible alignment options and feasibility of creating a "bypass"
connection hetween First Street and 61 51 Street NE/Sunnyside Boulevard.Establish an
alignment and determine ROW needs.
page 2 of4 Updated:06/29/2011
Recommended for adoption;07/11/2011
ITEM NO.22 40 TH ST NE/83 rd AVE NE/35 1h ST NE:TO SR 9
Construct a 3-lane principal arterial alignment along 40lh and 5-lane principal arterial
alignment along 87 1h ,and 35'h._connecting to new west leg of SR9/SR 92 intersection.
ITEM NO.23 27 TH AVE EXTENSION FROM 156TH ST NE TO 166TH ST NE
Construct a new roadway alignment to connect 156 1h St NE to 166 1h St NE.
ITEM NO.24 ARTERIAL IMPROVEMENTS FOR TRANS PO COMP PLAN
Credit select,applicable traffic mitigation fees for portions of arterial improvements tbat do
not directly access private development land uses.
ITEM NO.25 LAKEWOOD TRIANGLE ACCESS /156TH ST
OVERCROSSING
Construct 1-5 overcrossing at 1561h St.NE and connecting roadway between Twin Lakes
Boulevard and State Avenue.
ITEM NO.26 ANNUAL PAVEMENT PRESERVATION PROGRAM
Pavement preservation and restoration at various locations determined by pavement condition
rating prioritization.Preservation methods include overlays,chip seals,etc ...
ITEM NO.27 881h STREET NE:STATE AVENUE TO 67TH AVENUE NE
Proposed joint Snohomish CountylMarysville project to widen the existing 2-laneroad to a 5·
lane roadway with curb,gutter and sidewalks.Also provide capacity improvements at arterial
intersections.Interim improvements may build out to a 3-lane section until the full 5·lane
section is necessary.
ITEM NO.28 152 ND STREET NE:43RD AVE VIC TO 67 TH AVENUE NE
Proposed joint Snohomish CountylMarysville project to widen the existing 2-lane road to a 3-
lane roadway with curb,gutter and sidewalks.Also provide capacity improvements at arterial
intersections.
ITEM NO.29 51 ST AVENUE NE:84 TH STRE:.ET NE TO 88 TH STREET NE
A new 3-lane alignment between 84,h St.NE and 88 1h St.NE including bike lanes and
sidewalk to connect the missing link gap on this arterial roadway.
ITEM NO.30 SR 529 /INTERSTATE 5 INTERCHANGE EXPANSION
Construct new northbound off-ramp from Interstate 5 to SR 529 and new southbound on-
ramps from SR 529 to Interstate 5 completing a full interchange at this location.
page 3 of 4 Updated:0612912011
Recommended for adoption;07/11/2011
ITEM NO.31 1 16TH STREET NE /INTERSTATE 5 INTERCHANGE
Tulalip Tribes project to upgrade the existing diamond interchange to a single point urban
interchange.
ITEM NO.32 88TH STREET NE /INTERSTATE 5 INTERCHANGE
Tulalip Tribes project to upgrade the eXisting diamond interchange to a single point urhan
interchange.
ITEM NO.33 SR 529 EBEY SLOUGH BRIDGE REPLACEMENT
A Washington State Department of Transportation (WSDOT)project that will replace the
existing 2"lane swing span bridge witb a 4"lane fixed span bridge.
ITEM NO.34 SR 531 (lnNO ST.NE):43 RO AVENUE NE TO SR 9
A WSDOT project widening existing 2-lane roadway to 4-lanes with a two-way middle left
turn lane at applicable locations.
ITEM NO.35 SR 9:LUNDEEN PARKWAY TO SR 92 (PHASE 2)
This second phase of the project will make provisions for a future fourth leg to the
intersection at SR 9 &SR 92.To accommodate this widening improvements will be made
along SR 92 and.portions of SR 9 at the intersection.
ITEMS NO.36 SR 9 /SR 528 INTERSECTION
WSDOT improvement project to add an east leg to the intersection,add right-turn and left-
turn lanes,and upgrade signals and lighting.
ITEMS NO.37 SR 9/84TH STREET NE INTERSECTION
WSDOT improvement project to add turn lanes,upgrade signals and lighting.
ITEMS NO.38 STATE AVENUE DEBT SERVICE
Yearly deht payments necessary to provide a portion of the local match funding to pay for the
State Avenue,Grove Street to First Street prOject.
ITEMS NO.39 ADDITIONAL DEBT SERVICE'
$8,000,000 bond with a 20 year term at 4%interest.
ITEMS NO.40 LAKEWOOD TRIANGLE ACCESS DEBT SERVICE
Yearly debt payments necessary to provide a portion of the funding to pay for the Lakewood
Triangle Access Design.$1,000,000 bond with a 5 year term at 0.5%interest.
page 4 of 4 Updated:06/2912011
Recommended for adoption;07/11/2011
35
;,,
!£
hl~~f1.,,,,,,
,,,
YCRIiARONW
l
1
~
City of Marysville
S'X yE4"i;
7 T~.:~".,'>,::'7''I'''',r;"'T 4_."..",.,T1[)-f.,.}
1-~,!i"«~C\E··"'!Et-,/T ;>t,4"'J
·--,~
2013 OOUG&
pHASE CITY FUNDS OTHER FUNDS FUNDSOURCE
2014 OBUG &
PHASE CITY FUNDS OTHER FUNDS FUNDSOURCE
'",
CITY FUNDS OTHER FUNDS 6 YR.PROJECT COST
2015·2017
OBUG&PHASE CITY FUNDS OTHER FUNDS FUND SOURCE
254
-"'ICH{CE ..,t-
,,'"PElRW---
2012 OBUG&
PHAS'O'CITY FUNDS OTH'ORFUNDS FUND SOURCE
CG?SlW32?
PROJECT NAME AND DESCRIPTION
80lh SI.Nf SIDEWAlK:47TH AVf NE TO 51ST AVE NE
INSTALL SIDEWALK ON SOUTH SIDE OF ROADWAY
...
f CITY
~I
~-CITY
I'
f--
53RD AVE NE:SR 528 TO SUNNYSIDE 8WD
CONSTRUCT BICYCLE AND PEDESTRIAN FACILITIES
32P ----f----------------505~,us
3 =STATE AVfNUf {SR 5281mERSfOlON
CHANGE SEAND SW RADII AS A CONDITION OF DEVELOPMENTS
12:?- -CPT -----
25D DEVELOPER
I --25i)f------".
4=53RD AVENUf Nf {SR 528 ImERSfCTlON
CONSTRUCT A NEW TRAFFIC SIGNAL AT THE INTERSECTION ~-----I--PE
--
o 315
----1----
,,,
5 ""
6 "'"'
48TH DR NE {loom ST lmERSfCnON
CONSTRUCT A NEW TRAFFIC SIGNAL ATTHE INTERSECTION
-I-
116m ST Nf {STATE AVE ImERSfCTlON
CONSTRUCT TURN lANE{S),MODIFY TRAFFIC SIGNAL,ADD A SECOND
WESTBOUND THRU LANE AND EXTEND THE EASTBOUND RIGHT-TURN lANE
12 :?CGPSlW
CGPSTW
1--
PElRW
...:--------GMA-ST
300 UNFUNDED
----
'"CNICE 50'
IGMA-sT
AU.
465 UNFUNDED
IGMA-ST
700 UNFUNDED
'"
--0 -----1,500
'"
1,500
'"
'"
-
o ----2,213-
'"
o 900
--
500 UNFUNDED
t
---
2,213 DEVELO?ER
1---
--
----
'"CNICE
-
325 UNFUNDED
--
-
iC3:~I,;::>:,j::;(:10!;!I>:;::'::~<:/:<::
CNICE ---"'I
ill
75 UNFUNDED PElRW I
1-
-
PE
PE
-----
CGPSTW---
CGPSTW
12?
14 12 ,p
I
f--
CPT _F+-----'----+-'----+-
STATE AVE {84TH ST NE ImERSfCTION
CONSTRUCT RAIL CROSSING AND INSTALL A TRAFFIC SIGNAL
SR 5281 DELTA AVE PEDESTRIAN SIGNAL
CONSTRUCT A PEDESTRIAN SIGNALATTHE INTERSECTION
I
STATE AVE I 88TH STNE ImERSECTION
ADD THRU AND TURN lANES MODIFY TRAFFIC SIGNAL
9 ,~
6 =
7 ,~
400 40010=
11 CITY
51ST AVE HE I 152ND ST Nf lmERSEOION
INSTALL A TRAFFIC SIGNAL AND POSSIBLY PROVIDE ADDITIONAL
CHANNELIZATION
ImEWGENTTRANSPOKTATION SYSTEM
IMPLEMENT ITS PROGRAM TO IMPROVE SIGNAL COORDINATION AND
MANAGEMENT
12P
'"CPT
50 'UNFUNDED
1----
--I
-I +50 UNFUNDED ALL
- -
..
I
------
50 UNFUNDED
AU.
'"
----
150 UNFUNDED
--
,
--1---
,,,,,,
-
12 CITY
14 =
STATE AVE:116TH ST.NEto 136TH ST.NE
CONSTRUCT EASTERN 2 lANES FOR A FULL 5 lANE
ROADWAYSECIION
STATEAVENI)E:1GOTH ST.HE TO 116TH ST.HE
WIDEN TO 5 LANE SECTION WITH CURB,GUTTER AND
SIDEWALK,AND REPLACE QUILCEDA OVERCROSSING
SUNNYSIDE BLYD.:47TH AVE.HE TO 52ND ST.NE
TWO GENERAL PURPOSE lANES IN EACH DIRECTION WITHA
TWO-WAY LEFT TURN lANE,AND CURB,GUTTER AND SIDEWALK
14 4.F
"
CGPSlW
--
CGPSTW
L1!lQ
PElRW
I
'::':::lJJ2!!.
1,400 UNFUNDED CNICE
-
PE
PE
GMA'$_T'-
3,000 UNFUNDED
250 UNFUNDED
,-----
illQQ 1--,
AU.
Ale
----
17,000 UNFUNDED
13,000
,
,
4,400
-
--19,000
13,250
4,400
-
19,000
13,250
4,000
1,900
4,250
11,440
1,900
4,000
-~---
1--------
o 4,250
,
,-----
-1--
GMA-ST
4,000 DEVELOPER
4,250 UNFUNDED
IGMA-ST
- --1~_~OO_F_-=--=.:::~
---AU.
-----
GMA-$T _____
4,000 1 _
f---'"
-
--1M.,'-'
'"
--
I
\GMA-ST '....'
AU.
- -
-
--f----
CGP5TW
CGPSTW
4 P
1,4P
14 4·P
"
51ST AVENUE HE:150TH ST HE TO ARLINGTON ClTYLIMrTS 16
WIDEN EXISTING ROADWAY FROM TWO lANES TO 5 lANES WITH CURB,GUTTER,
SIDEWALK,BICYCLE AND PEDESTRIAN FACILITIES
88TH SfflEET He QU/L CEDA BRIDGE TO f.5
CO_N_~TRUC!_\'\PEST~OUND RIGHTTURN ~~OP lANE o~_~aTH ST_NE FROM~~..1 _
END OF QUIL CEDA BRIDGE TO INTERSTATE 5 __~__+-'__-++-__+_
I
152ND STREET HE:STATE AVE.TO 4JRD VIC.
WIDEN FROM 2 TO 3 lANES
4fJTHSTREETHE:SUHNYSIDEBOULEVARDHE TOSR9 16 1,4'P '!GPSTW .
IMPROVEMENTS CONSISTING OF ONE OR TWO GENERAL PURPOSE lANE EACH
DIRECTION AN-6sHOULOER TO PROVIDE AATI:~IAL CONNECTiViiY -=('-~--=:j--::::::::-:::::j:::::::::-l-::::---=
17 CITY
16 =
16 =
15 =
ATTACHMENT#2
S:\PublicWorksI5haredlEngineeringIProlectsITransportationITransportation\TIP_12-17\2012 •2017 TIP
*KEY:PE Preliminary (Design)Engineering,RW.Rlght-of.Way Acq.,CN Construction,CE Construction Engineering
page1of3
Updated:0612912011
Recommended for Adoption:7/11/11