HomeMy WebLinkAboutGranite Construction Co - 2019 HSIP Project Project Manual Contract Documents and Special Provisions For 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Federal Aid # HSIP-000S(523) City Project # R1901 ESL 1891 mARysvILIE WASHINGTON Prepared By: Transportation Solutions, Inc. 16932 Woodinville-Redmond Road, Suite A206 Woodinville, WA 98072 Prepared For: City of Marysville Public Works Department 80 Columbia Ave. Marysville, WA 98270 (360) 363-8100 City of Marysville 1IPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal This page left intentionally blank City of Marysville 2IPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal PART 1 - PROJECT AND BIDDING INFORMATION 5 CALL FOR BIDS 6 INFORMATION FOR BIDDERS 8 PROJECT DESCRIPTION 8 PRE-BID MEETING 8 GOVERNING DOCUMENTS 8 SUPPLEMENTAL INFORMATION FOR BIDDERS 8 PREPARATION OF BIDS 9 RECEIPT OF BIDS 9 OPENING OF BIDS 9 AWARDING AND EXECUTION OF THE CONTRACT 9 CONTRACT TIME & LIQUIDATED DAMAGES 9 BIDDER'S CHECKLIST 10 PART 2 - BID PROPOSAL DOCUMENTS 11 STATEMENT OF BIDDER'S QUALIFICATIONS 12 LOCAL AGENCY SUBCONTRACTOR LIST 14 CERTIFICATION FOR FEDERAL-AID PROJECTS 15 BID PROPOSAL FORM 16 ANTI-DISCRIMINATION CERTIFICATION 18 UDBE CERTIFICAITON 19 BID DEPOSIT 34 Proposed Contract Performance Bond Surety 34 DEPOSIT OR BID BOND FORM 35 PART 3 - CONTRACT DOCUMENTS 37 PUBLIC WORKS CONTRACT 38 PERFORMANCE BOND 42 PAYMENT BOND 43 PART 4 - PREVAILING WAGE RATES 45 PART 5 - SPECIAL PROVISIONS 75 City of Marysville Wage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal FHWA-1273 - REQUIRED CONTRACT PROVISIONS FOR FEDERAL AID CONSTRUCTION PROJECTS 239 CONSTRUCTION PLANS 253 STANDARD PLANS 254 City of Marysville Wage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal PART 1 - PROJECT AND BIDDING INFORMATION City of Marysville 5IPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal CALL FOR BIDS 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Notice is hereby given that sealed bids will be received by the City Clerk at Marysville City Hall, 1049 State Avenue, Marysville, WA 98270 until 10 a.m., local time, on Thursday, January 28, 2021 at which time and place they will be publicly opened and read aloud. The City will not consider proposals received after this time. Bidders shall submit an original bid in a sealed envelope labeled with the bidder's name and project title. The CITY has received a federal grant for Local Road Safety under the Highway Safety Improvement Program (HSIP). The project improvements will include the following. • Installation of high friction surface treatment and speed radar warning signs on Smokey Point Blvd. north of 140th Street NE. • Installation of pedestrian-actuated rectangular rapid flashing beacons (RRFB), new sidewalk and upgrade of ADA curb ramps at the intersection of 100th Street NE and 59th Drive NE. • Signal modifications at the intersections of 64th Street NE (SR 528) and 60th Drive NE and 64th Street NE (SR 528) and 67th Avenue NE to provide for left turn and one right turn flashing yellow arrow(FYA) signal operations. • Installation of speed radar warning signs at 64th Street NE (SR 528) west of 65th Drive N E. • Installation of advanced westbound signalized approach beacons/signage on 64th Street NE (SR 528) east of 68th Avenue NE to warn drivers approaching the intersection of 67th Avenue NE to "be prepared to stop when flashing". All work must be completed in accordance with the Contract Documents and the Contractor must comply with all applicable federal, state, and local laws and regulations. The Engineer's Estimate for this project is $492,440. Please address any comments and questions you may have to Steven Miller, Senior Project Manager, at 360.363.8285. Plans, specifications, addenda, and plan holders list for this project are available online through Builder's Exchange of Washington, Inc., at http://www.bxwa.com; 2607 Wetmore Avenue, Everett, WA 98201-2929, (425) 259-3832. Click on "bxwa.com"; "Posted Projects", "Public Works", "City of Marysville", "Projects Bidding", "I agree", and Project Bid Date. (Note: Bidders are encouraged to "Register as a Bidder", in order to receive automatic email notification of future addenda and to be placed on the "Bidders List". This service is provided free of charge to Prime Bidders,Subcontractors&Vendors bidding on the project. Contact Builder's Exchange of Washington at 425-258-1303 should you require further assistance.) Plan specifications, addenda, and plan holders list may also be obtained directly through the City by contacting the Project Manager. Each bid must be accompanied by a certified check, cashier's check, or bid bond (with an authorized surety company as surety) made payable to the City of Marysville in an amount not less than five percent (5%) of the bid amount. City of Marysville Wage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal The City of Marysville reserves the right to reject any and all bids and waive any irregularities or informalities in the bid or in the bidding. No bidder may withdraw its bid after the hour set for the opening thereof or before award of contract, unless said award is delayed for a period of forty- five (45) days. The City further reserves the right to make the bid award as deemed in the best interest of the City. The City of Marysville in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally- Assisted Programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color or national origin or sex in consideration for an award. Tina Brock, Deputy City Clerk City of Marysville First publication: Everett Herald (January 6, 2021) Daily Journal of Commerce (January 6, 2021) Second publication: Everett Herald (January 13, 2021) Daily Journal of Commerce (January 13, 2021) City of Marysville 7lPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal INFORMATION FOR BIDDERS PROJECT DESCRIPTION The CITY has received a federal grant for Local Road Safety under the Highway Safety Improvement Program (HSIP). The project improvements will include the following. • Installation of high friction surface treatment and speed radar warning signs on Smokey Point Blvd.north of 140th Street NE. • Installation of pedestrian-actuated rectangular rapid flashing beacons(RRFB),new sidewalk and upgrade of ADA curb ramps at the intersection of 100th Street NE and 59th Drive NE. • Signal modifications at the intersections of 64th Street NE(SR 528)and 60th Drive NE and 64th Street NE(SR 528)and 67th Avenue NE to provide for left turn and one right turn flashing yellow arrow(FYA)signal operations. • Installation of speed radar warning system at 64th Street NE(SR 528)west of 65th Drive NE. • Installation of advanced westbound signalized approach beacons/signage on 64th Street NE (SR 528),east of 68th Ave NE,to warn drivers approaching the intersection of 67th Avenue NE to"be prepared to stop when flashing". PRE-BID MEETING All bidders ❑ do ® do not have to attend a mandatory pre-bid meeting on-site on , at AM. The purpose of this meeting is to give the contractors an opportunity to ask questions and to provide access to the site to take notes about existing site conditions and take any measurements that may be needed to plan for the work required by the Bid Documents in preparation of their bid. GOVERNING DOCUMENTS The execution and prosecution of the work under this contract is governed by this Project Manual, including the plans and specifications contained herein, the 2021 WSDOT Standard Specifications for Road, Bridge and Municipal Construction (herein referred to as "the Standard Specifications') published by the Washington State Department of Transportation, and any General Special Provisions provided herein. SUPPLEMENTAL INFORMATION FOR BIDDERS The bidder shall promptly notify the City's Project Manager of any discovered omissions, conflict, ambiguities,or discrepancies in the Bid Documents.Bidders shall direct any Requests for Information (RFI's)to the City's Project Manager. Under no circumstances shall the bidder contact the design consultant unless specifically directed by the City's Project Manager. The Owner has made the following supporting documents available for review by bidders at the City of Marysville Public Works Department, 80 Columbia Avenue,Marysville Washington: NONE City of Marysville Wage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal PREPARATION OF BIDS The bidder shall prepare and submit its bid on the Bid Proposal Documents provided in the Project Manual and in accordance with the Standard Specifications (as may be modified herein). Each bidder must submit a bid deposit payable to the City of Marysville for five percent of the total amount of the bid. The bidder may submit a certified check or cashier's check in lieu of a bid bond. Attorneys-in-fact who sign bid bonds must file a certified and effective dated copy of their power of attorney. RECEIPT OF BIDS Bids will be received at the time and location set forth in the Call for Bids and then at said office will be publicly opened and read aloud. The City will not consider any bid received after the time and date specified. If delivered by mail, the bidder shall enclose the sealed envelope containing the bid within another envelope addressed to the City at the above address. Bids may be withdrawn or modified as provided in the Standard Specification (as may be modified herein). OPENING OF BIDS The City will publicly open and read aloud all bids immediately after the time set for receiving bids. The City invites all interested persons to attend the bid opening. Following the bid opening, the City will provide a listing of the firms submitting bids and their bid amounts, upon request. After City staff has reviewed the bids and corrected any errors in the calculations of the bid amounts, the City will publish a Certified Bid Tabulation listing all unit prices, extensions and totals for all bidders. This will be available at the City of Marysville Public Works Department offices and website immediately after certification. AWARDING AND EXECUTION OF THE CONTRACT The Contract shall be awarded and executed as provided in the Standard Specifications(as may be modified herein). CONTRACT TIME & LIQUIDATED DAMAGES The contract time for this project shall be set at 45 working days, as defined in Section 1-08.5 of the Specifications. City of Marysville Wage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal BIDDER'S CHECKLIST The bidder's attention is especially called to the following forms that must be completed in full as requested and submitted collectively as the Bid Proposal package. ❑ 1. Statement of Bidder's Qualifications ❑ 2. Bid Proposal Form.All portions of the Bid Schedule, Bid Additive, Total Bid, Signature Page, and Proof of Authority to Sign Bid must be completed. ❑ 3. Bid Deposit and Statement of Intended Surety ❑ 4. Notarized Power-Of-Attorney for Surety's Agent to Execute Bid Bond ❑ 5. Acknowledgement of Receipt of Addenda (on Bid Proposal Signature Page 29) ❑ 6. Certification of Compliance with Wage Payment Statutes The successful bidder shall execute and submit the following contract forms following contract award. Bidders are encouraged to carefully examine the included documents: ❑ 1. Contract The successful bidder shall execute the Contract in two counterparts. ❑ 2. Performance Bond To be executed by the successful bidder and the bidder's surety company. ❑ 3. Payment Bond To be executed by the successful bidder and the bidder's surety company. El 4. Contractor's Declaration of Option for Management of Statutory Retained Percentage The successful bidder shall complete the attached form, and any forms for the retainage option selected that may be required. City of Marysville 10IPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal PART 2 - BID PROPOSAL DOCUMENTS The documents contained within this section constitute the formal proposal from the bidder to the City for this project. Failure of the bidder to submit all pages contained in PART 2 with its bid and to accurately complete all applicable forms may be grounds for the Owner to consider the bid non-responsive. City of Marysville 11IPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal STATEMENT OF BIDDER'S QUALIFICATIONS Name of Contractor: Granite Construction Company Address: 1525 E Marine View Dr. , Everett, WA 98201 Contact Person: Beth Duffus Phone: 425-551-3100 Contractor has engaged in the construction business under the present firm name indicated for the past 99 years. Gross dollar amount of work currently under contract $ $2,416,624,000 Approximate percentage of current contracts outstanding $5,196,113,000 47% Type of work generally performed by Contractor Excavation, base and sub base, grading, paving, underground utilities, sewer, water and storm drains, concrete flatwork, curb, gutters and sidewalks. List five major projects of a similar nature completed within the last ten years and the gross dollar amount of each project. See Attached $ $ List of five major pieces of equipment that are anticipated to be used on the project by the Contractor and ownership of the item. -0 -o -a d) C) d) p Description of Equipment re 131 ❑ ❑ et_ck-l\ne C ❑ ❑ PAC, crvvvpn ckov II El CI City of Marysville 12IPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal STATEMENT OF BIDDER'S QUALIFICATIONS(continued) Bank References: See attached How many general superintendents or other responsible employees in a supervisory position do you have at this time and how long have they been with the Contractor? See attached Have you changed bonding companies within the last three years? ❑Yes No If so,why? Have you ever sued or been sued by any special district, municipality, county, or state government, concerning a public works contract? x❑ Yes ❑ No If so, explain. See Appendix A If so, name the agencies and reasons therefore. Disposition of case, if settled: Washington State UBI No: 409 023 062 Washington State Contractor's Registration No.: CC GRANICC916DL Washington State Worker's Comp Account No.: 572 , 672-04 IRS Employer Number: 94-0519552 Or, if individual, Social Security Number: City of Marysville 13 ' Page 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal Local Agency Name Local Agency Address Local Agency Subcontractor List Prepared in compliance with RCW 39.30.060 as amended To Be Submitted with the Bid Proposal Project Name 2 019 -CITYWIDE HIGHWAY SAFETY- IMPROVEMENTS - Failure to list subcontractors with whom the bidder,if awarded the contract,will directly subcontract for performance of the work of structural steel installation,rebar installation,heating,ventilation and air conditioning,plumbing,as described in Chapter 18.106 RCW,and electrical,as described in Chapter 19.28 RCW or naming more than one subcontractor to perform the same work will result in your bid being non-responsive and therefore void. Subcontractor(s)with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation, rebar installation,heating,ventilation and air conditioning,plumbing,as described in Chapter 18.106 RCW,and electrical as described In Chapter 19.28 RCW must be listed below.The work to be performed is to be listed below the subcontractor(s)name. To the extent the Project includes one or more categories of work referenced in RCW 39.30.060,and no subcontractor is listed below to perform such work,the bidder certifies that the work will either(I)be performed by the bidder itself,or(II)be performed by a lower tier subcontractor who willnot contract directly with the bidder. •Subcontractor Name • c)&Vl f . G` .LM . (A-t tNG. Work to be performed �{L(yj f aJ - - _ Subcontractor Name • 0PJ,rV\t... E,LuklA, Co. (►V..• Work lobe performed WOo..V 6 6(-CrAA5 FANS Subcontractor Name - Work to be performed Subcontractor Name Work to be performed Subcontractor Name Work to be performed • Bidder's are notified that it is the opinion of the enforcement agency that PVC or metal conduit,junction boxes.etc.are considered electrical equipment and therefore considered part of electrical work,even if the installation is for future use and no wiring or electrical current is connected during the project. DOT Form 271-01 SA Revised 06f2020 City of Marysville 14IPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal BID PROPOSAL FORM TO: CITY OF MARYSVILLE 1049 STATE AVENUE MARYSVILLE,WA 98270 The undersigned bidder declares that the bidder has carefully examined the Project Manual including the Plans and Specifications, Call for Bids, Information for Bidders, Standard Specifications, General and/or Special Provisions, Proposal Documents, Contract Documents, and any other documents relating to the 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT, has made such investigations as are necessary to determine the premises and conditions to be encountered in the work, will enter into a contract with the City in the form of the Contract enclosed, and will,to the extent required,furnish all labor and materials and perform all work as required for construction of the improvements in strict accordance with the Contract Documents for the unit prices shown on the Bid Schedule. The bidder further declares that this Proposal is in all respects fair and is made without collusion on the part of any person,firm, or corporation mentioned below, and that no officer or employee of the City of Marysville is personally or financially interested, directly or indirectly, in the Proposal or in any purchase of or sale of any materials or supplies for the work to which it relates, or any portion of the profits thereof. The bidder agrees that it will hold its bid proposal open for forty-five (45) days after the actual date of bid opening and if its proposal is accepted, will timely execute a contract in the form of the contract included herein, will execute and provide all bonds, certifications, and documents required herein, and will timely commence work following execution of the contract. Thereafter, the bidder declares that it will timely complete the work in accordance with the Contract Documents and in the event that the bidder fails to complete the work within the time specified in the Contract Documents, will pay liquidated damages to the City of Marysville per the specifications and requirements of the Contract Documents. The bidder further agrees that the bid bond or deposit accompanying this bid shall be left in escrow with the City, and that the liquidated damages which the City will sustain by the failure of the undersigned bidder to execute and deliver the contract and performance bond will be equal to five percent (5%) of the total bid. If the undersigned bidder defaults in executing that contract and in furnishing the contract performance bond within twenty (20) days of the date on the Notice of Award, then the bid guaranty shall become the property of the City. If, however, the City does not accept this bid or any part thereof within forty-five (45) days of the time set for the opening of bids, or if the undersigned bidder executes and delivers said contract and surety bond,the bid guaranty shall be returned to the bidder. By signing and submitting this Bid Proposal, the bidder swears, under penalty of perjury under the laws of the State of Washington and the laws of the United States, and affirms that the following items are true and correct. City of Marysville 16IPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal Failure to return this Declaration as part of the bid proposal package will make the bid nonresponsive and ineligible for award. NON-COLLUSION DECLARATION 1,by signing the proposal,hereby declare, under penalty of perjury under the laws of the United States that the following statements are true and correct: 1. That the undersigned person(s),firm, association or corporation has (have)not,either directly or indirectly, entered into any agreement, participated in any collusion,or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this proposal is submitted. 2. That by signing the signature page of this proposal, I am deemed to have signed and to have agreed to the provisions of this declaration. NOTICE TO ALL BIDDERS To report rigging activities call: 1-800-424-9071 The U.S. Department of Transportation(USDOT)operates the above toll-free 'hotline"Monday through Friday, 8:00 am.to 5:00 p.m.,eastern time. Anyone with knowledge of possible bid rigging,bidder collusion,or other fraudulent activities should use the 'hotline"to report such activities. The"hotline"is part of USDOT's continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the USDOT inspector General. All information will be treated confidentially and caller anonymity will be respected. SR DOT EOM 272-036I EF d7J201L City of Marysville 17IPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal ANTI-DISCRIMINATION CERTIFICATION The bidder her'eby covenants, stipulates and agrees that no person shall be discriminated against in the bidding of the service and/or materials hereunder and that the bidder shall not refuse to hire any person therefore because of such person's race,creed,color or national origin, unless based on a bona fide occupational qualification. Also, the bidder will in no matter discriminate against any person because of such person's race, creed, color or national origin. Any such discrimination shall be deemed a violation of this bid and shall render this bid subject to forfeiture. NOTICE TO ALL BIDDERS To report rigging activities, call: 1-800-424-9071 The U.S. Department of Transportation (USDOT) operates the above toll-free"hotline" Monday through Friday,8:00 a.m.to 5:00 p.m., ET.Anyone with knowledge of possible bid rigging,bidder collusion, or other fraudulent activities should use the "hotline"to report such activities. The "hotline" is part of the USDOT's continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the USDOT Inspector General. All information will be treated confidentially and caller anonymity will be respected. City of Marysville 18 ' Page 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage. Conditions Agreement see www.bxwa.com - Always Verify Scal VWWashington State Underutilized Disadvantaged Business Department of Transportation Enterprise Utilization Certification To be eligible for Award of this Contract the Bidder shall fill out and submit,as a supplement to Its sealed Bid Proposal,an Underutilized Disadvantaged Business Enterprise(UDBE)Utilization Certification,The Contracting Agency shall consider as non-responsive and shall reject any Bid Proposal that does not contain aUDBE Utilization Certification which properly demonstrates that the Bidder will meet the UDBE participation requirements in one of the manners provided for in the proposed Contract_Refer to the instructions on Page 2 when filling out this form or the Bid may be rejected.An example form has been provided on Page 3.The successful Bidder's UDBE Utilization Certification shall be deemed a part of the resulting Contract. Granite Construction Company Box 1: certifies that the UDBE firms listed below have been contacted regarding participation on this project.If this Bidder is successful on this project and is awarded the Contract,it shall assure that subcontracts or supply agreements are executed with named UDBEs.(If necessary.use additional sheets.) Box 2: 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS Column 1 Column 2 Column 3 Column 4 Column 5 Name of UDBE Project Role Description of Work Dollar Amount Dollar Amount (See Instructions) (See instructions) (Sea Instructions) Subcontracted to be Applied to UDBE Towards Goal (See instructions) (See instructions) (oti att• 1.� ,,bcat.trutkcv Coy\c, -ckAkikreriv, I24,225.eO (fir$ co yew• Subcp trarkw SUvIe`1 A Is,Sip.— 11i215. • Go Underutilized Disadvantaged Business $Z2)114L ,. Total UDBE Commitment Dollar Amount$2$15( j,� Enterprise Condition of Award Contract Goal Box 3 Box 4 5❑By checking Box 5 the Bidder is stating that their attempts to solicit sufficient UDBE participation to meet the OA Contract goal has been unsuccessful and good faith effort will be submitted in accordance with Section 1-02.9 of the Contract DOT Form 272-056U Revised 031201 B City of Marysville 19jPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 This page left intentionally blank City of Marysville 26IPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal BID SCHEDULE 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Notes: Unit Prices for all Bid Items must be shown. All entries must be typed on in ink. ITEM SECTION DESCRIPTION QTY UNIT UNIT TOTAL # PRICE PRICE 1 1-04.4 SP Minor Changes 1 EST DOL $20,000.00 2 1-05.4 SP Roadway 1 LS 553Oto.' /5,7 60•%% Surveying 3 1-05.4 SP ADA Features 1 LS $2,2.0°' il 2,2150, Surveying 4 1-05.18 SP Record Drawings 1 LS 'tiSPOO.°= 9/5(010•� (Min. Bid $5,000) 5 1-07.15 SP SPCC Plan 1 LS 150O,g9- li5at),-°" Property 6 1-07.16 SP 1 EST DOL $4,000.00 Restoration 7 1-09.7 SP Mobilization 1 LS li 701 pub.c=9 410,0JO Project Temporary 8 1-10.5 SP Traffic Control 1 LS Siy2150uS•39 $1421 °. (Min. Bid $10,000) 9 1-10.5 Construction Signs 80 SF $ 15.0° 8 S, (ncst.)•=' Class A Portable 10 1-10.5 Changeable 120 HR $9.0..§- A I, oso.%' Message Sign 11 2-01.5 Clearing and 1 LS $ 1110150•3)- /1lii6M•� Grubbing 12 2-01.5 Roadside Cleanup 1 EST DOL $2,000.00 Roadway 13 2-03.5 Excavation Incl. 70 CY $ Z5S."�'� 111,966 .1?"-- Haul 14 2-05.5 SP Potholing 3 EA $ 960.-eg- It 21100•-!-') Crushed Surfacing 15 4-04.5140 �, 5,te 40 CV Base Course $ w City of Marysville 27IPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 16 4-04.5 Crushed Surfacing 25 CY !So °° $Li,Sab•� Top Course 17 5-04.5 SP 2 MA Cl. "A" PG 64- 20 TON ffi 50t0•`: 610(( ,'= 18 5-06.5 SP 2 High Friction 1,860 SY y( %' $bSIS(00•% Surface Treatment 19 7-05.5 Adjust Catch Basin 2 EA I, (,Oro•c" 2.,2_00• Erosion Control 20 8-01.5 and Water 1 LS 11 I �1 .° cuo• Pollution Prevention Cement Conc. 00 21 8-04.5 Traffic Curb and 115 LF .31•°`—' Li/ygS. Gutter 22 8-04.5 Cement Conc. 120 LF 37. 4 Pedestrian Curb ,`f40 °' 23 8-09.5 Raised Pavement 0.6 HUND C4 Ib20.°5 (eaZ.* Marker Type 2 24 8-10.5 SP Flexible Delineator 15 EA ft 140.q9 $2110 Cement Conc. Curb 25 8-14.5 Ramp,Type 3 EA 62,S010•42 $Mao• Parallel Cement Conc. Curb 26 8-14.5 Ramp,Type 3 EA ' Zi 760•°n S g,101D.od Perpendicular 27 8-14.5 Cement Conc. 30 SY , 02 S Sidewalk 28 8-14.5 Detectable 60 SF $29 .aO OLIO. Warning Surface Curve Warning System (Smokey 3 •_ ill 29 8-20.5 SP Point Blvd. north 1 LS 3y'� 3�(,ocstO°° of 140th Street NE), Complete Rectangular Rapid Flashing Beacon 30 8-20.5 SP (RRFB)System 1 LS 31(OUL)% 21)3l,o 5 tcO• (100th Street NE and 59th Drive NE), Complete City of Marysville 28IPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Traffic Signal System Modifications I Cf,crco.�' 1 c (O.oc). 31 8-20.5 SP (64th Street NE 1 LS and 60th Drive NE), Complete Traffic Signal System 32 8-20.5 SP Modifications 1 LS $ I1 rGo $t ooO.* (64th Street NE and 67th Avenue NE), Complete Speed Radar Warning System 3`f�oiJf'cla Sq,exp•°-° 33 8-20.5 SP (64th Street NE 1 LS west of 65th Drive NE), Complete Advanced Warning Beacon System 34 8-20.5 SP (64th Street NE 1 LS �31,560•°� east of 68th Ave NE), Complete Plastic Crosswalk 35 8-22.5 SP Line 120 SF $ 11.012. I, 32 °°0• 36 8-22.5 SP Plastic Stop Line 34 LF 110.'52 $ 37 8-22.5 SP Paint Line 3,080 LF 0.10 s 2,15(0•4 38 8-22.5 Removing Paint 3,080 LF %' S LineZ. (p,lf¢t0• 39 8-22.5 Removing Plastic 30 LF $ 105.` Line 40 8-22.5 Removing Plastic 84 SF 3 50 $Oiy Crosswalk Line TOTAL BID: '109 ,9 562.'22 (The City reserves the right to award the lowest responsive, responsible bidder based on the Total Base Bid or the Total Bid). City of Marysville 291Page 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 • Local Agency Certification for Federal-Aid Contracts The prospective participant certifies by signing and submitting this bid or proposal,to the best of his or her knowledge and belief,that: (1) No Federal appropriated funds have been paid or will be paid,by or on behalf of the undersigned,to any person for influencing or attempting to influence an officer or employee of any Federal agency,a Member of Congress, an officer or employee of Congress.or an employee of a Member of Congress in connection with the awarding of any Federal contract,the making of any Federal grant,the making of any Federal loan,the entering into of any cooperative agreement,and the extension,continuation,renewal,amendment. or modification of any Federal contract,grant,loan or cooperative agreement • (2) if any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency.a Member of Congress,an officer or employee of Congress,or an employee of a Member of Congress in connection with this Federal contract,grant,loan,or cooperative agreement,the undersigned shall complete and submit Standard Form-LLL,`Disclosure Fomi to Report Lobbying,'in accordance with its instructions. This certification is material representation of the fact upon which reliance was placed when this transaction was made or entered into. Guhmission nt this certification is a prereouisite for making or entering into this transaction imposed by Section 1352,Title 31, U.S.Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than 510,000 and not more than$100,000 for each failure. The prospective participant also agrees by submitting his or her hid or proposal that he or she shall r-. ire that the language of this certification be included in all lower tier subcontracts.w'nich exceed S100,000 and that all such subrecipients shall certify and disclose accordingly. COT 3e. ,_:. ,3'er � 77:71t City of Marysville 30IPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Seal IN WITNESS hereto, the undersigned bidder: a) Agrees to the conditions of this bid; b) Certifies that this bid has not been restricted, modified or conditioned; c) Acknowledges receipt of addenda 1 to 3 d) Attests to the absence of collusion in the Non-Collusion Affidavit above and agrees to be bound by its provisions; e) Covenants,stipulates and agrees in accordance with the Anti-Discrimination Certification above; f) Declares, accepts and understands the requirements of the Contract Documents; g) Has reviewed the insurance provisions of the Contract Documents and certifies that coverage will be provided as required; h) Understands and agrees as to the completion time and liquidated damages as above, and i) With the full authority of the firm submitting this bid has signed below this 28th day of January , 20 21 X 444-1P- Signature of bidder James A. Prouty Printed Name Sr . Estimator Title Granite Construction Company Company Name Address at which to direct correspondence: 1525 E Marine View Dr. City Everett State: WA Zip: 98201 Phone: 425-551-3100 Fax: 425-551-3116 Email: bid. everett@gcinc . com License No.: CC GRANICC916DL Sworn before me this 28th day of January , 20 21 . `` ��Q�;vM�NENsAmy())4/17/1 rensen (Print Name) :•.g ver 1q%). Notary Public in and for the State of Washington , Q NOTggy residing at: 1525 E Marine View Dr. Everett WA • •-••••• •• = My appointment expires: 10/10/2024 • PUBLIC • •i�j•Anto Asvl210�'" •• n111111111 City ot 311Page 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 PROOF OF AUTHORITY TO SIGN BID The party by whom this bid is submitted and by whom the contract will be entered into, in case the award is made to said party, is Firm Name: Granite Construction Company ❑x Corporation ❑ Partnership ❑ Individual Doing business at 1525 E Marine View Dr. Everett, WA 98201 Address City/State Which is the address to which all communications concerned with this bid and contract should be sent. The name of the president, treasurer, and manager of the bidding corporation, or the names of all persons and parties interested in this bid as partners or principals are as follows: Name/Title Address See Attached If Sole Proprietor or Partnership IN WITNESS hereto,the undersigned has set his (its) hand this_day of 20 Signature of bidder Title City of Marysville 32IPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal If Corporation IN WITNESS WHEREOF, the undersigned corporation has caused this instrument to be executed and its seal affixed by its duly authorized officers this 20th day of January , 2021. Granite Construction Company Name of Corporation By a• Secretary Title James A. Prouty Sr. Estimator Kenneth B. Olson, Assistant Secretary NOTE: 1. If the bidder is a co-partnership, so state, giving the name under which business is transacted. 2. If the bidder is a corporation, only a duly authorized official may execute this Bid Proposal. This proof of authority must be notarized. See Attached Jurat Sworn before me this day of , 20_ Poy Q,Irk POMP",P" (Print Name) E** 'i . � Notary Public in and for the State of N �. 0 ° residing at: j My appointment expires: .ate a' City of Marysville 33IPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal A notary public or other officer completing this certificate verifies only the identity of the U�I individual who signed the document to which this J certificate is attached,and not the truthfulness, accuracy,or validity of that document. STATE OF CALIFORNIA } } COUNTY OF SANTA CRUZ } Subscribed and sworn to (or affirmed)before me on this 20th day of January , 20 20 by Kenneth B. Olson proved to me on the basis of satisfactory evidence to be the person(s)who appeared before me. }t.rj � �,:;,� , - MARIA GOMEZ ' COMM. #2259567 o.�:� Notary Public-California 90)11/11ADSanta Cruz County 1 M4y Comm.Bjpires See:2, 20221 Signature of Notary Public Maria Gomez, Notary Public DEPOSIT OR BID BOND FORM DEPOSIT STATEMENT Herewith find deposit in the form of certified check or cashier's check in the amount of $ ,which amount is not less than five percent of the total bid. SIGN HERE N/A BID BOND KNOW ALL MEN BY THESE PRESENTS: That we, Granite Construction Company as Principal, and Travelers Casualty and Surety Company of America , as Surety, are held firmly bound unto the CITY OF MARYSVILLE, Washington, as Obligee, in the penal sum of Five Percent(5%) of Bid Amount Dollars,for the payment of which the Principal and the Surety bind themselves, their heirs, executors, administrators, successors, and assigns,jointly and severally by these presents. The condition of this obligation is such that, if the Obligee shall make any award to the Principal for the " 2019 Citywide Highway Safety Improvements Project Project," according to the terms of the bid made by the Principal therefore, the Principal shall duly make and enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award and shall give bond for the faithful performance thereof, with Surety or Sureties approved by the Obligee, or if the Principal shall, in case of failure to so do, pay and forfeit to the Obligee the penal amount of the deposit specified in the call for bids, then this obligation shall be null and void; otherwise, it shall be and remain in full force and effect,and the Surety shall forthwith pay and forfeit to the Obligee, as penalty and liquidated damages, the amount of this bond. SIGNED, SEALED, AND DATED THIS 20th DAY OF January 20 21 .0tatllicy4„, 4 /,� Granite Construction Company a Principal ▪al• it :102 z 1,404 g,^04r. dui tttttttu�iiurrrrrr,� By: �,P ", .' ���.�``PtJO �RETy .,,� Its: James A Prouty, Sr. Estimator e 1. 0,0 rw1 O ���v `�'JQ . 0�� Travelers Casualty and Surety Company of America Q HARTFORD, z= Surety A ,,▪ CON N. 10 (IAA-` ^� re• ,� a By: 4 ijj ``�� Its: Isabel Barron, Attorney-In-Fact 111°r'rrnn nt>>������� Received return of deposit in the sum of$ N/A City of Marysville 35IPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal • A notary public or other officer completing this certificate verifies only the identity of the individual ACKNOWLEDGMENT who signed the document to which this certificate is attached,and not the truthfulness,accuracy,or validity of that document. State of California County of Santa Cruz ) On January 20, 2021 before me, Maria Gomez,Notary Public (insert name and title of the officer) personally appeared Isabel Barron who proved to me on the basis of satisfactory evidence to be the person(s)whose name(s) is/are subscribed to the within instruments and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. J ; � MARIA GOMEZ w G' rt, , COMM. #2259567 z o,= �� Notary Public-California o WITNESS my hand and official seal. Z 'a Santa Cruz county m 1 v v y My Comm.Eipires Sep.24,2022 t Signature `/ ` (Seal) 1 Maria Gomez,Notary Public Travelers Casualty and Surety Company of America AIM► Travelers Casualty and Surety Company - TRAVELERS J St. Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS:That Travelers Casualty and Surety Company of America,Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut(herein collectively called the "Companies"),and that the Companies do hereby make,constitute and appoint Isabel Barron of WATSONVILLE , California , their true and lawful Attorney-in-Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF,the Companies have caused this instrument to be signed,and their corporate seals to be hereto affixed,this 3rd day of February, 2017. (EROCTrt:)) V 41:011‘ yet State of Connecticut �/� By: � ��--- City of Hartford ss. Robert L.Raney,Seft'or Vice President On this the 3rd day of February, 2017, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company,and St. Paul Fire and Marine Insurance Company,and that he, as such, being authorized so to do,executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. In Witness Whereof,I hereunto set my hand and official seal. 6. � �l My Commission expires the 30th day of June,2021 jr. � u._t' C tau. it .Jl.Jt * Marie C.Tetreault,Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Travelers Casualty and Surety Company of America,Travelers Casualty and Surety Company, and St.Paul Fire and Marine Insurance Company,which resolutions are now in full force and effect,reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attomeys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds,recognizances,contracts of indemnity,and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her;and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company,provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary;and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when(a)signed by the President,any Vice Chairman,any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary;or(b)duly executed(under seal,if required)by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority;and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President,any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary,and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kevin E. Hughes, the undersigned, Assistant Secretary of Travelers Casualty aRfrr w,Vy Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company,do hereby certify ttks'Pb' si €�•d. ,foregoing is a true and correct copy of the Power of Attorney executed by said Companies,which remains in full force and effect. �•` ..........•.... Dated this Januaryo20,2021 om;. •;yo's 4oww •J14, '1V4N0 ' 0' HARTFORD, , , `„uxrwsoe,'' x N.. CONN. o ' ' '• 4yy.... ..,•.... rJ� -1 s.. Kevin E.Hughes,Assi tant Secretary To verify the authenticity of this Power ofttomey,...............A us at 1-800-421-3880, Please refer to the above-named Attorney-in-Fact and the details of the bond to which the power is attached. i� ��, Washington State IV/ Department of Transportation Contractor Certification Wage Law Compliance -Responsibility Criteria Washington State Public Works Contracts FAILURE TO RETURN THIS CERTIFICATION AS PART OF THE BID PROPOSAL PACKAGE WILL MAKE THIS BID NONRESPONSIVE AND INELIGIBLE FOR AWARD I hereby certify, under penalty of perjury under the laws of the State of Washington,on behalf of the firm identified below that,to the best of my knowledge and belief,this Mil has NOT been determined by a final and binding citation and notice of assessment issued by the Washington State Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCN 49_48.082,any provision of RCW chapters 49.446,49.48,or49.52 within three (3)years prior to the date of the Call for Bids. Bidder Name:• Granite Construction Company Name � of Contr ctoradder-Printfull legal entit name of firm By: `�"l"� & "r/ James A. Prouty Signature ofauthorzed .erson Print Name of person making certifications for fon Title: Sr. Estimator plaCe: Everett, WA The of person signing certificate Print city and state where signed Date: 1/28/2021 FGrrtl:7:am, City of Marysville 36JPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of'`WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Seal GRANITE CONSTRUCTION COMPANY CERTIFICATE OF SECRETARY RESOLVED,that, effective January 1,2021 through December 31,2021,the individuals named on the attached Exhibit 1 are authorized to negotiate, execute and/or attest electronic and paper documents and contracts necessary for the conduct of the Company's affairs with respect to the submission and execution of construction project bids,bid proposals,bid addenda and all other bid-related documents prepared and submitted on behalf of the Company not to exceed$25 million,relating to any and all domestic construction projects arising out of the Company's operations. RESOLVED,that, effective January 1,2021 through December 31, 2021,the individuals named on the attached Exhibit 2 are authorized to negotiate, execute and attest electronic and paper documents and contracts necessary for the conduct of the Company's affairs with respect to the submission and execution of construction project bids,bid proposals,bid addenda and all other bid-related documents prepared and submitted on behalf of the Company not to exceed$75 million,relating to any and all domestic construction projects arising out of the Company's operations. RESOLVED FURTHER,that the authority provided for herein shall be in accordance with applicable policies,procedures, and limits of authority previously approved and the Granite Construction Incorporated Delegation of Authority and Policy then in effect. I, M. Craig Hall, Secretary of GRANITE CONSTRUCTION COMPANY, a California corporation(the"Company"), do hereby certify that the following is a true and correct copy of resolutions duly adopted effective January 1, 2021 by a Unanimous Written Consent of the Board of Directors in accordance with the provisions of Article III, Section 9 of the Bylaws of the Company;that the Directors acting were duly and regularly elected; and that the resolutions adopted have not been repealed and are still in full force and effect: ®�1t6i11je® Dated: January 1,2021 a al RUCT�,t., ' M. C g"Hall GO fow fir ti lid SEA io J34.4,1922 •C ,'®®®eif 1*111,�®e' EXHIBIT 1 AUTHORIZED SIGNERS Granite Construction Company Northwest Group Washington Region AUTHORIZED SIGNERS Michael A.Stein,VP Washington Region Sonny Chavez,Regional Controller Cevin Ladwig Sr.,Eastern WA Area Manager Paul Harding,Southwest WA/OR Area Manager Boudrey J.Smith,NW Washington Area Manager Jeremy Deemer,Construction Manager Nicholas Gerritsen,Construction Manager Jason Halverson, Construction Manager Cory Bell,Construction Manager Lance Chambers,Construction Manager Quinn Golden,Senior Project Manager Ryan Olson,Senior Project Manager Mark Ottele,Senior Project Manager Blake Amber,Senior Project Manager Travis Walken,Chief Estimator Grant Youngren,Senior Estimator J.Peter Welch,Senior Estimator James A.Prouty,Senior Estimator Steve Schlimmer,Senior Estimator Jonathon Carpenter,Senior Estimator James Gartside,Project Manager Shane Berrett,Plants Manager Andrew B.Thompson,Project Manager Cody Rettke,Project Manager Jason Styger,Project Manager Keith Majors,Material Sales Manager ATTESTORS Michael A. Stein,VP Washington Region Sonny Chavez,Regional Controller Cevin Ladwig Sr.,Eastern WA Area Manager Paul Harding,Southwest WA/OR Area Manager Boudrey J.Smith,NW Washington Area Manager Jeremy Deemer,Construction Manager Nicolas Gerritsen,Construction Manager Jason Halverson, Construction Manager Cory Bell,Construction Manager Travis Walken,Chief Estimator Grant Youngren,Senior Estimator J.Peter Welch,Senior Estimator James A.Prouty,Senior Estimator Heather Young,Estimator James Gartside, Project Manager Shane Berrett,Plants Manager Andrew B.Thompson,Project Manager Cody Rettke,Project Manager Keri Lee Gross,Office Manager Brynna Bennett,Estimating Assistant Amy Sorensen,Estimating Assistant John Newby,Estimating Assistant EXHIBIT 2 AUTHORIZED SIGNERS Granite Construction Company Northwest Group AUTHORIZED SIGNERS Michael Tatusko, Senior VP Group Operations Chris Burke, VP Nevada Region Jason Klaumann, VP Utah Region Derek Betts, VP Alaska Region Todd A.Hill, VP Arizona Region Michael A. Stein,VP Washington Region Bradly Estes,VP Construction Materials GRAflITETM Appendix A Below,to the best of my knowledge and belief, please find a list of closed and pending arbitration and litigation with Granite Construction Company within the last five (5)years. Start Date Case Name Venue Description Claim Amount Resolution 2015-01-02 GCC v.Meadow Valley Contractors,Inc.;Liberty Washoe County 2nd District Court,NV Allegations of Non-payment $115,166.94 Settled Mutual Case No.CV14-00230 2015-02-23 GCC v.CADOT(Interstate 10 Overlay) Office of Administrative Hearings— Allegations of Non-payment for delay and extra costs $247,070.15 Settled Public Works Contracts Case No.A- $247,070.15 0001-2015 2015-04-08 Safeway v.GCC Alaska District-U.S.District Court- Allegations of Breach of contract;breach of express Undefined. Judgement Anchorage Division,AK Case# and implied warranties Treble 3AN1511239CI damages pled. 2015-04-15 ECC and HW Lochner American Arbitration Association 02- Allegations of Breach of contract;negligence $53,455,461.00 Settled 0003-7129 2015-04-20 GCC v.CADOT(1-805 South)(Arb) Office of Administrative Hearings 2349 Allegations of GCC alleges defective plans&specs, $5,800,000.00 Settled Gateway Oaks Drive,Suite 200 constrained access,and conditions that differed from Sacramento,CA 95833 Case No.A- bid time. 0010-2015 2015-06-26 GCC v.CADOT(Lone Pine Cottonwood)Arb Office of Administrative Hearings 2349 Allegations of Non-payment;Breach of Contract, $864,964.51 Settled Gateway Oaks Drive,Suite 200 Breach of Warranty,Breach of Implied Good Faith& Sacramento,CA 95833 Case No.A- fair dealing$864,964.51 0013-2015 2015-07-08 GCC v.CADOT(395 Conway Summit)(Arb) . Office of Administrative Hearings 2349 Allegations of Additional costs incurred in attempt to $125,453.17 Settled Gateway Oaks Drive,Suite 200 comply with defective specification$125,453.17 Sacramento,CA 95833 Case No. A- 0014-2015 2015-08-11 City of Sacramento v.TranSystems Corporation,et al. Superior Court of Sacramento County, Allegations of Breach of contract,breach of warranty, $5,000,000.00 Settled (including GCC) CA Case No.34201500179619 and negligence$5,000,000 2015-09-30 Cemex Construction v.Tab Constructors;GCC;FIC; Superior Court of Ventura County,CA Allegations of Non-payment;enforce stop payment $141,244.00 Settled State of CA,et al. Case No.56201500469243CUORVTA notice 2016-03-17 GCC and RS and H Architects/140 Reconstruction American Arbitration Association,North Allegations of Breach of contract based on RSL&H's $3,390,322.00 Awarded (Arb) Carolina failure to meet standard of care and negligence. 2016-04-08 Safeway Inc.v.GCC(Dutch Harbor Parking Lot U.S.District Court,Anchorage,AK Breach of contract;breach of warranties$1,000,000 Awarded Repave) 2016-05-03 Robertson's Ready Mix,LTD v.San Diego San Diego County Superior Court,CA Allegations of Non-payment:enforce stop payment $122,966.34 Settled Association of Government,et al.(including GCC) 37-2016-00013474-CU-MC-CTL notice 2016-06-02 Trinity Highway Products,LLC v.DRG Fence,Inc.; Superior Court of Santa Barbara Allegations of Non-payment;breach of contract; $122,966.34 Awarded CADOT;GCC;et al County,CA Case No.16CV02289 common counts to enforce stop payment notice(GCC substituted as plaintiff against DRG) • Work/payment issues over$50,000.00 only pulled Monday, November 9, 2020 GRAnITETM Start Date Case Name Venue Description Claim Amount Resolution 2016-06-10 GCC/MCM JV v.CADOT(PIP 101)(Arb) Office of Administrative Hearings 2349 Allegations of Breach of contract including implied $1,203,308.77 Awarded Gateway Oaks Drive,Suite 200 covenant of good faith and fair dealing.$1,203,308.77 Sacramento,CA 95833 A-0012-2016 2016-08-09 North Coast Electric v.Elcon Corp.,et al.(GCC) Pierce County Superior Court,WA 16-2- Allegations of Breach of contract;bond claim $169,656.00 Settled 09861-0 enforcement By GCC$334,354.00 Against GCC $169,656.00. 11/16—GCC obtained judgment against DRG for$141,490.98.GCC settled Trinity's claim against it for$131,404. 2016-08-17 GCC v.JLR Engineering,Inc. Third District Court of Salt Lake County, Allegations of Breach of contract;default $1,719,563.61 Awarded UT Case No.160906566 2016-09-17 GCC v.Ace Engineering Kern County Superior Court,CA BCV- Allegations of Breach of contract $155,382.00 Awarded 16-102201 2016-12-09 Cell-Crete Corp and GCC(Arb) American Arbitration Association Allegations of Non-payment;delay damages;and Awarded increased costs. Against GCC$309,557 By GCC$350,000 2017-07-24 GCC v.Gonsalves&Stronck Construction Co.,Inc. Santa Cruz County Superior Court,CA Allegations of Non-payment $600,884.63 Settled 2017-08-18 GCC v.CADOT Allegations of Breach of contract;non-payment for $15,688,939.86 Pending additional work$15,688,839.86 2017-08-30 Sierra Mountain Construction,Inc.v.GCC Butte County Superior Court,CA Allegations of Conversion,trespass,and negligence $500,000.00 Settled 2017-12-15 GCC v.Deltech Engineering,Inc. Santa Barbara County Superior Court, Allegations of Breach of contract$93,390.12 $93,390.12 Judgement CA 18CV00781 2017-12-21 NGC Fund I,LLC v.City of Santa Barbara,et aI. Santa Barbara County Superior Court, Allegations of Negligence Unspecified Settled (Including GCC) CA 17CV05685 2018-05-09 Advanced Concrete Sawing&Sealing,Inc.v.GCC,et San Diego County Superior Court 37- Allegations of Breach of contract;non-payment $158,348.50 Settled al.(FIC and CADOT) 2018-00021797-CU-BC-CTL 2018-10-23 Synergy Earth Systems,LLC v.GCC U.S.District Court Northern District of Allegations of Breach of settlement agreement $310,659.10 Settled Alabama 2018-CV-01743 2019-01-14 GCC v.CADOT(805 DAR) Office of Administrative Hearings A- Action for non-payment for actual quantities of work Pending 0012-2016 _ performed 2019-03-26 GCC v.Regional Transportation Commission of Allegations of Additional costs due to unsuitable $4,371,807.00 Pending Washoe County subgrade and soils$4,371,807 2019-05-09 GCC v.Myers&Sons Construction,LP Sacramento County Superior Court 34- Allegations of Breach of contract;non-payment $2,540,011.16 Pending 2019-00256161 2019-10-04 GCC v.Mercer-Fraser Company,et al. Monterey County Superior Court Allegations of Breach of contract;non-payment Pending 19CV003948 2019-10-09 GCC v.Alta Land Surveying,Inc.(Mesa Housing American Arbitration Association,CA Allegations of Breach of contract;negligence Unspecified Settled Pedestrian and Bike Bridge UCSD 2019-11-04 GCC v.NGU Contracting,Inc.et al.(Marana Santa Pima County Superior Court,AZ Allegations of Breach of contract,unjust enrichment, Pending Cruz River Levee) C20194827 bond enforcement 2019-11-08 G&F Concrete Cutting,Inc.v.GCC Los Angeles County Superior Court Allegations of Breach of contract;non-payment $338,172.12 Settled 18STCV04125 • Work/payment issues over$50,000.00 only pulled Monday, November 9,2020 GRAIIITE" Granite Construction Company 2019 Com•feted Job Schedule Greater Than S3 Million Job ID Name and Address ofOwner Name,Location of Project,and Kind ofWork Work Type Category Prime or Name of Contractor(if Owner Contact Contract Actual Subcontractor sub) Amount Completion Date 711046 US Department Of Transportation Federal Glenn Hwy Rehab W Chickaloon Roads/Highways Prime Contractor N/A Michael Baron $11,576.563 8/29/2019 Federal Highway Administration, Contract Number.DTFH7017C00016 (360)619-7563 610 East Fifth Street Palmer,Alaska (360)619-7846(f) Vancouver,WA 98661-3801 Road Realignment,700,000 CY Ex,striping,guardrail and resurface bridge deck. michaeLbaron@dotgov 797068 Alaska Department of Transportation& Anc Taxiway R Grp VI Improve Airports Prime Contractor N/A Stephen Frey J14,700,712 6/30/2019 Public Facilities Contract Number.CFAPT0070 (907)269-0664 PO Box 196900 Anchorage,Alaska (907)243-5092(F) Anchorage,AK 99519.6900 Widen the Taxiway Safety Area for Taxiway R and rehabilitate Taxiways S,T,U,and ACP Taxilane at Anchorage International Airport to stephenfrey@dotgnv meet FAA standards for Airplane Design Group VI and Taxiway Design Group 7.Airfield lighting improvements will include rehabilitation of the taxiway centerline and edge lighting systems within the project area.Other Improvements will include storm drain system rehabilitation,obstruction removal for Runway 15-33 and underground utility adjustments. 813261 Alaska Department of Transportation& Amats:Rabbit Creek Road Pavement Preservation Prime Contractor N/A Brian Schumacher $6376,519 7/15/2019 Public Facilities Contract Number.Z585110000 (907)269-0432 PO Box 196900 Anchorage,Alaska (907)243-5092(F) Anchorage,AK 99519-6900 Resurface Rabbit Creek Rd from the old Seward Hwy to Hillside Drive.Work includes improvements to guardrail,drainage and culverts, brian.schumacher@alaska.gov signing,signalization,striping and embankments dig-outs. 795354 Ryan Companies Inc Project Wildcat Site Work Commercial Subcontractor Ryan Companies Inc Braden Rots 315,205,772 5/31/2019 3900 East Camelback Road,Suite 100 Contract Number. (480)261-05613 Fan N/A Tucson,AZ 85018-2614 Tucson,Arizona Braden.bott@ryancompanies.com Earthwork underground utilities,and Ratwork for new e-commerce facility on 85 acres.The project scope included civil/site work on an 80 acre site for a 2.5 million-square-foot fulfillment center.The project includes 50,000 CY of earthwork to be completed in four weeks(10- hour shifts,7-days per week). 800451 Pima County Procurement Department Pc Rlop Pkg S Roads/Highways Prime Contractor N/A Lany Wallace $3,803,213 1/21/2019 130 West Congress Street Contract Number.294192 (520)444-1283 Tucson,AZ 85701-1317 Tucson,Arizona F.N/A Rehabilitate residential streets by milling of asphalt and repaving,utility adjustments,pavement markings.Project includes milling. Larry.Wallace@pima.gov grading,paving,and striping sections of 4 neighborhoods within Pima County.Project activities included 190,000 SY of asphalt pavement milling,grading at all locations,30.500 TN of asphalt paving,speed hump replacement,utility adjustments,and pavement marking, 843620 City of Tucson Cot Oar Package No 1 Roads/Highways Prime Contractor N/A Gregory Orsini $6,642,987 4/30/2019 1000S Greasewood Rd Contract Number.192044 (520)837-6617 Tucson,AZ Tucson.Arizona Far(520)791-4238 In-town roadway re-constructs at five locations;to include milling,aggregate base,paving,lime treated sub-grade,flat-work,ADA ramp Gregary.Orsini@tucsanaz.gov upgrades,electrical upgrades Full depth road reconstruction,milling,aggregate base,paving,lime treated subgrade,Ratwork/ADA upgrades,electrical upgrades and striping. 838044 Freeport Mcmoran Corporate Fmi Siemita Pipe Crossing Mining Prime Contractor N/A Cody McGrath S6,917,889 12/24/2019 333 North Central Avenue Contract Number.N/A (520)393-2765 Phoenix,AZ Green Valley,Arizona Fax N/A The project began with the construction of two concrete pipe crossings totaling over 250 cy and 11,000'of relocated 30'and 36'HDPE cmgrath@fmtcom waterline.The owner changed ordered into the contract and earthen buttress totaling 1,600,000 cy,10,000 tons of excavated rip rap down drain spillways and 126 acres of hydro seed.The entire project was self-performed by Granite's workforce. 810330 Pima County Procurement Department Pc Fy 18/19 Arterial Collector Transportation Prime Contractor N/A Greory Orsini $3,357,613 2/22/2019 130 West Congress Street Contract Number.299290 (520)837-6617 Tucson,AZ B5701-1317 Tucson,Arizona Fax(520)791-4238 Project includes milling,paving,and striping sections of 13 arterial roads within Pima County,each location varying between 1 to 3 miles cmgrath@fmi.com -in length.Project activities included 270.000 SY of asphalt pavement mining,33,500 TN of asphalt paving,utility adjustments,pavement markings,and detections loops in two locations. 928057 City of Tucson Cot Fy 19 Rd Rec Rehab Pck 2 Transportation Prime Contractor N/A Greory Orsini $3,964,118 11/1/2019 1000 S Greasewoad Rd Contract Number.192204 (520)837-6617 Tucson,AZ Tucson,Arizona Fax(520)791-4238 The project consisted of fun depth roadway reconstruction of local arterial streets;the project included complete removal of the existing cmgrath@fmi.com roadway section and replacement with lime treated subgrade,aggregate base and multiple lifts of asphalt using fiber reinforcement and a polymer modified binder to help extend the longevity of the roadways design(Ie.The project also included upgrades to the misting traffic signals,signing/striping as well as upgrades to the surroundingcurb/flatwork and ADA ramps where required. Appendix tot e Updated:March 2020 GRAIIITE Granite Construction Company - 2019 Corn•feted Job Schedule Greater Than S3 Million Job ID Name and Address of Owner Name,Location ofProject,and Hind of Work Work Type Category Primeor Namen f Contractor(If Owner Contact Contract Actual Subcontractor sub) Amount Complellon Date 690428 City of Goleta Hollister Class 1 Bike Path Roads/Highways Prime Contractor N/A Andrew Borrel6 54,533,686 12/31/2019 130 Cremona Drive Contract Number 2017-017 (805)966-2224 Goleta,CA 93117-5514 Goleta,California Fax N/A Construct Class 1 Bike and Pod Path,approximately 1,600 cy of concrete.Approximately 7,500 tons of HMA paving installed far pavement aborrelli@mnsengineers.com rehabilitation.Includes new median construction,landscaping,and new striping. 761418 State of Califomia Department of Caltrans Emergency Work-Thomas Fire Flood Damage Roads/Highways Prime Contractor N/A Jason Kline $20,050,000 5/30/2019 Transportation Contract Number. (805)698-2393 Fax.N/A 1727 30th Street Montecito,Califomia jason.kine@dotcagov Sacramento,CA 95816-7005 EMERGENCY WORK-CLEAR/REMOVE MUDSLIDE DEBRIS HWY 101/MONTECITO CA 805426 City of Santa Barbara Gutierrez St Bridge Replace Bridge Only Prince Contractor N/A Tim Gaasch 55,468.786 10/22/2019 630 Garden Street Contract Number.3670 (805)564-5377 Fax N/A Santa Barbara,CA 93101-1656 Santa Barbara,California tgaasch@santabarbaracagov Remove&Replace Gutierrez St bridge over Mission Creek with concrete channel walls, 842209 City of Santa Barbara City of Santa Barbara 2019 Pavement Maintenance Transportation Prime Contractor N/A Tim Gaasch $6,536,414 5/21/2019 630 Garden Street Contract Number.3928 (805)564-5377 Fax N/A Santa Barbara,CA 93101-1656 Santa Barbara,California tgaasch@santabarbaraca.gav Asphalt cligauts to repair failed areas,tree root pruning,concrete curb&gutter replace asphalt cold mill asphalt hot ma overlay, truncated domes,curbs,striping,signs,roadway name stamps, • 865302 State of California Department of Hwy 1 Cambria RHMA-O Transportation Prime Contractor N/A Rick Silva 53,540,241 9/19/2019 Transportation Contract Number.05-1K3004 (805)927-4559 Fax N/A 1727 30th Street Cambria,Califomia rick.silva@dotca.gov Sacramento,CA 9 5 816-70 0 5 841434 State of Califomia Department of Caltrans 09-365904 Lone Pine SR-136,395 Transportation Prime Contractor N/A Chris Talbot,RE 45,49E 035 10/29/2019 Transportation Contract Number.09-365904 (760)937-8948 Fax N/A 1727 30th Street Lone Pine,Califomia chris.talbot@dotcagov Sacramento,CA 95816-7005 Cold plane and place hot mix asphalt and install roadside signs AT AND NEAR LONE PINE ON SR-136 AT SR-395 AND ON SR-395 FROM 12 MILES SOUTH OF SR-136 TO EAST INYO STREET;2.8 miles near Diaz Lake to the south end of Lone Pine Work performed on 2 lanes in each direction and a paved median throughout a large portion of the project We cold planed 138,537SY and paved 28,845TN of HMA. Our subcontractors removed and replaced in excess of 50 roadside signs and striped approximately 100000LF. 683674 State of Califomia Department of Highways 1,9,35&236 Emergency Slide Repairs,Santa Cruz County Roads/Highways Prime Contractor N/A Jennifer Wilson,Resident Engineer 57,534,520 12/10/2019 Transportation Contract Number.05-1H7904 (805)471-2103 1727 30th Street Santa Cruz County,California Fax:N/A Sacramento,CA 95816-7005 Remove Slides,Restore Roadway-Granite performed storm damage cleanup.Granite did a8 of the following soldier beam wall,deep lift jenniferwilson@dotcagov paving,hilfkerwall,and crib wall reinforcement 77834E State of Califomia Department of Hwy 68 Cold Plane&HMA-O Overlay Roads/Highways Prime Contractor N/A Tyler Layering,Resident Engineer ' 53,230,825 6/28/2019 Transportation Contract Number.05-1G4504 (831)375-1621 1727 30th Street Monterey,California Fax(831)375-1621 Sacramento,CA 95816-7005 Cold plane,overlay 1,550 TN hot mix asphalt and 4,930 TN HMA-0,along with rumble strips,guardrail and 250 LF concrete bonier. tyleclavering@dotca.gov Updated:March 2020 Appendix 2af 8 GRAnITE Granite Construction Company - 2019 Com•feted Job Schedule Greater Than$3 Million Job ID Name and Address of Owner Name,Location of Project,and Kind of Work Work Type Category Prime or Name of Contractor(if Owner Contact, Contract Actual Subcontractor sub) Amount Completion Date 801169 City of Monterey North Fremont Street Bike/Ped Improvements Transportation Prime Contractor N/A Andrea Benny,Principal Engineer 58,522,910 6/4/2019 580 Pacific Street Contract Number.37C1856 (831)646-3447 Monterey,CA 93940 Monterey,California Far(831)646-3405 Demolition of misting improvements,construction of Class IV hike lanes,sidewalk median modifications,shared bicycle/bus lane,ADA Bnny@monterey.org upgrades,signal modifications,and conforming new improvements to existing site conditions on North Fremont Boulevard. 787341 Sequel Union Elementary School District Sequel Unified Elementary School District,Earthwork&Paving at Four Schools Infrastructure/Site Dev Prime Contractor N/A Michelle Kennedy 53,681,471 8/9/2019 620 Monterey Avenue Contract Number.BID PACKAGE A Assistant Superintendent Capitals,CA 95010 Capitela,California (831)464-5632 Site work at 4 pubic school sites,including:Site Demo;Earthwork;Subgrade Preparation;Base and Paving;Construction of Bioswale; Fax(831)479-7182 Handrail and Fencing. mkennedy@suesd.org 860611 Vistra Energy Vistra Moss Landing BESS Concrete Structural Modifications Infrastructure/Site Dev Subcontractor Bums&Mcdonnell David Warakomski 511,187,436 9/30/2019 Hwy 1&Dolan Road Contract Number.110288 Engineering CO Inc (989)423-9371 Moss Landing,CA 95039 Moss Landing,California djwarakomski@hurnsmcd.cam Project consisted of modifying the misting turbine facility to accommodate 300MW of Batteries.Granite's scope included backfiling Sean P.Kenny,PE existing voids within misting floor of the building,placing 6'thick and 8'thick concrete slabs,and installing 22'thick elevated slabs for (657)286-9117 second floor battery storage. spkenny@bumsmcd.com 865875 County of Santa Cruz Chanticleer Pak Phase 1 Infrastructure/Site Dev Prime Contractor N/A Will Fourt $3,434,153 1/22/2020 701 Ocean Street Suite 330 Contract Number.18C1-004 (831)454-7910 • Santa Cmz,CA 95060 Santa Cm;California willfourt@santacmzcounty.us Construction of neighborhood park,including:erosion control;relocation of public artwork earthwork;drainage;construction of bioretention areas;sanitary sewer,domestic water line;site electdcak onsite parking;concrete planters and seat walls concrete flatwork; planting and irrigation;site furnishings and playground equipment and playground safety surfacing. 813966 City of Dublin Dublin Blvd Widening Transportation Prime Contractor N/A Michael Boitnott Capital Improvement 56,662,122 2/28/2019 100 Civic Plaza Contract Number.ST1012 Pmgram Manager, Dublin,CA 94568-2658 Dublin,California (925)833-6630 Street widening,including removal of 6,210 LF concrete curb&gutter and 26,000 SF of sidewalk;removing 27,500 SF of asphalt concrete Fax(925)829-9248; pavement slurry seal parking lot,maintaining traffic and furnishing traffic control throughout construction,replacement of traffic signals michael.boitnott@dublin.ca.gov and related facilities,installation of 25,000 SF of sidewalk paving,7,200 LF of curbs and curb&gutters,placement of 5,300 TN of Hot Mix Asphalt Concrete,installation of a pedestrian bridge,adjusting utility facilities,street lights,landscaping,irrigation,drainage improvements,installation of thermoplastic traffic stripes and pavement markings and reflective pavement markers,and installation of traffic signs. 924183 City of Pleasanton Pleasanton Annual Street Resurfacing and Preventative Maintenance Transportation Prime Contractor N/A Huy Ho,PE S3,894,965 11/15/2019 • P.O.Box 520 Contract Number.18503 (925)931-5663 Pleasanton,CA Pleasanton,California Fax(925)931-5479 City street resurfacing,including:14,703 TN of overlay and 256,097 SF(6,551 TN)of AC digeuts;paving mat,crack sealing,pavement Hho@cityofpleasantoncagav striping and marking,parking lot widening; 788409 State of California Department of Sherwood Rd Geometric Upgrades Transportation Prime Contractor N/A Nash Munes $4,587,797 6/1/2019 Transportation Contract Number.01-262044 (707)223-0791 Fax N/A 1727 30th Street Willits,California Email:N/A Sacramento,CA 95816-7005 State Highway 101 and city streets in Willits from 0.7 mile North of Route 20 to 0.9 mile North of Route 20 and Sherwood Road.Performed geomettric upgrades including removal and replacement of curbs,gutters and sidewalks. Updated:March 2020 Appendix 3o1 8 GRA111TE • Granite Construction Company • 2019 Com•leted Job Schedule Greater Than$3 Million job ID Name and Address of Owner Name,Location of Project,and Hind of Work Work Type Category Prime or Name of Contractor(If Owner Contact. Contract Actual Subcontractor sub) Amount Completion Dale 815011 State of California Department of Highway 20-175 Fire Rehab Roads/Highways Prime Contractor N/A Dan Kraft $7,443,708 12/31/2019 Transportation Contract Number:01-0t3704 (707)994-5074 Fax N/A 1727 30th Street Lakeport,Calilomia • dan.kraft@dotca.gov Sacramento,CA 95816-7005 Emergency work to repair fire damaged areas of Hwy 20 and Hwy 175 in lake County due to wildfires.Work consisted of repairing and/or replacing guardrails,drainage systems,pavement,fencing,guardrail vegetation barriers,and roadside signs.Traffic control,hazardous tree removal,SWPPP and erosion control were also included. 821889 State of Califomia Department of Hwy 20-29 Culvert Replacements Transportation Prime Contractor N/A Dan Kraft 43,594,616 11/1/2019 Transportation Contract Number.01-427804 (707)994-5074 Far N/A 1727 30th Street Lake County,California dan.kraft@dotca.gov Sacramento,CA 95816-7005 Drainage system improvements to various culverts located on Highway 20 and Highway 29 in Lake County.Work consisted of removing existing failing culverts and replacing approximately 2500 LF of polymer coated cot negated steel pipe,2,500 LF of cured in place pipe liner, 100 LF box culvert.Five concrete headwalls including slurry backfill and trench paving. 810982 City of Indio Madison Street Improvements Transportation Prime Contractor N/A Tom Rafferty 46,921296 8/29/2019 Civic Center Mall Contract Number.ST503K (760)391-4017 Fax N/A Indio,CA 92201-4434 Indio,California Email:N/A Widen Madison Street The work includes asphalt paving,concrete construction,drainage installations,traffic signal installations, landscaping and irrigation,water relocations and upgrades,traffic contort surveying,conduit installation,wall installation,raising utilities, pot-holing,and related work to widen a four lane road. 812398 City of El Centro Ec Labrucherie Ave Widening In, Roads/Highways Prime Contractor N/A Abraham Campos $3,242,668 5/17/2019 1275 Main Street Contract Number.N/A (760)337-4505 Far N/A El Centro,CA 92243-2816 El Centro,California Email N/A Widen city street full depth replacement PCC curb,sidewalk,driveway,storm drain,manholes and signal fight 832465 BNSF Railway Company Barstow Interim Intesmodal Fac Transit/Rails Prime Contractor N/A Miguel Peloino 515,414,578 5/1/2019 2301 Lou Menk Drive Gob 1W Contract Number.BF10014160 (909)841-0040 Fax N/A Fort Worth,IX Barstow,California Email N/A This project consisted of the clearing and demolition of structures within the project footprint,the construction of two(2)3,100 IF working tracks and a 16 acre parking lot located on the southwest side of the BNSF Barstow Yard.Also includes grading,drainage,relocation of water mains,sanitary sewer,a lift station,a 12'x40'modular building,a gate booth,a Crane maintenance Canopy,concrete crane maintenance pads,a 40'crane maintenance storage container,asphalt paving,concrete craneways,electrical work including 7 highmast fights,fencing, pavement markings and relocation of a fiber-optic ductbank. 846699 County of Riverside Box Canyon Road Repair Roads/Highways Prime Contractor N/A Hector Davila 43,000,000 3/31/2019 PO Box 1090 Contract Number:4 5-1 91 9 0101 (909)677-8888 Far.N/A Riverside,CA 92502-1090 Mecca,Califomia HeDavila@rrvco.org Storm damage repair work 856867 State of California Department of 08-111804110 Digouts Overlay Transportation Prime Contractor N/A Khoi Vu 43,792,317 4292019 Transportation Contract Number.0 8-111 8 0 4 (951)232-6263 Fax N/A 1727 30th Street Desert Center,California Khoi.vo@dotca.gov Sacramento,CA 95816-7005 Project included HMA digouts at bridge approaches and departures alaong a 35 mile section of 110 for both east and west bound lanes. 874727 Bather Motorsports Park LLC Barber Motorsports Park Transportation Prime Contractor N/A Mark Whitt 55,239,676 8/312019 6030 Barber Motorsports Parkway Contract Number. (205)699-7275 Far N/A Birmingham,AL Birmingham,Alabama mwhitt@barbennuseure.org Repave race track 876151 County of Riverside No Indian Cyn And Gillman Spr • Transportation Prime Contractor N/A Tustin Robbins $4,768,120 11/15/2019 PO Box 1090 Contract Number.C6-0089 AND C9-0059 (951)237-4280 Fax N/A Riverside,CA 92502-1090 Moreno Valley,California jmbbins@rivco.org North Indian Canyon Drive,Widening Project Phase 1,29th Avenue to 18th Avenue,Cities of Palm Springs and Desert Hot Springs and Gilman Springs Road Resurfacing,Moreno Valley City Limit to State Highway 79,Gilman Hot Springs Area Updated:March 2020 Appendix 4of 8 GRAIIITE Granite Construction Company -- - -- - 2019 Com•feted Job Schedule Greater Than$3 Million job ID Name and Address of Owner Name,Locution of Project,and Kind of Work Work Type Category Primeor Name of Contractor(If Owner Contact Contract Actual Subcontractor sub) Amount Completion Dote 715392 American Honda Motor Company Pd Honda Ride Roads Roads/Highways Prime Contractor N/A Jason Kist S5,054.358 1/15/2019 1919 Torrance Blvd,Bldg 320 Contract Number. (310)783-013 Torrance.CA 90501-2746 Cantil,Caiifomia Fax N/A Grade/Base/Ac/Concrete Email:N/A 748229 Limoneira Lewis Community Builders LLC Vt Limo neira East Area 1 Roads/Highways Prime Contractor N/A Tony Marro $19,429,000 1/30/2019 1156 North Mountain Ave Contract Number EA-1-LIMONEIRA (805)823-3278 Upland,CA 91786 Santa Paula,California Fax N/A Site rough grading 370 crease flat to gentle incline The area to be graded consists of approximately 370-acres of mostly flat to gently tony.marro@Iewismccom incline terrain located between Telegraph Road on the south,ascending hillside terrain on the north,Haun Creek on the east and Santa Paula Creek on the west In general rough grading will consist of unclassified/common excavations involving mass excavation,lot and street over excavations,unsuitable soil removals,handling of oversize rock materials,site finish grading,SWPPP/dust control related activities and compliance Alternate bid work consists of excavations for deep utilities,and top-loading and processing of overly moist fill materials,and handling/compacting import provided by others. 802688 Mian Development Corporation Vt Camarillo Hills Drain Imp Pavement Preservation Subcontractor Mian Development lobe Mathews $4,989,622 2/1/2019 24150 Park Sorrento Contract Number.04-13 Corporation (8051 660-0751 Calabasas,CA 91302-4101 Camarillo,California Fax N/A Demolition of existing concrete channel.Placement of new twin RCS precast culvert approximately 1,200 If ` Emaik N/A 813799 Palmdale,City Of Pd 2018 Arterial Overlay Pmgr Roads/Highways Prime Contractor N/A David Wu S3245,497 1/31/2019 38300 N Sierra Hwy Contract Number.748 (661)267-5338 Palmdale CA 93550-4798 Palmdale,California Fax N/A construction of a 2'TRMAC overlay on sections of 3 different arterial streets in the City of Palmdale;The work may consist of,but is not Email:N/A limited to:traffic control plan design&implementation,asphalt grinding,TRMAC paving,thermoplastic striping,traffic loop restoration, and utility/survey monument adjustment 825479 First Solar Electric Pd Phoebe Solar Power Subcontractor First Solar Electric Inc Luke Adams S17,886,491 5/16/2019 350 West Washington Street Contract Number- Phone Number. Tempe,AZ 85281-1496 Kermit,Texas Fax N/A Installation of 120.0004761(15'structural H beam bearing piles.Mechanical installation 9,000 rows of NEXTracker Horizon single axis lueas.adams@frstselar.mm solar tracker.3,000 acre,250 MW utility scale solar installation. 856991 Rio Tinto Materials Pd Rio Tinto Pond Retrofit Mining Prime Contractor N/A Roni Lima 45,390,387 13/312019 14486 Borax Road Contract Number.CW2129657 (760)762-7000 Boron,CA Boron,California Fax N/A Site grading,concrete rehabilitation,sump and pump installation,concrete pad placement HDPE liner placement Electrical component Emaik N/A installation. 831626 State of California Department of Hay 1-5 Near Huron Transportation Prime Contractor N/A Din Daddawalla 112,140,069 7/31/2019 Transportation Contract Number.06-000804 (559)417-5927 1727 30th Street Cantua Creek,California Fax N/A Sacramento,CA 95816-7005 Panel replacement cold plane,HMA and RHMA paving,and MGS.Road Reconstruction&RHMA Overlay dindaddawalla.dotca.gov 692674 State of Caiifomia Department of FrJ-S Rhma Overlay-Las Banos Transportation Prime Contractor N/A Brent Haroldsen 530,235,993 7/31/2019 Transportation Contract Number.10-1H4104 (559)246-6410 Fax N/A 1727 30th Street Las Banos,Caiifomia brentharoidsen@dotcagov Sacramento,CA 95816-7005 10'RHMA Overlay and shoulder improvements for 17 Miles on I-5. 860502 State of California Department of Hwy 99 Betty Drive Transportation Prime Contractor N/A Mandip S.Sandhu S10,154,485 9/30/2019 Transportation Contract Nov 06-471504 (559)246-9433 1727 30th Street Tulare County,CA Fax(559)243-3825 Sacramento,CA 95816-7005 The new interchange encompasses a new Betty Dr.oveicrossing with signafized on and off amps.Several surrounding County of Tulare roadways will be improved with widened travel lanes,signalized intersections,upgraded roadway surfaces and a new storm drain system and basins.SR99 will be upgraded with emergency shoulders a new pumping plant to handle the storm water below the new overcrossing. 715242 Pacific Gas and Electric Company PG&E Lemoore Center Substation Subcontractor Roebbelen Contracting,Inc. Roebbelen Contracting,Inc 13,961,346 9/11/2019 245 Marker Street Contract Number.21-16-400 1241 Hawks Flight Court San Francisco,CA 94105 Lemoore,Caiifomia El Dorado Hills,CA 95762 Sitewark,Grading,Concrete Sw/Curbs and Parking lot paving Updated:March 2020 Appendix Sof 8 GRAIIITE Granite Construction Company - 2010 Com•feted Job Schedule Greater Than$3 Million Job ID 'Name and Address of Owner Name,Location of Project,and Kind of Work Work Type Category I'rlme or Name of Contractor(If Owner Contact Contract Actual Subcontractor sub) Amount Completion Date 778210 State of California Department of FR_HWY I-5 near Lost Hills Transportation Prime Contractor N/A Sunil Gandrathi $18,197,700 1/11/2019 Transportation Contract Number.06-054904 (559)999-5733 1727 30th Street Kettleman City,Califamia Fax N/A Sacramento,CA 95016-7005 Replace faired concrete slab sunil.gandrathi@dot.cagov 831626 State of California Department of Hay l-5 Near Huron Transportation Prime Contractor N/A Din Daddawalla 312,140.069 8/27/2019 • Transportation Contract Number.06-000004 (559)417-5927 1727 30th Street Cantua Creek,California Fax N/A Saoramento,CA 95816-7005 Panel replacement cold plane,HMA and RHMA paving,and MGS.Road Reconstruction&RHMA Overlay. dindaddawaladotcagov 859586 Spsg Partners SacPacific Heights Dump Fc Environmental Prime Contractor N/A Todd Thalhamer 49,912,188 12/31/2019 4010 West Chandler Avenue Contract Number.l (916)341-6356 Santa Ana.CA Oroville,California (530)391-2230 Recycle debris from Widfore todd.thalhamer@calrecycle.ca.gov 796267 State of California Department of Hwy 79 Julian Bwc Roads/Highways Prime Contractor N/A Rene Figueroa 46,42E601 1/24/2019 • Transportation Contract Number.11-2N0184 (858)688-1551 1727 30th Street Julian,California Fax N/A Sacramento,CA 95816-7005 Apply Bonded Wearing Course Overlay,Shoulder Backing and Cold Plane. rene.8gueroa@dotca.goc 814459 San Diego County Regional Airport Authority Rehab Cross Taxiways Airports Prime Contractor N/A Ted Rigo 47,262,361 3/21/2019 3225 North Harbor Drive Contract Number.104220R (303)908-4052 San Diego,CA 92138-2776 San Diego,Califomia Fax N/A The project provides rehabilitation of Cross Taxiways 131,64-137.C3,C4,and C6,which includes milling and overlay nominal 5 to 6-inch full • depth replacement of asphalt pavement approximately 260,555 square feet of pavement surface;removal and replacement of failed subgrade;reconstruction of a portion of Taxiway B1 with concrete pavement;relocation ofwestem edge of pavement and associated edge marking,fighting and taxiway signs,realignment of Taxiway C6 including construction of new Taxiway full strength and shoulder pavement,mill and asphalt inlay.This brings the total area to about 294,595 SF;and airfield fighting relocation,replacement of impacted striping,marking, 730763 Port Of Pasco Pas-Pop General Aviation Apron Airports Prime Contractor N/A Lee Unterwegner,P.E. $4,826,147 9/18/2019 PO Box 769 Contract Number.3-53-0046-044 (509)783-2144(0) Pasco,WA 99301-1211 Pasco,Washington (509)360-7900(F) Reconstruction of appro.60,000 SY of the airport.Removal of concrete pavement,excavation,subgrade prep.,placement of stoma water Iju@gub.com pipes,catch basins,trench drains,peercolation trenches,CSBC,HMA,aircraft tie doesn,apron fighting and pavement markings. 863786 State of Washington Department of Wen-Ncr Seal 2019 Transportation Prime Contractor N/A Brian Person 48,358,140 10/1/2019 Transportation Contract Number:9365 (509)667-2881 Fax N/A PO Box 47420 Okanogan,Grant County and Mattawa Washington penrson5@wsdotwa.gov Olympia,WA 98504-0001 Removing misc.traffic items,removing guardrail,pavement repair excavation,roadway excavation incl haul,embankment compaction, crushed surfacing base haul,emulsified asphalt,asphalt for fog seal furnishing and placing crushed screenings,crack sealing,HMA for preleving and pavement repair and other work. 7136125 State of Washington Department of Bhm Sr9&Sr20 Park Cottage Roads/Highways Prime Contractor N/A Shane Spahr 43,284,277 5/29/2019 Transportation Contract Number.9221 (360)848-7103 Fax N/A PO Box47420 Sedro Woolley,Washington spahrs@wsdoLwa.gov Olympia,WA 98504-0001 Mainline HMA paving,Fog seal,curb/gutter,sidewalk,pedestrian curb,raising utilities,planing bitumiNous pavement,striping 853077 State of Washington Department of Evt Sr104 Vic-164Th St Paving Transportation Prime Contractor N/A Shawn Neil Wendt P.E 47,627,820 11/30/2019 Transportation Contract Number 9330 (425)225-8726 Fan N/A PO Box 47420 Mountlake Terace Washington wendts@wsdotwagov Olympia,WA 90504-00D1 22 miles of northbound I-5 between SR 104 and 212th Street Southwest in Mountlake Terrace.Crews ground off about two inches of asphalt and epaved it with fresh asphalt The crews eke repaved the ramps connecting 1-5 with the 164th Street interchange north of Lynnwood. • 857279 State of Washington Department of Bhm I-5 To Britton Paving Transportation Prime Contractor N/A Melissa Ambler 44,745,198 10/21/2019 Transportation Contract Number.9362 (360)788-3400 Fax N/A PO Box 47420 Bellingham,Washington amblerme@wsdotwagev Olympia,WA 98504-0001 Crews Repined three miles of State Route 542 in both directions between 1-5 and Britton Road.Highway crossings were improved,a culvert replaced near Dewey Road and in partnership with city of Bellingham,a stretch of sidewalk was added near Applebee's.These improvements provide Bellingham area drivers,cyclists and pedestrians smoother and easier access along this busy stretch of SR 542. Updated:March 2020 Appendix 6of 8 GRAflITE Granite Construction Company - - 2019 Corn•feted Job Schedule Greater Than S9 Million Job ID Name and Address of Owner Name,Location of Project,and Kind of Work Work Type Category Prime or Name of Contractor(if Owner Contact Contract Actual Subcontractor sub) Amount Completion Date 9071132 State of Washington Department of Oly SrB Us12 To Wilson Paving Transportation Prime Contractor N/A John Romero S3,313,283 10/20/2019 Transportation Contract Number.9411 - (360)870-2994 Fax N/A PO Box 47420 Elma,Washington Romeroj@wsdotwa.gov Olympia,WA 98504-0001 Improvement of 13.75 miles of SRB in Grays Harbor County and Thurston County.Pavement repair,planing bituminous pavement,paving with HMA CL 1/2'PGSBH-22,removing monument cases and covers,modifying expansion joint sealson bridges,resurfacin gbridge deck and replacing waterporrof membranes on bridges,pavement markings,delineation,traffic control in accordance with contract plans. • 652565 Nevada Department of Transportation SR 28 Shared Use Path-Pedestrian Bride Roads/Streets Prime Contractor N/A Nick Johnson,PE S37,244,818 12/31/2019 1263 South Stewart Street Contract Number.3671 (775)430-0995 Carson City,NV 89712-0001 Incline Village,Nevada Fax N/A Construction of a 10 foot wide Shared Use Path for Pedestrians and Bicycles.Retaining walls,tunnel crossing,pedestrian rail grading,rock Email:njohnson@dotstate.nv.gov fracturing,tree removal,drainage,rumble strips,guardrail barrier mils,erosion control paving,grading,retention basins,culverts, shoulders and bridge construction. 834545 Nevada Department of Transportation NDOT 3739 US 50 Clear Creek Roads/Highways Prime Contractor N/A Bhupinder Sandhu $8,271,003 12/31/2019 1263 South Stewart Street Contract Number.3739 (775)434-3458 Fax:N/A Carson City,NV 89712-0001 Gardnerville,Nevada bsandhu@dotstatenv.gov Multiple storm drains,drop inlets,trench drains,slope flattening,grading,concrete curb,gutter,channel work guardrail and concrete barrier rail. 772612 O&D Construction,Inc. Poulakidas Elementary Sitework Infrastructure/Site Dev Subcontractor O&D Construction,Inc. Washoe County Schools District S3,531,9(15 5/30/2019 1050521st St South Contract Number.15079 (775)34B-0200 Fax N/A Sparks,NV Reno,Nevada Mass grading,base,paving,striping,electrical and curb and gutter. 848241 Nevada Department of Transportation NDOT 3702 Ready Kietzke[ample Transportation Prime Contractor N/A Sam Thompson 13,005,595 7/31/2019 1263 South Stewart Street Contract Number.3702 (775)888-7070 Far.N/A Canon City,NV 89712-0001 Reno,Nevada Email N/A Pedestrian and ADA Improvements.Curb,Gutter,Base,Paving,sidewalk and ADA Ramps. 730529 Kennecott Utah Copper Ewr Mine Access Road Mining Civil/Site Infra Prime Contractor N/A Eric Eatherton S4,061,574 3/31/2019 B362 West 10200 South Contract Number.3102/307775 (801)569-6261 Fax N/A Bingham Canyon,UT 84006-1197 Bingham Canyon,Utah enceathertan@riolnta.com Project was to dump mine trucks to create new access mad alignment This new alignment was needed to expand the mine dumps to the East creating new dump area Granite dumped and dozed appmimatey 2 million TN of material. 800463 Snowbird Resort LIC Snowbird Bridge Bridge Only Prime Contractor N/A Idima Mahak S3,056,875 3/31/2019 9385 S.Snowbird Center Dr Contract Number. (801)634-4375 Snowbird,UT Snowbird,Utah Fax N/A The Pedestrian Bridges at Snowbird provides guests easier and safer access to the Cliff Lodge,Snowbird Center and Peruvian Lift.The 70- nmahak@snowbird.com foot Peruvian Bridge provides direct access,over Little Cottonwood Creek connecting the Peruvian Lift to the Snowbird Center and Aerial Tram.The 400-foot Chickadee Bridge has three sections that am mostly covered with three landings and connects the Cliff Lodge Hotel to the Snowbird Center and Aerial Tram.Guests can rest at each of the landings and take in the incredible scenery of the natural surroundings.The Snowbird Bridges greatly improve the overall visitor experience and safety while preserving skiing pathways that pass underneath. 806048 Kennecott Utah Copper Tailings Capping Mining Civil/Site Infra Prime Contractor N/A Ryan Bradley S6,644,758 12/31/2019 B362 West 10200 South Contract Number.3103314188 (801)652-5794 Bingham Canyon,11T 84006-1197 Magna,Utah Fax N/A This project was the reclamation of tailings dumps at the KUC tailing area in Magna UT.Granite regraded the routing tailing dumps to a ryan.bradley@riotinto.com 2.5:1 slope to decreaseoverall slope When regrade was complete Granite hauled 213,000 TN of cover material and placed on slopes so • vegatation can begin growing. • Updated:March 2020 Appendix 7of 8 GRAIIITE Granite Construction Company - - - - 2019 Com•feted Job Schedule Greater Than S3 Million job ID Name and Address of Owner Name,Location of Project,and Kind of Work Work Type Category Prime or Name of Contractor(If Owner Contact Contract Actual Subcontractor sub) Amount Completion Date 818764 Ogden City Corporation Hinckley Airport Airports Prime Contractor N/A Charles Kellerman S5,500,561 7/1/2019 2549 Washington Blvd.,Suite 761 Contract Number.3-49-0024-048-2018 (303)782-0882 Ogden,to 84401 Ogden,Utahe project was a major maintenance project that include work on every taxiway.Two taxiways were milled and ovedayed(3703 Fax N/A Ton),one was ovedayed and reprofiled(11,485 ton),one was completely rebuilt(6,947 ton)and one was removed and reconstmcted on a ckellermon@adgairports.cam new alignment(5,257 ton).The two that were rebuilt included new stormdrain(5,5001f)and electrical.The oveday portion did include new decrial as well.Granite did have some additional maintenance work that included excavating a setteling pond and restriping some parking areas as well The project began in fall of 2018 and was suspended throught the winter.Granite reconveined in spring of 2019. 5.5M in total revenue. 846143 Utah Department of Transportation Sr-55;Price Bridge Rehab Bridge Only Prime Contractor N/A Brent Hadfield 34,669,140 9/302019 4501 South 2700 West Contract Number.F-0055(18)0 (435)820-4774 Salt Lake City,UT 84107-1430 Price,Utah Fax N/A The Price Bridge Rehab project featured the removal and replacement of its bridge deck which spanned 680 feet over the Union Pack bhadfield@utah.gov Rail Road and Price Main Street The bridge deck was approximately 34,446 SF and was replaced with partial depth,precast panels,827 CY of low shrink-fiber reinforced concrete for the deck and 300 CY of AA(AE)Structural Concrete for all other items.The bridge deck received a thin bonded polymer overlay,pre-fabricated deck drains/down spouts,expansion joints and a new black vinyl schedule 80 fence along the north parapet&sidewalk curb walL The project also replaced the asphalt approaches(roughly 600 TNs),followed by with chip seal and precast barrier. 846153 Utah Department of Transportation 2700 North Roads/Highways Prime Contractor N/A lace Mecham S5,476,149 11/30/2019 - 4501 South 2700 West Contract Number.F-0134(21)11 (435)230-29139 Salt Lake City,UT 84107-1430 West Haven,Utah Fax N/A This was considered a tealfice choke point correction on 1-15 off ramp to 2700 N.91,473 SY of Milt 16,277 TN Overlay HMA with 112,485 SY BWC.8.725 CY material removed for widenings,with C&G and sidewalk imporvements throughout the project.5 signaled intersections were widened and traffic lanes added.The project coordinated with Union Pacific RR for an entire RR crossing rebuild. 836915 Florida Department of Transportation Hafb Runway Rehab Transportation Prime Contractor N/A April Williams 05,285,795 7/3/2019 605 Suwanee Street Contract Number.850-330-1617 april.williams@dotstate.8.us Tallahassee,FL 32399 Pensacola,Florida Emergency Repair Contract-Replacement of Post Tensioned Tendons fora Precast Segmental Bridge Updated:March 2020 Appendix Bof 8 GRAnITE TI Banking Reference BANK OF AMERICA Mukesh Singh,Vice President One Bryant Park, 18th Floor New York, NY 10036 (646) 743-2640 Email: msingh64@baml.com Company has maintained a banking relationship since 1931 Accounts:various Line of Credit as of September 30, 2020: Credit Line: $275,000,000 Available: $155,928,336 Against Line: $119,071,664 Secured by Equipment and Real Property holdings Expires/matures: 5/31/2023 Security Required: Yes Bank Rating: A+/Aa2/AA Updated November 2020 Appendix Page 1 of 1 GRAr1ITE" Granite Construction Company Construction Experience of Key Personnel Western Washington Region Name Years of Experience Monetary Value of Work ___ _____Ty_pe of Work Job Capacity Vance Aeschleman 26 Over$150M A,B,I,J,M,O,P PM, EST Blake Ambler 13 Over$100M A,B,F,M,P PM, EST Kyle Aamot 7 Over$50M A, F I,L,M, P PE, EST Russell Bassett 5 Over$50M A,B PE Luke Bentley 11 Over$75M A,B,E,F,G,I,J,L,M,O,P PM, EST McCall Booth 6 Over$25M A,B,P PM Bill Brickey 19 Over$200M A,E,G,H,I,M,N,O,P OM Lance Chambers 8 Over$150M A,B,F,L,P PE, EST Steve Chambers 31 Over$200M A, B, E, F,H, I, M,O, P SUPT Jacob Critcher PE, EST Jeremy Deemer 29 Over$200M A,F,G,I,J,P AM Beth Duffus 12 Over$100M A,F,G,P PM, EST Barrett Shane 24 Over$200M A,G,H,I,M,N,P OM Nick Gerritsen 10 Over$10M A,P PE, EST Quinn Golden 18 Over$200M A,B,I,F,M,P SR PM Bianca Guzman Zach Hanna 20 Over$100M A,B,E,F,G,I,P SUPT Paul Harding 21 Over$335M A, B, E,F, G,I,K, P AM Cody Hookland 4 Over$40M A,I,P PE Nick Lupo 20 Over$425M A,B,E,F,G,H,M,P LP PM Deanna Matson 15 N/A F SAFETY Rod Majors 31 Over$150M A,E,F,G,H,I,P OM Jason Marlowe 29 N/A F SAFETY Jimmy Mattioli 23 Over$25M A, P EST Stephanie McFarlane 5 Over$23M A PM Ron Nelson 32 Over$200M A,B,E,F,G,H,I,J,M,P SUPT Bradford Novy 6 Over$50M A, B, H, I PE, EST Updated:January 2020 Appendix Page 1 of 3 GRAflITE' Granite Construction Company Construction Experience of Key Personnel Western Washington Region __Name^ _ . ._Years of Experience; Monetary Value of Work _ ______Type of Work __ _ ____ __ Job Capacity__ __ Mitch O'Donnell Ryan Olson 26 Over$400 M A,B,C,F,H,I,J,M,O,P SENIOR PM Gairrett Orelup Mark Ottele 19 Over$100M A,B,E,F,I,J,M,O,P SENIOR PM Jim Prouty 25 Over$200M A,B,C,I,G,P SR EST Terrence Seales 5 Over$10M A,B,I,P PE, EST Aaron Searcy PE, EST Steve Schlimmer 30 Over$75M A,B,E,I,L,M,P EST/SUPT Tate Shelton SAFETY Bo Smith 14 Over$470M A,B,E,F,G,H,I,L,M,P AM Mike Stein 19 Over$300M A,B,F,H,I,G,L,P AM Jason Styger 17 Over$75M A,E,G,I,P PM/EST Andrew Thompson 32 Over$250M A, B, E, F, G, I, J, P SENIOR PM Brian Tisch 20 Over$300M A,B,C,F,H,I,M,P PM Loren Tonsgard 28 Over$75M A,F,G,I,P SUPT Nick Valpiani 17 Over$50M A,B,E,G,I,N,P PM Travis Walken 21 Over$300M A,B,G,I,M,P CEST Gavin Wartick Pete Welch 33 Over$100M A,B,D,E,F,H, SR EST Rob Withers 36 Over$100M A,G SUPT Rob Wynegar 14 N/A F SAFETY Heather Young 15 Over$5M A, J, P EST Grant Youngren 19 Over$200M A, B, E, F, G, I, P SENIOR PM Updated:January 2020 Appendix Page 2 of 3 GRAI1ITE Granite Construction Company Construction Experience of Key Personnel Western Washington Region Name Years of Experience_ Monetary Value of Work Type of Work_ Job Capacity Type of Work Job Capacity A-Highways I-Railroad AM-Area Manager QC-Quality Control B-Structures J-Building BM-Branch Manager Supt-Superintendent C-Dams K-Power Plants ABM-Asst.Branch Manager Safety-Safety Engineer D-Tunnels L-Refining PM-Project Manager RCE-Reg.Civil Engineer E-Pipelines M-Environmental CM-Construction Manager OM-Operations Manager F-Safety N-Mining EST-Estimator EM-Estimating Manager G-Airports 0-Water Treatment CEST-Chief Estimator Eng Svcs Mgr-Eng Services Mgr H-Marine P-Sitework PE-Project Engineer Updated:January 2020 Appendix Page 3 of 3 • Underutilized Disadvantaged Business war Washington Stato Enterprise(UDBE) Written Daptsrtenattt of hanspotrtationI Confirmation Document See Contract Prnrisinns: UDBE Document Submittal Regrria'nrents Disadvantaged Business Enterprise Participation THIS FORM SHALL ONLY BE SUBMITTED TO A UDBE THAT IS LISTED ON THE CONTRACTOR'S UNDERUTILIZED DISADVANTAGED BUSINESS ENTERPRISE UTILIZATION CERTIFICATION. THE CONTRACTOR SHALL COMPLETE PART A PRIOR TO SENDING TO THE UDBE r:1RT A:To Iu mudded In the bidder The entries below shall he consistent with what is shown on the Bidder's Underutilized Disadi,antaged Business Enterprise Utilization Certification.Failure to do so will result in Bid rejection. Contract Title: 201°) (^�4�t w t cwT l tktT v w wv4. S Bidder's Business Name: _ v^-psi`' "'"��16�rStu CON39.:14 UDBE's Business Name: CitsSf�jyy� �yV xrk-(.,irinkru.t ils In L• Description of UDBE's Work: _C.EKf t/t.Et_ ' ire} cv Dollar Amount to be Applied Towards UDBE Goal: V-(r 2 ZS.'� Dollar Amount to he Subcontracted 10 UDBE": z`f •4.• • waned F e!d ?AR l K:to he comnlcled In the Underutilized Distrd••nnlaeed Buvinesb Enterprise As an authorized representative of the Underutilized Disadvantaged Business Enterprise.I confirm that we have been contacted by the Bidder with regard to thc.rcfcrcnccd project for the purpose of performing the Work described above. If the Bidder is awarded the Contract,we will enter into an agreement with the Bidder to participate in the project consistent with the information provided in Part A of ihiis form. � Name(printed): )try\ TJIt�5o" 1 • Signature: Title: `�reSTete.A. Address: 112 Mee olt'a - Date: r9I o'1 /`4D,cbS � 1 -Bei61, q8 a� DDT Forth 422-031 U Revised 03J20 t8 City of Marysville 21lPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 • Ash. Underutilized Disadvantaged Business • =mooWashington State or Transportation Enterprise(UDBE) Written Confirmation Document See Contract Pnwisions• UDBE Document Submittal Reguirtnetus Disadvantaged Business Enterprise Participation THIS FORM SHALL ONLY BE SUBMITTED TO A UDBE THAT IS LISTED ON THE CONTRACTOR'S UNDERUTILIZED DISADVANTAGED BUSINESS ENTERPRISE UTILIZATION CERTIFICATION. THE CONTRACTOR SHALL COMPLETE PART A PRIOR TO SENDING TO THE UDBE. JIART A:To he completed by the bidder The entries below shall be consistent with what is shown on the Bidder's Underutilized Disadvantaged Business Enterprise Utilization Certification.Failure to do so will result in Bid rejection. Contract Title: ZO lr') Ca `9 IA11 Itib w a {toNn r LMUak% Bidder's Business Name:C'.l YauEc,�pr� vJ{ Zv� t py uwk.f UDBE's Business Name:_O'etiA,Lo_ Lr}@ jy%.6�L. Description of UDBE's Work:by rV69 Dollar Amount'to be Applied Towards UDBE Goal: !4I1:21S.* Dollar Amount to be Subcontracted to UDBE*: A Lto • ' 'Optional Ftetd PART K:To he completed In the Underutilized Disadvantaged Busbies%Enterprise As an authorized representative of the Underutilized Disadvantaged Business Enterprise.I confirm that we have been contacted by the Bidder with regard to the referenced project for the purpose of performing the Work • described above.If the Bidder is awarded the Contract,we will enter into an agreement with the Bidder to participate in the project consistent with the information provided in Part A of this form. Name(printed): jai7D tA)it_Llt9vyiS • Signature: Tide: �1 ILCLt�✓�L • Address: to tiZ 141177 tM y S STt'EL_j Date: Z/z./2 i KEN'T (t03Z DOT Form 422-031U Ravtsed 03/2018 • City of Marysville 21 { Page 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 • VW" Washington state Disadvantaged Business Enterprise Department of Transportation (DBE) Bid Item Breakdown Form 1.Contract Number 2.Contract Name ' 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS 3.Prime Contractor 4.Prime Contractor Representative Name Granite' Construction Company Beth Duffus 5.Prime Contractor Representative Phone Number 6.Prime Contractor Representative Email 425=551-3100 _ -bid.everett@gcinc.coin Column 7 Worm8 Column I Column 2 Column 3 Column 4 C-hcrri 5 Column a Dollar Amount Name of UDBE Bid Item N FultiPartlal Quantity Description Unit Price Total Unit to be Applied Son lrsuuomns ru l (S 6nttuaorc) ISeu lnwuctuc) (Soo rmvmnns) (Soo inr..e0:nll ISun inunmo ) Cost Towards Goal (see rs(nsoms) (Sm tw(sc an.) �nginttn Inc A co Z �II I '170a4wa>•{SO(el 4'Y275.'° 01121S." 8Li/215.°% . 1 . • Subtotal: iffy;2:61' A4,i7.1S;13 Total Unit Dollar Amount Name of UDBE Did Item N, Full/Partial Quantity Description Unit Price Cost to be Applied Towards Goal C.osio>"Can urr . 21 �o r�l 1 rj ct Came- sa $14 S. 5 115,, 5 s, Cant .%tiny.ln[ TeaEhz. Conat a+kte $ / ° 1 11 lie .In1 22, A)0.. 11 O xb 34/5.' 115iyoo.rG *5/N�.° WStnvr CaA &moo.fiat.cu IrO.r.,p• y 3 . ye S cdwtv,wtt Int, ' ZS Va/kW 3 .7,,,,,.. vOiegfcl It r150. 3I1S '°' Cub t i (o G (+bQwQ ,s w «) — „ _ 2lp4atJ 5 T'Ytc D' Pe.n�rvtre SSo. �Z 550.`° 4Z,Sso. Subtotal:' i4,33i5f° t►llas 815. Dollar Amount Name of UDBE Bid Item M FuIlrPartlal Quantity Description .Unit Price TO�ost°1t to be Appilad Towards Goat CdticOo. Co+adt.. Ctw)cwr CCAL• $ eG ,R rP CsKtvita trtc 21 PO1/)tcu- 30 emic4wrS1L 125.- 133,150.e 311St - Dek.c iikk. .,� 9 u' 3 taoti,� GCly b-n3lru.. ZO alitO I (-2 0 �lovni,/ SO AU-. I7O.V I 3.1p(i7. , rr 0 • Subtotal: t j1i350D," s 113Z5.c° Total• Unit Dollar Amount Name of UDBE Bid Item N Full1Partiol Quantity Description Unit PriceCost to be Applied Towards Goal Subtotal: S 0.00 -I $0.00 ' TOTAL UDBE Dollar Amount:ft2$,Stlb`i fA s28(Saa`ft • DOT Fern,272.054 Revised 09/2020 City of Marysville 22IPage 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT Form Rev.12/2019 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal