Loading...
HomeMy WebLinkAboutR-2308 - Adopting a Six-Year Transportation improvement program (2012-2017)CITY OF MARYSVILLE Marysville,Washington RESOLUTION NO.J-"30~ A RESOLUTION OF THE CITY OF MARYSVILLE ADOPTING A SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2012-2017) WHEREAS,the City Council of the City of Marysville,Washington,pursuant to RCW 35.77.010,held a public hearing on July 11,2011 for the purpose of revising and extending its Comprehensive Six-Year Transportation Program;and WHEREAS,the City Council has reviewed the current status of City streets and has considered the testimony and exhibits presented at the public hearing,and finds that the programs presented by the Public Works Department are in the long-range best interests of the City;NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF MARYSVILLE, WASHINGTON AS FOLLOWS: 1.The Comprehensive Six-Year Transportation Improvement Program (2012-2017) presented to the City Council,copies of which are on file and open to public inspection at the office of the City Clerk,is hereby approved and adopted in its entirety. 2.The City is hereby directed to file copies of said Programs with the Secretary of Transportation. PASSED by the City Council and APPROVED by the Mayor this -.lL day of~,2011. CITY OF MARYSVILLE ATTEST: By4!~- Apri1Brien:Deputy City Clerk App"""'""to Imm'Q B~!c..0-JA.. GRANT K.WEED,City Attorney 2012-2017 SIX YEAR TRANSPORTATION PLAN PROGRAM NARRATIVE ITEM NO.1 80'h ST NE SIDEWALK:47 TH AVE NE TO 51 ST AVE NE Construct curb,gutter,sidewalk and drainage facilities along the south side of 80th St.NE ITEM NO.2 531\D AVENUE NE:SR 528 TO SUNNYSIDE BLVD Construct bicycle and pedestrian facilities. ITEM NO.3 STATE AVENUE /SR 528 INTERSECTION Change SE and SW radii as a condition of development of adjacent property to dedicate necessary right-of-way to make this improvement. ITEM NO.4 53 rd AVENUE NE /SR 528 INTERSECTION Construct a new traffic signal at the intersection. ITEM NO.5 48 TH DRIVE NE /100TH STREET NE INTERSECTION Construct turn lane and a new traffic signal at the intersection. ITEM NO.6 116TH ST NE /STATE AVENUE Construct turn lane(s),modify traffic signal,add a second westbound thru lane and extend the eastbound right-turn lane. ITEM NO.7 SR 528 /DELT A AVENUE PEDESTRIAN SIGNAL Construct pedestrian signal at the intersection ofSR 528 and Delta Avenue. ITEM NO.8 STATE AVENUE /88TH ST NE INTERSECTION Add thru lanes and turn lanes.Modify traffic signal. ITEM NO.9 STATE AVENUE /84TH ST NE INTERSECTION Construct rail crossing and install a traffic signal.Close adjacent rail crossings. ITEM NO.10 51 ST AVENUE NE /152 ND STREET NE INTERSECTION Install a traffic signal and possibly provide additional channelization. ITEM NO.11 INTELLIGENT TRANSPORTAnON SYSTEM Implement Intelligent Transportation Systems Program to improve signal coordination and management,roadway monitoring and response,ITS device management,and data collection. System to include communications equipment,traffic signal equipment,video surveillance and monitoring,video detection,and satellite traffic management center. page 1 of 4 Updated:0612912011 Recommended for adoplion;07111/2011 ITEM NO.12 STATE AVENUE:116TH STREET NE TO 136TH STREET NE Install additional 2 lanes,curb,gutter and sidewalk to the existing 3"lane roadway for the ultimate 5"lane roadway section. ITEM NO.13 STATE AVENUE:100TH STREET NE TO 116TH STREET NE This project will provide a 5 lane roadway section with curb,gutter and sidewalk,and replace the Quilceda Creek culvert and embankment. ITEM NO.14 SUNNYSIDE BOULEVARD:47 TH AVE.NE TO 52 NO ST.NE This existing two-lane roadway is proposed for expansion to a five-lane roadway section in a phased manner.New traffic signals at 53'd Ave NE and 52,d St NE ITEM NO.15 40'h STREET NE:SUNNYSIDE BOULEVARD NE TO SR 9 Improvements consistin~of one or two general pUJ;pose lane each direction and shoulder. The 73'd to 87'h and 87'to SR 9 segments are proposed new aligrunents.This creates the fourth leg to the SR 9 /SR 92 Intersection ITEM NO.16 152"d STREET NE:STATE AVE.TO 43 RO VIC. Widen existing roadway from two lanes to three,install curb,gutter and sidewalk. ITEM NO.17 51 ST AVENUE NE:160TH ST NE TO ARLINGTON CITY LIMITS Widen existing roadway from two lanes to 5 lanes,install curb,gutter and sidewalk,including bicycle and pedestrian facilities. ITEM NO.18 88 TH STREET NE:QUIL CEDA BRIDGE TO 1-5 Construct westbound right turn drop lane on 88 th St NE from the west end of Quil Ceda bridge to Interstate 5. ITEM NO.19 SR 528 /1-5 INTERCHANGE ADDITIONAL LANES Construct additional eastbolUld and westbound lanes along SR 528 at the interchange with Interstate 5.Add turn lanes. ITEM NO.20 156TH STREET NE:STATE AVE.TO 51 ST AVE.VIC. Provide new east-west 5-lane connection between State Avenue to the west and 51 51 Avenue to the east,complete with curb,gutter,and sidewalk. ITEM NO.21 FIRST STREET BYPASS Preliminary study to explore possible alignment options and feasibility of creating a "bypass" connection hetween First Street and 61 51 Street NE/Sunnyside Boulevard.Establish an alignment and determine ROW needs. page 2 of4 Updated:06/29/2011 Recommended for adoption;07/11/2011 ITEM NO.22 40 TH ST NE/83 rd AVE NE/35 1h ST NE:TO SR 9 Construct a 3-lane principal arterial alignment along 40lh and 5-lane principal arterial alignment along 87 1h ,and 35'h._connecting to new west leg of SR9/SR 92 intersection. ITEM NO.23 27 TH AVE EXTENSION FROM 156TH ST NE TO 166TH ST NE Construct a new roadway alignment to connect 156 1h St NE to 166 1h St NE. ITEM NO.24 ARTERIAL IMPROVEMENTS FOR TRANS PO COMP PLAN Credit select,applicable traffic mitigation fees for portions of arterial improvements tbat do not directly access private development land uses. ITEM NO.25 LAKEWOOD TRIANGLE ACCESS /156TH ST OVERCROSSING Construct 1-5 overcrossing at 1561h St.NE and connecting roadway between Twin Lakes Boulevard and State Avenue. ITEM NO.26 ANNUAL PAVEMENT PRESERVATION PROGRAM Pavement preservation and restoration at various locations determined by pavement condition rating prioritization.Preservation methods include overlays,chip seals,etc ... ITEM NO.27 881h STREET NE:STATE AVENUE TO 67TH AVENUE NE Proposed joint Snohomish CountylMarysville project to widen the existing 2-laneroad to a 5· lane roadway with curb,gutter and sidewalks.Also provide capacity improvements at arterial intersections.Interim improvements may build out to a 3-lane section until the full 5·lane section is necessary. ITEM NO.28 152 ND STREET NE:43RD AVE VIC TO 67 TH AVENUE NE Proposed joint Snohomish CountylMarysville project to widen the existing 2-lane road to a 3- lane roadway with curb,gutter and sidewalks.Also provide capacity improvements at arterial intersections. ITEM NO.29 51 ST AVENUE NE:84 TH STRE:.ET NE TO 88 TH STREET NE A new 3-lane alignment between 84,h St.NE and 88 1h St.NE including bike lanes and sidewalk to connect the missing link gap on this arterial roadway. ITEM NO.30 SR 529 /INTERSTATE 5 INTERCHANGE EXPANSION Construct new northbound off-ramp from Interstate 5 to SR 529 and new southbound on- ramps from SR 529 to Interstate 5 completing a full interchange at this location. page 3 of 4 Updated:0612912011 Recommended for adoption;07/11/2011 ITEM NO.31 1 16TH STREET NE /INTERSTATE 5 INTERCHANGE Tulalip Tribes project to upgrade the existing diamond interchange to a single point urban interchange. ITEM NO.32 88TH STREET NE /INTERSTATE 5 INTERCHANGE Tulalip Tribes project to upgrade the eXisting diamond interchange to a single point urhan interchange. ITEM NO.33 SR 529 EBEY SLOUGH BRIDGE REPLACEMENT A Washington State Department of Transportation (WSDOT)project that will replace the existing 2"lane swing span bridge witb a 4"lane fixed span bridge. ITEM NO.34 SR 531 (lnNO ST.NE):43 RO AVENUE NE TO SR 9 A WSDOT project widening existing 2-lane roadway to 4-lanes with a two-way middle left turn lane at applicable locations. ITEM NO.35 SR 9:LUNDEEN PARKWAY TO SR 92 (PHASE 2) This second phase of the project will make provisions for a future fourth leg to the intersection at SR 9 &SR 92.To accommodate this widening improvements will be made along SR 92 and.portions of SR 9 at the intersection. ITEMS NO.36 SR 9 /SR 528 INTERSECTION WSDOT improvement project to add an east leg to the intersection,add right-turn and left- turn lanes,and upgrade signals and lighting. ITEMS NO.37 SR 9/84TH STREET NE INTERSECTION WSDOT improvement project to add turn lanes,upgrade signals and lighting. ITEMS NO.38 STATE AVENUE DEBT SERVICE Yearly deht payments necessary to provide a portion of the local match funding to pay for the State Avenue,Grove Street to First Street prOject. ITEMS NO.39 ADDITIONAL DEBT SERVICE' $8,000,000 bond with a 20 year term at 4%interest. ITEMS NO.40 LAKEWOOD TRIANGLE ACCESS DEBT SERVICE Yearly debt payments necessary to provide a portion of the funding to pay for the Lakewood Triangle Access Design.$1,000,000 bond with a 5 year term at 0.5%interest. page 4 of 4 Updated:06/2912011 Recommended for adoption;07/11/2011 35 ;,, !£ hl~~f1.,,,,,, ,,, YCRIiARONW l 1 ~ City of Marysville S'X yE4"i; 7 T~.:~".,'>,::'7''I'''',r;"'T 4_."..",.,T1[)-f.,.} 1-~,!i"«~C\E··"'!Et-,/T ;>t,4"'J ·--,~ 2013 OOUG& pHASE CITY FUNDS OTHER FUNDS FUNDSOURCE 2014 OBUG & PHASE CITY FUNDS OTHER FUNDS FUNDSOURCE '", CITY FUNDS OTHER FUNDS 6 YR.PROJECT COST 2015·2017 OBUG&PHASE CITY FUNDS OTHER FUNDS FUND SOURCE 254 -"'ICH{CE ..,t- ,,'"PElRW--- 2012 OBUG& PHAS'O'CITY FUNDS OTH'ORFUNDS FUND SOURCE CG?SlW32? PROJECT NAME AND DESCRIPTION 80lh SI.Nf SIDEWAlK:47TH AVf NE TO 51ST AVE NE INSTALL SIDEWALK ON SOUTH SIDE OF ROADWAY ... f CITY ~I ~-CITY I' f-- 53RD AVE NE:SR 528 TO SUNNYSIDE 8WD CONSTRUCT BICYCLE AND PEDESTRIAN FACILITIES 32P ----f----------------505~,us 3 =STATE AVfNUf {SR 5281mERSfOlON CHANGE SEAND SW RADII AS A CONDITION OF DEVELOPMENTS 12:?- -CPT ----- 25D DEVELOPER I --25i)f------". 4=53RD AVENUf Nf {SR 528 ImERSfCTlON CONSTRUCT A NEW TRAFFIC SIGNAL AT THE INTERSECTION ~-----I--PE -- o 315 ----1---- ,,, 5 "" 6 "'"' 48TH DR NE {loom ST lmERSfCnON CONSTRUCT A NEW TRAFFIC SIGNAL ATTHE INTERSECTION -I- 116m ST Nf {STATE AVE ImERSfCTlON CONSTRUCT TURN lANE{S),MODIFY TRAFFIC SIGNAL,ADD A SECOND WESTBOUND THRU LANE AND EXTEND THE EASTBOUND RIGHT-TURN lANE 12 :?CGPSlW CGPSTW 1-- PElRW ...:--------GMA-ST 300 UNFUNDED ---- '"CNICE 50' IGMA-sT AU. 465 UNFUNDED IGMA-ST 700 UNFUNDED '" --0 -----1,500 '" 1,500 '" '" - o ----2,213- '" o 900 -- 500 UNFUNDED t --- 2,213 DEVELO?ER 1--- -- ---- '"CNICE - 325 UNFUNDED -- - iC3:~I,;::>:,j::;(:10!;!I>:;::'::~<:/:<:: CNICE ---"'I ill 75 UNFUNDED PElRW I 1- - PE PE ----- CGPSTW--- CGPSTW 12? 14 12 ,p I f-- CPT _F+-----'----+-'----+- STATE AVE {84TH ST NE ImERSfCTION CONSTRUCT RAIL CROSSING AND INSTALL A TRAFFIC SIGNAL SR 5281 DELTA AVE PEDESTRIAN SIGNAL CONSTRUCT A PEDESTRIAN SIGNALATTHE INTERSECTION I STATE AVE I 88TH STNE ImERSECTION ADD THRU AND TURN lANES MODIFY TRAFFIC SIGNAL 9 ,~ 6 = 7 ,~ 400 40010= 11 CITY 51ST AVE HE I 152ND ST Nf lmERSEOION INSTALL A TRAFFIC SIGNAL AND POSSIBLY PROVIDE ADDITIONAL CHANNELIZATION ImEWGENTTRANSPOKTATION SYSTEM IMPLEMENT ITS PROGRAM TO IMPROVE SIGNAL COORDINATION AND MANAGEMENT 12P '"CPT 50 'UNFUNDED 1---- --I -I +50 UNFUNDED ALL - - .. I ------ 50 UNFUNDED AU. '" ---- 150 UNFUNDED -- , --1--- ,,,,,, - 12 CITY 14 = STATE AVE:116TH ST.NEto 136TH ST.NE CONSTRUCT EASTERN 2 lANES FOR A FULL 5 lANE ROADWAYSECIION STATEAVENI)E:1GOTH ST.HE TO 116TH ST.HE WIDEN TO 5 LANE SECTION WITH CURB,GUTTER AND SIDEWALK,AND REPLACE QUILCEDA OVERCROSSING SUNNYSIDE BLYD.:47TH AVE.HE TO 52ND ST.NE TWO GENERAL PURPOSE lANES IN EACH DIRECTION WITHA TWO-WAY LEFT TURN lANE,AND CURB,GUTTER AND SIDEWALK 14 4.F " CGPSlW -- CGPSTW L1!lQ PElRW I '::':::lJJ2!!. 1,400 UNFUNDED CNICE - PE PE GMA'$_T'- 3,000 UNFUNDED 250 UNFUNDED ,----- illQQ 1--, AU. Ale ---- 17,000 UNFUNDED 13,000 , , 4,400 - --19,000 13,250 4,400 - 19,000 13,250 4,000 1,900 4,250 11,440 1,900 4,000 -~--- 1-------- o 4,250 , ,----- -1-- GMA-ST 4,000 DEVELOPER 4,250 UNFUNDED IGMA-ST - --1~_~OO_F_-=--=.:::~ ---AU. ----- GMA-$T _____ 4,000 1 _ f---'" - --1M.,'-' '" -- I \GMA-ST '....' AU. - - - --f---- CGP5TW CGPSTW 4 P 1,4P 14 4·P " 51ST AVENUE HE:150TH ST HE TO ARLINGTON ClTYLIMrTS 16 WIDEN EXISTING ROADWAY FROM TWO lANES TO 5 lANES WITH CURB,GUTTER, SIDEWALK,BICYCLE AND PEDESTRIAN FACILITIES 88TH SfflEET He QU/L CEDA BRIDGE TO f.5 CO_N_~TRUC!_\'\PEST~OUND RIGHTTURN ~~OP lANE o~_~aTH ST_NE FROM~~..1 _ END OF QUIL CEDA BRIDGE TO INTERSTATE 5 __~__+-'__-++-__+_ I 152ND STREET HE:STATE AVE.TO 4JRD VIC. WIDEN FROM 2 TO 3 lANES 4fJTHSTREETHE:SUHNYSIDEBOULEVARDHE TOSR9 16 1,4'P '!GPSTW . IMPROVEMENTS CONSISTING OF ONE OR TWO GENERAL PURPOSE lANE EACH DIRECTION AN-6sHOULOER TO PROVIDE AATI:~IAL CONNECTiViiY -=('-~--=:j--::::::::-:::::j:::::::::-l-::::---= 17 CITY 16 = 16 = 15 = ATTACHMENT#2 S:\PublicWorksI5haredlEngineeringIProlectsITransportationITransportation\TIP_12-17\2012 •2017 TIP *KEY:PE Preliminary (Design)Engineering,RW.Rlght-of.Way Acq.,CN Construction,CE Construction Engineering page1of3 Updated:0612912011 Recommended for Adoption:7/11/11