HomeMy WebLinkAboutGranite Construction Co - 2019 HSIP Project Project Manual
Contract Documents and Special Provisions
For
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS
PROJECT
Federal Aid # HSIP-000S(523)
City Project # R1901
ESL 1891
mARysvILIE
WASHINGTON
Prepared By:
Transportation Solutions, Inc.
16932 Woodinville-Redmond Road, Suite A206
Woodinville, WA 98072
Prepared For:
City of Marysville
Public Works Department
80 Columbia Ave.
Marysville, WA 98270
(360) 363-8100
City of Marysville 1IPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
This page left intentionally blank
City of Marysville 2IPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
PART 1 - PROJECT AND BIDDING INFORMATION 5
CALL FOR BIDS 6
INFORMATION FOR BIDDERS 8
PROJECT DESCRIPTION 8
PRE-BID MEETING 8
GOVERNING DOCUMENTS 8
SUPPLEMENTAL INFORMATION FOR BIDDERS 8
PREPARATION OF BIDS 9
RECEIPT OF BIDS 9
OPENING OF BIDS 9
AWARDING AND EXECUTION OF THE CONTRACT 9
CONTRACT TIME & LIQUIDATED DAMAGES 9
BIDDER'S CHECKLIST 10
PART 2 - BID PROPOSAL DOCUMENTS 11
STATEMENT OF BIDDER'S QUALIFICATIONS 12
LOCAL AGENCY SUBCONTRACTOR LIST 14
CERTIFICATION FOR FEDERAL-AID PROJECTS 15
BID PROPOSAL FORM 16
ANTI-DISCRIMINATION CERTIFICATION 18
UDBE CERTIFICAITON 19
BID DEPOSIT 34
Proposed Contract Performance Bond Surety 34
DEPOSIT OR BID BOND FORM 35
PART 3 - CONTRACT DOCUMENTS 37
PUBLIC WORKS CONTRACT 38
PERFORMANCE BOND 42
PAYMENT BOND 43
PART 4 - PREVAILING WAGE RATES 45
PART 5 - SPECIAL PROVISIONS 75
City of Marysville Wage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
FHWA-1273 - REQUIRED CONTRACT PROVISIONS FOR FEDERAL AID
CONSTRUCTION PROJECTS 239
CONSTRUCTION PLANS 253
STANDARD PLANS 254
City of Marysville Wage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
PART 1 -
PROJECT AND BIDDING
INFORMATION
City of Marysville 5IPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
CALL FOR BIDS
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Notice is hereby given that sealed bids will be received by the City Clerk at Marysville City Hall,
1049 State Avenue, Marysville, WA 98270 until 10 a.m., local time, on Thursday, January
28, 2021 at which time and place they will be publicly opened and read aloud. The City will not
consider proposals received after this time. Bidders shall submit an original bid in a sealed
envelope labeled with the bidder's name and project title.
The CITY has received a federal grant for Local Road Safety under the Highway Safety
Improvement Program (HSIP). The project improvements will include the following.
• Installation of high friction surface treatment and speed radar warning signs on Smokey
Point Blvd. north of 140th Street NE.
• Installation of pedestrian-actuated rectangular rapid flashing beacons (RRFB), new
sidewalk and upgrade of ADA curb ramps at the intersection of 100th Street NE and 59th
Drive NE.
• Signal modifications at the intersections of 64th Street NE (SR 528) and 60th Drive NE
and 64th Street NE (SR 528) and 67th Avenue NE to provide for left turn and one right
turn flashing yellow arrow(FYA) signal operations.
• Installation of speed radar warning signs at 64th Street NE (SR 528) west of 65th Drive
N E.
• Installation of advanced westbound signalized approach beacons/signage on 64th Street
NE (SR 528) east of 68th Avenue NE to warn drivers approaching the intersection of
67th Avenue NE to "be prepared to stop when flashing".
All work must be completed in accordance with the Contract Documents and the Contractor
must comply with all applicable federal, state, and local laws and regulations.
The Engineer's Estimate for this project is $492,440. Please address any comments and
questions you may have to Steven Miller, Senior Project Manager, at 360.363.8285.
Plans, specifications, addenda, and plan holders list for this project are available online through
Builder's Exchange of Washington, Inc., at http://www.bxwa.com; 2607 Wetmore Avenue,
Everett, WA 98201-2929, (425) 259-3832. Click on "bxwa.com"; "Posted Projects", "Public
Works", "City of Marysville", "Projects Bidding", "I agree", and Project Bid Date. (Note: Bidders
are encouraged to "Register as a Bidder", in order to receive automatic email notification of
future addenda and to be placed on the "Bidders List". This service is provided free of charge
to Prime Bidders,Subcontractors&Vendors bidding on the project. Contact Builder's Exchange
of Washington at 425-258-1303 should you require further assistance.) Plan specifications,
addenda, and plan holders list may also be obtained directly through the City by contacting the
Project Manager.
Each bid must be accompanied by a certified check, cashier's check, or bid bond (with an
authorized surety company as surety) made payable to the City of Marysville in an amount not
less than five percent (5%) of the bid amount.
City of Marysville Wage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
The City of Marysville reserves the right to reject any and all bids and waive any irregularities or
informalities in the bid or in the bidding. No bidder may withdraw its bid after the hour set for the
opening thereof or before award of contract, unless said award is delayed for a period of forty-
five (45) days. The City further reserves the right to make the bid award as deemed in the best
interest of the City.
The City of Marysville in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252,
42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of
Transportation, subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-
Assisted Programs of the Department of Transportation issued pursuant to such Act, hereby
notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to
this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be
afforded full opportunity to submit bids in response to this invitation and will not be discriminated
against on the grounds of race, color or national origin or sex in consideration for an award.
Tina Brock, Deputy City Clerk
City of Marysville
First publication: Everett Herald (January 6, 2021)
Daily Journal of Commerce (January 6, 2021)
Second publication: Everett Herald (January 13, 2021)
Daily Journal of Commerce (January 13, 2021)
City of Marysville 7lPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
INFORMATION FOR BIDDERS
PROJECT DESCRIPTION
The CITY has received a federal grant for Local Road Safety under the Highway Safety Improvement
Program (HSIP). The project improvements will include the following.
• Installation of high friction surface treatment and speed radar warning signs on Smokey Point
Blvd.north of 140th Street NE.
• Installation of pedestrian-actuated rectangular rapid flashing beacons(RRFB),new sidewalk
and upgrade of ADA curb ramps at the intersection of 100th Street NE and 59th Drive NE.
• Signal modifications at the intersections of 64th Street NE(SR 528)and 60th Drive NE and 64th
Street NE(SR 528)and 67th Avenue NE to provide for left turn and one right turn flashing
yellow arrow(FYA)signal operations.
• Installation of speed radar warning system at 64th Street NE(SR 528)west of 65th Drive NE.
• Installation of advanced westbound signalized approach beacons/signage on 64th Street NE
(SR 528),east of 68th Ave NE,to warn drivers approaching the intersection of 67th Avenue NE
to"be prepared to stop when flashing".
PRE-BID MEETING
All bidders ❑ do ® do not have to attend a mandatory pre-bid meeting on-site on
, at AM. The purpose of this
meeting is to give the contractors an opportunity to ask questions and to provide access to the site
to take notes about existing site conditions and take any measurements that may be needed to plan
for the work required by the Bid Documents in preparation of their bid.
GOVERNING DOCUMENTS
The execution and prosecution of the work under this contract is governed by this Project Manual,
including the plans and specifications contained herein, the 2021 WSDOT Standard Specifications
for Road, Bridge and Municipal Construction (herein referred to as "the Standard Specifications')
published by the Washington State Department of Transportation, and any General Special
Provisions provided herein.
SUPPLEMENTAL INFORMATION FOR BIDDERS
The bidder shall promptly notify the City's Project Manager of any discovered omissions, conflict,
ambiguities,or discrepancies in the Bid Documents.Bidders shall direct any Requests for Information
(RFI's)to the City's Project Manager. Under no circumstances shall the bidder contact the design
consultant unless specifically directed by the City's Project Manager.
The Owner has made the following supporting documents available for review by bidders at the City
of Marysville Public Works Department, 80 Columbia Avenue,Marysville Washington:
NONE
City of Marysville Wage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
PREPARATION OF BIDS
The bidder shall prepare and submit its bid on the Bid Proposal Documents provided in the Project
Manual and in accordance with the Standard Specifications (as may be modified herein).
Each bidder must submit a bid deposit payable to the City of Marysville for five percent of the total
amount of the bid. The bidder may submit a certified check or cashier's check in lieu of a bid bond.
Attorneys-in-fact who sign bid bonds must file a certified and effective dated copy of their power of
attorney.
RECEIPT OF BIDS
Bids will be received at the time and location set forth in the Call for Bids and then at said office will
be publicly opened and read aloud. The City will not consider any bid received after the time and
date specified.
If delivered by mail, the bidder shall enclose the sealed envelope containing the bid within another
envelope addressed to the City at the above address.
Bids may be withdrawn or modified as provided in the Standard Specification (as may be modified
herein).
OPENING OF BIDS
The City will publicly open and read aloud all bids immediately after the time set for receiving bids.
The City invites all interested persons to attend the bid opening.
Following the bid opening, the City will provide a listing of the firms submitting bids and their bid
amounts, upon request.
After City staff has reviewed the bids and corrected any errors in the calculations of the bid amounts,
the City will publish a Certified Bid Tabulation listing all unit prices, extensions and totals for all
bidders. This will be available at the City of Marysville Public Works Department offices and website
immediately after certification.
AWARDING AND EXECUTION OF THE CONTRACT
The Contract shall be awarded and executed as provided in the Standard Specifications(as may be
modified herein).
CONTRACT TIME & LIQUIDATED DAMAGES
The contract time for this project shall be set at 45 working days, as defined in Section 1-08.5 of
the Specifications.
City of Marysville Wage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
BIDDER'S CHECKLIST
The bidder's attention is especially called to the following forms that must be completed in full
as requested and submitted collectively as the Bid Proposal package.
❑ 1. Statement of Bidder's Qualifications
❑ 2. Bid Proposal Form.All portions of the Bid Schedule, Bid Additive, Total Bid,
Signature Page, and Proof of Authority to Sign Bid must be completed.
❑ 3. Bid Deposit and Statement of Intended Surety
❑ 4. Notarized Power-Of-Attorney for Surety's Agent to Execute Bid Bond
❑ 5. Acknowledgement of Receipt of Addenda (on Bid Proposal Signature Page 29)
❑ 6. Certification of Compliance with Wage Payment Statutes
The successful bidder shall execute and submit the following contract forms following contract
award. Bidders are encouraged to carefully examine the included documents:
❑ 1. Contract
The successful bidder shall execute the Contract in two counterparts.
❑ 2. Performance Bond
To be executed by the successful bidder and the bidder's surety company.
❑ 3. Payment Bond
To be executed by the successful bidder and the bidder's surety company.
El 4. Contractor's Declaration of Option for Management of Statutory
Retained Percentage
The successful bidder shall complete the attached form, and any forms for the
retainage option selected that may be required.
City of Marysville 10IPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
PART 2 -
BID PROPOSAL DOCUMENTS
The documents contained within this section constitute the formal proposal from the
bidder to the City for this project. Failure of the bidder to submit all pages contained in
PART 2 with its bid and to accurately complete all applicable forms may be grounds for
the Owner to consider the bid non-responsive.
City of Marysville 11IPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
STATEMENT OF BIDDER'S QUALIFICATIONS
Name of Contractor:
Granite Construction Company
Address:
1525 E Marine View Dr. , Everett, WA 98201
Contact Person: Beth Duffus Phone: 425-551-3100
Contractor has engaged in the construction business under the present firm name indicated
for the past 99 years.
Gross dollar amount of work currently under contract
$ $2,416,624,000
Approximate percentage of current contracts outstanding
$5,196,113,000 47%
Type of work generally performed by Contractor
Excavation, base and sub base, grading, paving, underground utilities,
sewer, water and storm drains, concrete flatwork, curb, gutters and sidewalks.
List five major projects of a similar nature completed within the last ten years and the gross
dollar amount of each project.
See Attached $
$
List of five major pieces of equipment that are anticipated to be used on the project by the
Contractor and ownership of the item.
-0 -o -a
d) C) d)
p Description of Equipment
re
131 ❑ ❑ et_ck-l\ne
C ❑ ❑ PAC, crvvvpn ckov
II El CI
City of Marysville 12IPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
STATEMENT OF BIDDER'S QUALIFICATIONS(continued)
Bank References:
See attached
How many general superintendents or other responsible employees in a supervisory position do
you have at this time and how long have they been with the Contractor? See attached
Have you changed bonding companies within the last three years? ❑Yes No
If so,why?
Have you ever sued or been sued by any special district, municipality, county, or state
government, concerning a public works contract? x❑ Yes ❑ No
If so, explain.
See Appendix A
If so, name the agencies and reasons therefore.
Disposition of case, if settled:
Washington State UBI No:
409 023 062
Washington State Contractor's Registration No.:
CC GRANICC916DL
Washington State Worker's Comp Account No.:
572 , 672-04
IRS Employer Number:
94-0519552
Or, if individual, Social Security Number:
City of Marysville 13 ' Page
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Local Agency Name
Local Agency Address
Local Agency Subcontractor List
Prepared in compliance with RCW 39.30.060 as amended
To Be Submitted with the Bid Proposal
Project Name 2 019 -CITYWIDE HIGHWAY SAFETY- IMPROVEMENTS -
Failure to list subcontractors with whom the bidder,if awarded the contract,will directly subcontract for performance of the
work of structural steel installation,rebar installation,heating,ventilation and air conditioning,plumbing,as described in
Chapter 18.106 RCW,and electrical,as described in Chapter 19.28 RCW or naming more than one subcontractor to perform
the same work will result in your bid being non-responsive and therefore void.
Subcontractor(s)with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation,
rebar installation,heating,ventilation and air conditioning,plumbing,as described in Chapter 18.106 RCW,and electrical as
described In Chapter 19.28 RCW must be listed below.The work to be performed is to be listed below the subcontractor(s)name.
To the extent the Project includes one or more categories of work referenced in RCW 39.30.060,and no subcontractor is
listed below to perform such work,the bidder certifies that the work will either(I)be performed by the bidder itself,or(II)be
performed by a lower tier subcontractor who willnot contract directly with the bidder.
•Subcontractor Name •
c)&Vl f . G` .LM . (A-t tNG.
Work to be performed �{L(yj f aJ - - _
Subcontractor Name • 0PJ,rV\t... E,LuklA, Co. (►V..•
Work lobe performed WOo..V 6 6(-CrAA5 FANS
Subcontractor Name -
Work to be performed
Subcontractor Name
Work to be performed
Subcontractor Name
Work to be performed
•
Bidder's are notified that it is the opinion of the enforcement agency that PVC or metal conduit,junction boxes.etc.are considered
electrical equipment and therefore considered part of electrical work,even if the installation is for future use and no wiring or electrical
current is connected during the project.
DOT Form 271-01 SA
Revised 06f2020
City of Marysville 14IPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
BID PROPOSAL FORM
TO: CITY OF MARYSVILLE
1049 STATE AVENUE
MARYSVILLE,WA 98270
The undersigned bidder declares that the bidder has carefully examined the Project Manual
including the Plans and Specifications, Call for Bids, Information for Bidders, Standard
Specifications, General and/or Special Provisions, Proposal Documents, Contract Documents,
and any other documents relating to the 2019 CITYWIDE HIGHWAY SAFETY
IMPROVEMENTS PROJECT, has made such investigations as are necessary to determine the
premises and conditions to be encountered in the work, will enter into a contract with the City in
the form of the Contract enclosed, and will,to the extent required,furnish all labor and materials
and perform all work as required for construction of the improvements in strict accordance with
the Contract Documents for the unit prices shown on the Bid Schedule.
The bidder further declares that this Proposal is in all respects fair and is made without collusion
on the part of any person,firm, or corporation mentioned below, and that no officer or employee
of the City of Marysville is personally or financially interested, directly or indirectly, in the
Proposal or in any purchase of or sale of any materials or supplies for the work to which it relates,
or any portion of the profits thereof.
The bidder agrees that it will hold its bid proposal open for forty-five (45) days after the actual
date of bid opening and if its proposal is accepted, will timely execute a contract in the form of
the contract included herein, will execute and provide all bonds, certifications, and documents
required herein, and will timely commence work following execution of the contract. Thereafter,
the bidder declares that it will timely complete the work in accordance with the Contract
Documents and in the event that the bidder fails to complete the work within the time specified
in the Contract Documents, will pay liquidated damages to the City of Marysville per the
specifications and requirements of the Contract Documents.
The bidder further agrees that the bid bond or deposit accompanying this bid shall be left in
escrow with the City, and that the liquidated damages which the City will sustain by the failure
of the undersigned bidder to execute and deliver the contract and performance bond will be
equal to five percent (5%) of the total bid. If the undersigned bidder defaults in executing that
contract and in furnishing the contract performance bond within twenty (20) days of the date on
the Notice of Award, then the bid guaranty shall become the property of the City. If, however,
the City does not accept this bid or any part thereof within forty-five (45) days of the time set for
the opening of bids, or if the undersigned bidder executes and delivers said contract and surety
bond,the bid guaranty shall be returned to the bidder.
By signing and submitting this Bid Proposal, the bidder swears, under penalty of perjury under
the laws of the State of Washington and the laws of the United States, and affirms that the
following items are true and correct.
City of Marysville 16IPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Failure to return this Declaration as part of the bid proposal package
will make the bid nonresponsive and ineligible for award.
NON-COLLUSION DECLARATION
1,by signing the proposal,hereby declare, under penalty of
perjury under the laws of the United States that the following
statements are true and correct:
1. That the undersigned person(s),firm, association or corporation has
(have)not,either directly or indirectly, entered into any agreement,
participated in any collusion,or otherwise taken any action in restraint of
free competitive bidding in connection with the project for which this
proposal is submitted.
2. That by signing the signature page of this proposal, I am
deemed to have signed and to have agreed to the provisions
of this declaration.
NOTICE TO ALL BIDDERS
To report rigging activities call:
1-800-424-9071
The U.S. Department of Transportation(USDOT)operates the above toll-free
'hotline"Monday through Friday, 8:00 am.to 5:00 p.m.,eastern time. Anyone
with knowledge of possible bid rigging,bidder collusion,or other fraudulent
activities should use the 'hotline"to report such activities.
The"hotline"is part of USDOT's continuing effort to identify and investigate
highway construction contract fraud and abuse and is operated under the
direction of the USDOT inspector General. All information will be treated
confidentially and caller anonymity will be respected.
SR
DOT EOM 272-036I EF
d7J201L
City of Marysville 17IPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
ANTI-DISCRIMINATION CERTIFICATION
The bidder her'eby covenants, stipulates and agrees that no person shall be discriminated
against in the bidding of the service and/or materials hereunder and that the bidder shall not
refuse to hire any person therefore because of such person's race,creed,color or national origin,
unless based on a bona fide occupational qualification. Also, the bidder will in no matter
discriminate against any person because of such person's race, creed, color or national origin.
Any such discrimination shall be deemed a violation of this bid and shall render this bid subject
to forfeiture.
NOTICE TO ALL BIDDERS
To report rigging activities, call: 1-800-424-9071
The U.S. Department of Transportation (USDOT) operates the above toll-free"hotline" Monday
through Friday,8:00 a.m.to 5:00 p.m., ET.Anyone with knowledge of possible bid rigging,bidder
collusion, or other fraudulent activities should use the "hotline"to report such activities.
The "hotline" is part of the USDOT's continuing effort to identify and investigate highway
construction contract fraud and abuse and is operated under the direction of the USDOT
Inspector General. All information will be treated confidentially and caller anonymity will be
respected.
City of Marysville 18 ' Page
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage. Conditions Agreement see www.bxwa.com - Always Verify Scal
VWWashington State Underutilized Disadvantaged Business
Department of Transportation Enterprise Utilization Certification
To be eligible for Award of this Contract the Bidder shall fill out and submit,as a supplement to Its sealed Bid Proposal,an
Underutilized Disadvantaged Business Enterprise(UDBE)Utilization Certification,The Contracting Agency shall consider
as non-responsive and shall reject any Bid Proposal that does not contain aUDBE Utilization Certification which properly
demonstrates that the Bidder will meet the UDBE participation requirements in one of the manners provided for in the
proposed Contract_Refer to the instructions on Page 2 when filling out this form or the Bid may be rejected.An
example form has been provided on Page 3.The successful Bidder's UDBE Utilization Certification shall be deemed a
part of the resulting Contract.
Granite Construction Company
Box 1: certifies that the UDBE firms listed below have been contacted
regarding participation on this project.If this Bidder is successful on this project and is awarded the Contract,it shall
assure that subcontracts or supply agreements are executed with named UDBEs.(If necessary.use additional sheets.)
Box 2: 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS
Column 1 Column 2 Column 3 Column 4 Column 5
Name of UDBE Project Role Description of Work Dollar Amount Dollar Amount
(See Instructions) (See instructions) (Sea Instructions) Subcontracted to be Applied
to UDBE Towards Goal
(See instructions) (See instructions)
(oti att• 1.� ,,bcat.trutkcv Coy\c, -ckAkikreriv, I24,225.eO
(fir$ co yew• Subcp trarkw SUvIe`1 A Is,Sip.— 11i215.
•
Go
Underutilized Disadvantaged Business $Z2)114L ,. Total UDBE Commitment Dollar Amount$2$15( j,�
Enterprise Condition of Award Contract Goal Box 3 Box 4
5❑By checking Box 5 the Bidder is stating that their attempts to solicit sufficient UDBE participation to meet
the OA Contract goal has been unsuccessful and good faith effort will be submitted in accordance with
Section 1-02.9 of the Contract
DOT Form 272-056U
Revised 031201 B
City of Marysville 19jPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
This page left intentionally blank
City of Marysville 26IPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
BID SCHEDULE
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Notes: Unit Prices for all Bid Items must be shown.
All entries must be typed on in ink.
ITEM SECTION DESCRIPTION QTY UNIT UNIT TOTAL
# PRICE PRICE
1 1-04.4 SP Minor Changes 1 EST DOL $20,000.00
2 1-05.4 SP Roadway 1 LS 553Oto.' /5,7 60•%%
Surveying
3 1-05.4 SP ADA Features 1 LS $2,2.0°' il 2,2150,
Surveying
4 1-05.18 SP Record Drawings 1 LS 'tiSPOO.°= 9/5(010•�
(Min. Bid $5,000)
5 1-07.15 SP SPCC Plan 1 LS 150O,g9- li5at),-°"
Property
6 1-07.16 SP 1 EST DOL $4,000.00
Restoration
7 1-09.7 SP Mobilization 1 LS li 701 pub.c=9 410,0JO
Project Temporary
8 1-10.5 SP Traffic Control 1 LS Siy2150uS•39 $1421 °.
(Min. Bid $10,000)
9 1-10.5 Construction Signs 80 SF $ 15.0° 8 S, (ncst.)•='
Class A
Portable
10 1-10.5 Changeable 120 HR $9.0..§- A I, oso.%'
Message Sign
11 2-01.5 Clearing and 1 LS $ 1110150•3)- /1lii6M•�
Grubbing
12 2-01.5 Roadside Cleanup 1 EST DOL $2,000.00
Roadway
13 2-03.5 Excavation Incl. 70 CY $ Z5S."�'� 111,966 .1?"--
Haul
14 2-05.5 SP Potholing 3 EA $ 960.-eg- It 21100•-!-')
Crushed Surfacing
15 4-04.5140 �, 5,te
40 CV Base Course $ w
City of Marysville 27IPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
16 4-04.5 Crushed Surfacing 25 CY !So °° $Li,Sab•�
Top Course
17 5-04.5 SP 2 MA Cl. "A" PG 64- 20 TON ffi 50t0•`: 610(( ,'=
18 5-06.5 SP 2
High Friction 1,860 SY y( %' $bSIS(00•%
Surface Treatment
19 7-05.5 Adjust Catch Basin 2 EA I, (,Oro•c" 2.,2_00•
Erosion Control
20 8-01.5 and Water 1 LS 11 I �1 .° cuo•
Pollution
Prevention
Cement Conc.
00
21 8-04.5 Traffic Curb and 115 LF .31•°`—' Li/ygS.
Gutter
22 8-04.5 Cement Conc. 120 LF 37. 4
Pedestrian Curb ,`f40 °'
23 8-09.5 Raised Pavement 0.6 HUND C4 Ib20.°5 (eaZ.*
Marker Type 2
24 8-10.5 SP Flexible Delineator 15 EA ft 140.q9 $2110
Cement Conc. Curb
25 8-14.5 Ramp,Type 3 EA 62,S010•42 $Mao•
Parallel
Cement Conc. Curb
26 8-14.5 Ramp,Type 3 EA ' Zi 760•°n S g,101D.od
Perpendicular
27 8-14.5 Cement Conc. 30 SY , 02 S
Sidewalk
28 8-14.5 Detectable 60 SF $29 .aO OLIO.
Warning Surface
Curve Warning
System (Smokey 3 •_
ill 29 8-20.5 SP Point Blvd. north 1 LS 3y'� 3�(,ocstO°°
of 140th Street
NE), Complete
Rectangular Rapid
Flashing Beacon
30 8-20.5 SP (RRFB)System 1 LS 31(OUL)% 21)3l,o 5 tcO•
(100th Street NE
and 59th Drive
NE), Complete
City of Marysville 28IPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Traffic Signal
System
Modifications I Cf,crco.�' 1 c (O.oc).
31 8-20.5 SP (64th Street NE 1 LS
and 60th Drive
NE), Complete
Traffic Signal
System
32 8-20.5 SP Modifications 1 LS $ I1 rGo $t ooO.*
(64th Street NE
and 67th Avenue
NE), Complete
Speed Radar
Warning System 3`f�oiJf'cla Sq,exp•°-°
33 8-20.5 SP (64th Street NE 1 LS
west of 65th Drive
NE), Complete
Advanced Warning
Beacon System
34 8-20.5 SP (64th Street NE 1 LS �31,560•°�
east of 68th Ave
NE), Complete
Plastic Crosswalk
35 8-22.5 SP Line 120 SF $ 11.012. I, 32 °°0•
36 8-22.5 SP Plastic Stop Line 34 LF 110.'52 $
37 8-22.5 SP Paint Line 3,080 LF 0.10 s 2,15(0•4
38 8-22.5 Removing Paint 3,080 LF %' S
LineZ. (p,lf¢t0•
39 8-22.5 Removing Plastic 30 LF $ 105.`
Line
40 8-22.5 Removing Plastic 84 SF 3 50 $Oiy
Crosswalk Line
TOTAL BID: '109 ,9 562.'22
(The City reserves the right to award the lowest responsive, responsible bidder based on the
Total Base Bid or the Total Bid).
City of Marysville 291Page
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
•
Local Agency Certification for Federal-Aid Contracts
The prospective participant certifies by signing and submitting
this bid or proposal,to the best of his or her knowledge and
belief,that:
(1) No Federal appropriated funds have been paid or will be paid,by or on
behalf of the undersigned,to any person for influencing or attempting to
influence an officer or employee of any Federal agency,a Member of Congress,
an officer or employee of Congress.or an employee of a Member of Congress
in connection with the awarding of any Federal contract,the making of any
Federal grant,the making of any Federal loan,the entering into of any
cooperative agreement,and the extension,continuation,renewal,amendment.
or modification of any Federal contract,grant,loan or cooperative agreement
• (2) if any funds other than Federal appropriated funds have been paid or will be
paid to any person for influencing or attempting to influence an officer or
employee of any Federal agency.a Member of Congress,an officer or
employee of Congress,or an employee of a Member of Congress in connection
with this Federal contract,grant,loan,or cooperative agreement,the
undersigned shall complete and submit Standard Form-LLL,`Disclosure Fomi
to Report Lobbying,'in accordance with its instructions.
This certification is material representation of the fact upon which reliance was
placed when this transaction was made or entered into. Guhmission nt this
certification is a prereouisite for making or entering into this transaction imposed
by Section 1352,Title 31, U.S.Code. Any person who fails to file the required
certification shall be subject to a civil penalty of not less than 510,000 and not
more than$100,000 for each failure.
The prospective participant also agrees by submitting his or her hid or proposal
that he or she shall r-. ire that the language of this certification be included in
all lower tier subcontracts.w'nich exceed S100,000 and that all such
subrecipients shall certify and disclose accordingly.
COT 3e. ,_:. ,3'er
� 77:71t
City of Marysville 30IPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Seal
IN WITNESS hereto, the undersigned bidder:
a) Agrees to the conditions of this bid;
b) Certifies that this bid has not been restricted, modified or conditioned;
c) Acknowledges receipt of addenda 1 to 3
d) Attests to the absence of collusion in the Non-Collusion Affidavit above and agrees to be
bound by its provisions;
e) Covenants,stipulates and agrees in accordance with the Anti-Discrimination Certification
above;
f) Declares, accepts and understands the requirements of the Contract Documents;
g) Has reviewed the insurance provisions of the Contract Documents and certifies that
coverage will be provided as required;
h) Understands and agrees as to the completion time and liquidated damages as above,
and
i) With the full authority of the firm submitting this bid has signed below this 28th
day of January , 20 21
X 444-1P-
Signature of bidder
James A. Prouty
Printed Name
Sr . Estimator
Title
Granite Construction Company
Company Name
Address at which to direct correspondence:
1525 E Marine View Dr.
City Everett State: WA Zip: 98201
Phone: 425-551-3100
Fax: 425-551-3116
Email: bid. everett@gcinc . com
License No.: CC GRANICC916DL
Sworn before me this 28th day of January , 20 21 .
`` ��Q�;vM�NENsAmy())4/17/1
rensen (Print Name)
:•.g ver 1q%). Notary Public in and for the State of Washington ,
Q NOTggy residing at: 1525 E Marine View Dr. Everett WA
•
•-••••• •• = My appointment expires: 10/10/2024
• PUBLIC
• •i�j•Anto Asvl210�'" ••
n111111111
City ot 311Page
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
PROOF OF AUTHORITY TO SIGN BID
The party by whom this bid is submitted and by whom the contract will be entered into, in case
the award is made to said party, is
Firm Name: Granite Construction Company
❑x Corporation
❑ Partnership
❑ Individual
Doing business at 1525 E Marine View Dr.
Everett, WA 98201
Address City/State
Which is the address to which all communications concerned with this bid and contract should
be sent.
The name of the president, treasurer, and manager of the bidding corporation, or the names of
all persons and parties interested in this bid as partners or principals are as follows:
Name/Title Address
See Attached
If Sole Proprietor or Partnership
IN WITNESS hereto,the undersigned has set his (its) hand this_day of
20
Signature of bidder
Title
City of Marysville 32IPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
If Corporation
IN WITNESS WHEREOF, the undersigned corporation has caused this instrument to be
executed and its seal affixed by its duly authorized officers this 20th day of
January , 2021.
Granite Construction Company
Name of Corporation
By a•
Secretary
Title James A. Prouty Sr. Estimator
Kenneth B. Olson, Assistant Secretary
NOTE: 1. If the bidder is a co-partnership, so state, giving the name under which
business is transacted.
2. If the bidder is a corporation, only a duly authorized official may execute this
Bid Proposal. This proof of authority must be notarized.
See Attached Jurat
Sworn before me this day of , 20_
Poy Q,Irk
POMP",P" (Print Name)
E** 'i . � Notary Public in and for the State of
N �. 0
° residing at:
j My appointment expires:
.ate a'
City of Marysville 33IPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
A notary public or other officer completing this
certificate verifies only the identity of the U�I
individual who signed the document to which this J
certificate is attached,and not the truthfulness,
accuracy,or validity of that document.
STATE OF CALIFORNIA }
}
COUNTY OF SANTA CRUZ }
Subscribed and sworn to (or affirmed)before me on
this 20th day of January , 20 20
by Kenneth B. Olson
proved to me on the basis of satisfactory evidence to be the person(s)who appeared before me.
}t.rj � �,:;,� , - MARIA GOMEZ
' COMM. #2259567
o.�:� Notary Public-California
90)11/11ADSanta Cruz County 1 M4y Comm.Bjpires See:2, 20221
Signature of Notary Public
Maria Gomez, Notary Public
DEPOSIT OR BID BOND FORM
DEPOSIT STATEMENT
Herewith find deposit in the form of certified check or cashier's check in the amount of
$ ,which amount is not less than five percent of the total bid.
SIGN HERE
N/A
BID BOND
KNOW ALL MEN BY THESE PRESENTS:
That we, Granite Construction Company
as Principal, and
Travelers Casualty and Surety Company of America , as Surety, are
held firmly bound unto the CITY OF MARYSVILLE, Washington, as Obligee, in the penal sum
of Five Percent(5%) of Bid Amount Dollars,for the
payment of which the Principal and the Surety bind themselves, their heirs, executors,
administrators, successors, and assigns,jointly and severally by these presents.
The condition of this obligation is such that, if the Obligee shall make any award to the Principal
for the " 2019 Citywide Highway Safety Improvements Project
Project," according to the terms of the bid made by the Principal therefore, the Principal shall
duly make and enter into a contract with the Obligee in accordance with the terms of said
proposal or bid and award and shall give bond for the faithful performance thereof, with Surety
or Sureties approved by the Obligee, or if the Principal shall, in case of failure to so do, pay and
forfeit to the Obligee the penal amount of the deposit specified in the call for bids, then this
obligation shall be null and void; otherwise, it shall be and remain in full force and effect,and the
Surety shall forthwith pay and forfeit to the Obligee, as penalty and liquidated damages, the
amount of this bond.
SIGNED, SEALED, AND DATED THIS 20th DAY OF January 20 21
.0tatllicy4„,
4
/,� Granite Construction Company
a
Principal
▪al• it :102 z 1,404 g,^04r.
dui tttttttu�iiurrrrrr,� By:
�,P ", .' ���.�``PtJO �RETy .,,� Its: James A Prouty, Sr. Estimator
e 1.
0,0 rw1 O ���v `�'JQ . 0�� Travelers Casualty and Surety Company of America
Q HARTFORD, z= Surety A ,,▪ CON N. 10 (IAA-` ^�
re• ,� a By:
4 ijj ``�� Its: Isabel Barron, Attorney-In-Fact
111°r'rrnn nt>>�������
Received return of deposit in the sum of$ N/A
City of Marysville 35IPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
•
A notary public or other officer completing this
certificate verifies only the identity of the individual ACKNOWLEDGMENT
who signed the document to which this certificate is
attached,and not the truthfulness,accuracy,or validity
of that document.
State of California
County of Santa Cruz )
On January 20, 2021 before me, Maria Gomez,Notary Public
(insert name and title of the officer)
personally appeared Isabel Barron
who proved to me on the basis of satisfactory evidence to be the person(s)whose name(s) is/are
subscribed to the within instruments and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
J ; � MARIA GOMEZ
w G' rt, , COMM. #2259567 z
o,= �� Notary Public-California o
WITNESS my hand and official seal. Z 'a Santa Cruz county m
1 v v y My Comm.Eipires Sep.24,2022 t
Signature `/ ` (Seal)
1 Maria Gomez,Notary Public
Travelers Casualty and Surety Company of America
AIM► Travelers Casualty and Surety Company
- TRAVELERS J St. Paul Fire and Marine Insurance Company
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS:That Travelers Casualty and Surety Company of America,Travelers Casualty and Surety Company, and St.
Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut(herein collectively called the
"Companies"),and that the Companies do hereby make,constitute and appoint Isabel Barron of WATSONVILLE ,
California , their true and lawful Attorney-in-Fact to sign, execute, seal and acknowledge any and all bonds, recognizances,
conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the
fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any
actions or proceedings allowed by law.
IN WITNESS WHEREOF,the Companies have caused this instrument to be signed,and their corporate seals to be hereto affixed,this 3rd day of February,
2017.
(EROCTrt:))
V
41:011‘
yet
State of Connecticut �/�
By:
� ��---
City of Hartford ss. Robert L.Raney,Seft'or Vice President
On this the 3rd day of February, 2017, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of
Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company,and St. Paul Fire and Marine Insurance Company,and that
he, as such, being authorized so to do,executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by
himself as a duly authorized officer.
In Witness Whereof,I hereunto set my hand and official seal. 6.
� �l
My Commission expires the 30th day of June,2021 jr. � u._t' C tau.
it .Jl.Jt
* Marie C.Tetreault,Notary Public
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Travelers Casualty and
Surety Company of America,Travelers Casualty and Surety Company, and St.Paul Fire and Marine Insurance Company,which resolutions are now in full
force and effect,reading as follows:
RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any
Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attomeys-in-Fact and
Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with
the Company's name and seal with the Company's seal bonds,recognizances,contracts of indemnity,and other writings obligatory in the nature of a bond,
recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the
power given him or her;and it is
FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice
President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company,provided that each such delegation
is in writing and a copy thereof is filed in the office of the Secretary;and it is
FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional
undertaking shall be valid and binding upon the Company when(a)signed by the President,any Vice Chairman,any Executive Vice President, any Senior
Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant
Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary;or(b)duly executed(under seal,if required)by one
or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more
Company officers pursuant to a written delegation of authority;and it is
FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President,any Vice
President, any Assistant Vice President, any Secretary, any Assistant Secretary,and the seal of the Company may be affixed by facsimile to any Power of
Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of
executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing
such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile
signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached.
I, Kevin E. Hughes, the undersigned, Assistant Secretary of Travelers Casualty aRfrr w,Vy Company of America, Travelers Casualty and Surety
Company, and St. Paul Fire and Marine Insurance Company,do hereby certify ttks'Pb' si €�•d. ,foregoing is a true and correct copy of the Power of
Attorney executed by said Companies,which remains in full force and effect. �•` ..........•....
Dated this Januaryo20,2021 om;. •;yo's
4oww •J14, '1V4N0 ' 0' HARTFORD,
, , `„uxrwsoe,'' x N.. CONN. o
' ' '• 4yy.... ..,•.... rJ� -1 s.. Kevin E.Hughes,Assi tant Secretary
To verify the authenticity of this Power ofttomey,...............A us at 1-800-421-3880,
Please refer to the above-named Attorney-in-Fact and the details of the bond to which the power is attached.
i�
��, Washington State
IV/ Department of Transportation
Contractor Certification
Wage Law Compliance -Responsibility Criteria
Washington State Public Works Contracts
FAILURE TO RETURN THIS CERTIFICATION AS PART OF THE BID PROPOSAL PACKAGE WILL
MAKE THIS BID NONRESPONSIVE AND INELIGIBLE FOR AWARD
I hereby certify, under penalty of perjury under the laws of the State of Washington,on behalf of the firm
identified below that,to the best of my knowledge and belief,this Mil has NOT been determined by a final
and binding citation and notice of assessment issued by the Washington State Department of Labor and
Industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully
violated, as defined in RCN 49_48.082,any provision of RCW chapters 49.446,49.48,or49.52 within three
(3)years prior to the date of the Call for Bids.
Bidder Name:• Granite Construction Company
Name
� of Contr ctoradder-Printfull legal entit name of firm
By: `�"l"� & "r/ James A. Prouty
Signature ofauthorzed .erson Print Name of person making certifications for fon
Title: Sr. Estimator plaCe: Everett, WA
The of person signing certificate Print city and state where signed
Date: 1/28/2021
FGrrtl:7:am,
City of Marysville 36JPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of'`WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Seal
GRANITE CONSTRUCTION COMPANY
CERTIFICATE OF SECRETARY
RESOLVED,that, effective January 1,2021 through December 31,2021,the individuals
named on the attached Exhibit 1 are authorized to negotiate, execute and/or attest electronic and
paper documents and contracts necessary for the conduct of the Company's affairs with respect
to the submission and execution of construction project bids,bid proposals,bid addenda and all
other bid-related documents prepared and submitted on behalf of the Company not to exceed$25
million,relating to any and all domestic construction projects arising out of the Company's
operations.
RESOLVED,that, effective January 1,2021 through December 31, 2021,the individuals
named on the attached Exhibit 2 are authorized to negotiate, execute and attest electronic and
paper documents and contracts necessary for the conduct of the Company's affairs with respect
to the submission and execution of construction project bids,bid proposals,bid addenda and all
other bid-related documents prepared and submitted on behalf of the Company not to exceed$75
million,relating to any and all domestic construction projects arising out of the Company's
operations.
RESOLVED FURTHER,that the authority provided for herein shall be in accordance with
applicable policies,procedures, and limits of authority previously approved and the Granite
Construction Incorporated Delegation of Authority and Policy then in effect.
I, M. Craig Hall, Secretary of GRANITE CONSTRUCTION COMPANY, a California
corporation(the"Company"), do hereby certify that the following is a true and correct copy of
resolutions duly adopted effective January 1, 2021 by a Unanimous Written Consent of the
Board of Directors in accordance with the provisions of Article III, Section 9 of the Bylaws of
the Company;that the Directors acting were duly and regularly elected; and that the resolutions
adopted have not been repealed and are still in full force and effect:
®�1t6i11je®
Dated: January 1,2021 a al RUCT�,t.,
' M. C g"Hall GO fow fir ti
lid SEA io
J34.4,1922 •C
,'®®®eif 1*111,�®e'
EXHIBIT 1
AUTHORIZED SIGNERS
Granite Construction Company
Northwest Group
Washington Region
AUTHORIZED SIGNERS
Michael A.Stein,VP Washington Region
Sonny Chavez,Regional Controller
Cevin Ladwig Sr.,Eastern WA Area Manager
Paul Harding,Southwest WA/OR Area Manager
Boudrey J.Smith,NW Washington Area Manager
Jeremy Deemer,Construction Manager
Nicholas Gerritsen,Construction Manager
Jason Halverson, Construction Manager
Cory Bell,Construction Manager
Lance Chambers,Construction Manager
Quinn Golden,Senior Project Manager
Ryan Olson,Senior Project Manager
Mark Ottele,Senior Project Manager
Blake Amber,Senior Project Manager
Travis Walken,Chief Estimator
Grant Youngren,Senior Estimator
J.Peter Welch,Senior Estimator
James A.Prouty,Senior Estimator
Steve Schlimmer,Senior Estimator
Jonathon Carpenter,Senior Estimator
James Gartside,Project Manager
Shane Berrett,Plants Manager
Andrew B.Thompson,Project Manager
Cody Rettke,Project Manager
Jason Styger,Project Manager
Keith Majors,Material Sales Manager
ATTESTORS
Michael A. Stein,VP Washington Region
Sonny Chavez,Regional Controller
Cevin Ladwig Sr.,Eastern WA Area Manager
Paul Harding,Southwest WA/OR Area Manager
Boudrey J.Smith,NW Washington Area Manager
Jeremy Deemer,Construction Manager
Nicolas Gerritsen,Construction Manager
Jason Halverson, Construction Manager
Cory Bell,Construction Manager
Travis Walken,Chief Estimator
Grant Youngren,Senior Estimator
J.Peter Welch,Senior Estimator
James A.Prouty,Senior Estimator
Heather Young,Estimator
James Gartside, Project Manager
Shane Berrett,Plants Manager
Andrew B.Thompson,Project Manager
Cody Rettke,Project Manager
Keri Lee Gross,Office Manager
Brynna Bennett,Estimating Assistant
Amy Sorensen,Estimating Assistant
John Newby,Estimating Assistant
EXHIBIT 2
AUTHORIZED SIGNERS
Granite Construction Company
Northwest Group
AUTHORIZED SIGNERS
Michael Tatusko, Senior VP Group Operations
Chris Burke, VP Nevada Region
Jason Klaumann, VP Utah Region
Derek Betts, VP Alaska Region
Todd A.Hill, VP Arizona Region
Michael A. Stein,VP Washington Region
Bradly Estes,VP Construction Materials
GRAflITETM
Appendix A
Below,to the best of my knowledge and belief, please find a list of closed and pending arbitration and litigation with Granite Construction
Company within the last five (5)years.
Start Date Case Name Venue Description Claim Amount Resolution
2015-01-02 GCC v.Meadow Valley Contractors,Inc.;Liberty Washoe County 2nd District Court,NV Allegations of Non-payment $115,166.94 Settled
Mutual Case No.CV14-00230
2015-02-23 GCC v.CADOT(Interstate 10 Overlay) Office of Administrative Hearings— Allegations of Non-payment for delay and extra costs $247,070.15 Settled
Public Works Contracts Case No.A- $247,070.15
0001-2015
2015-04-08 Safeway v.GCC Alaska District-U.S.District Court- Allegations of Breach of contract;breach of express Undefined. Judgement
Anchorage Division,AK Case# and implied warranties Treble
3AN1511239CI damages pled.
2015-04-15 ECC and HW Lochner American Arbitration Association 02- Allegations of Breach of contract;negligence $53,455,461.00 Settled
0003-7129
2015-04-20 GCC v.CADOT(1-805 South)(Arb) Office of Administrative Hearings 2349 Allegations of GCC alleges defective plans&specs, $5,800,000.00 Settled
Gateway Oaks Drive,Suite 200 constrained access,and conditions that differed from
Sacramento,CA 95833 Case No.A- bid time.
0010-2015
2015-06-26 GCC v.CADOT(Lone Pine Cottonwood)Arb Office of Administrative Hearings 2349 Allegations of Non-payment;Breach of Contract, $864,964.51 Settled
Gateway Oaks Drive,Suite 200 Breach of Warranty,Breach of Implied Good Faith&
Sacramento,CA 95833 Case No.A- fair dealing$864,964.51
0013-2015
2015-07-08 GCC v.CADOT(395 Conway Summit)(Arb) . Office of Administrative Hearings 2349 Allegations of Additional costs incurred in attempt to $125,453.17 Settled
Gateway Oaks Drive,Suite 200 comply with defective specification$125,453.17
Sacramento,CA 95833 Case No. A-
0014-2015
2015-08-11 City of Sacramento v.TranSystems Corporation,et al. Superior Court of Sacramento County, Allegations of Breach of contract,breach of warranty, $5,000,000.00 Settled
(including GCC) CA Case No.34201500179619 and negligence$5,000,000
2015-09-30 Cemex Construction v.Tab Constructors;GCC;FIC; Superior Court of Ventura County,CA Allegations of Non-payment;enforce stop payment $141,244.00 Settled
State of CA,et al. Case No.56201500469243CUORVTA notice
2016-03-17 GCC and RS and H Architects/140 Reconstruction American Arbitration Association,North Allegations of Breach of contract based on RSL&H's $3,390,322.00 Awarded
(Arb) Carolina failure to meet standard of care and negligence.
2016-04-08 Safeway Inc.v.GCC(Dutch Harbor Parking Lot U.S.District Court,Anchorage,AK Breach of contract;breach of warranties$1,000,000 Awarded
Repave)
2016-05-03 Robertson's Ready Mix,LTD v.San Diego San Diego County Superior Court,CA Allegations of Non-payment:enforce stop payment $122,966.34 Settled
Association of Government,et al.(including GCC) 37-2016-00013474-CU-MC-CTL notice
2016-06-02 Trinity Highway Products,LLC v.DRG Fence,Inc.; Superior Court of Santa Barbara Allegations of Non-payment;breach of contract; $122,966.34 Awarded
CADOT;GCC;et al County,CA Case No.16CV02289 common counts to enforce stop payment notice(GCC
substituted as plaintiff against DRG)
• Work/payment issues over$50,000.00 only pulled Monday, November 9, 2020
GRAnITETM
Start Date Case Name Venue Description Claim Amount Resolution
2016-06-10 GCC/MCM JV v.CADOT(PIP 101)(Arb) Office of Administrative Hearings 2349 Allegations of Breach of contract including implied $1,203,308.77 Awarded
Gateway Oaks Drive,Suite 200 covenant of good faith and fair dealing.$1,203,308.77
Sacramento,CA 95833 A-0012-2016
2016-08-09 North Coast Electric v.Elcon Corp.,et al.(GCC) Pierce County Superior Court,WA 16-2- Allegations of Breach of contract;bond claim $169,656.00 Settled
09861-0 enforcement By GCC$334,354.00 Against GCC
$169,656.00. 11/16—GCC obtained judgment against
DRG for$141,490.98.GCC settled Trinity's claim
against it for$131,404.
2016-08-17 GCC v.JLR Engineering,Inc. Third District Court of Salt Lake County, Allegations of Breach of contract;default $1,719,563.61 Awarded
UT Case No.160906566
2016-09-17 GCC v.Ace Engineering Kern County Superior Court,CA BCV- Allegations of Breach of contract $155,382.00 Awarded
16-102201
2016-12-09 Cell-Crete Corp and GCC(Arb) American Arbitration Association Allegations of Non-payment;delay damages;and Awarded
increased costs. Against GCC$309,557 By
GCC$350,000
2017-07-24 GCC v.Gonsalves&Stronck Construction Co.,Inc. Santa Cruz County Superior Court,CA Allegations of Non-payment $600,884.63 Settled
2017-08-18 GCC v.CADOT Allegations of Breach of contract;non-payment for $15,688,939.86 Pending
additional work$15,688,839.86
2017-08-30 Sierra Mountain Construction,Inc.v.GCC Butte County Superior Court,CA Allegations of Conversion,trespass,and negligence $500,000.00 Settled
2017-12-15 GCC v.Deltech Engineering,Inc. Santa Barbara County Superior Court, Allegations of Breach of contract$93,390.12 $93,390.12 Judgement
CA 18CV00781
2017-12-21 NGC Fund I,LLC v.City of Santa Barbara,et aI. Santa Barbara County Superior Court, Allegations of Negligence Unspecified Settled
(Including GCC) CA 17CV05685
2018-05-09 Advanced Concrete Sawing&Sealing,Inc.v.GCC,et San Diego County Superior Court 37- Allegations of Breach of contract;non-payment $158,348.50 Settled
al.(FIC and CADOT) 2018-00021797-CU-BC-CTL
2018-10-23 Synergy Earth Systems,LLC v.GCC U.S.District Court Northern District of Allegations of Breach of settlement agreement $310,659.10 Settled
Alabama 2018-CV-01743
2019-01-14 GCC v.CADOT(805 DAR) Office of Administrative Hearings A- Action for non-payment for actual quantities of work Pending
0012-2016 _ performed
2019-03-26 GCC v.Regional Transportation Commission of Allegations of Additional costs due to unsuitable $4,371,807.00 Pending
Washoe County subgrade and soils$4,371,807
2019-05-09 GCC v.Myers&Sons Construction,LP Sacramento County Superior Court 34- Allegations of Breach of contract;non-payment $2,540,011.16 Pending
2019-00256161
2019-10-04 GCC v.Mercer-Fraser Company,et al. Monterey County Superior Court Allegations of Breach of contract;non-payment Pending
19CV003948
2019-10-09 GCC v.Alta Land Surveying,Inc.(Mesa Housing American Arbitration Association,CA Allegations of Breach of contract;negligence Unspecified Settled
Pedestrian and Bike Bridge UCSD
2019-11-04 GCC v.NGU Contracting,Inc.et al.(Marana Santa Pima County Superior Court,AZ Allegations of Breach of contract,unjust enrichment, Pending
Cruz River Levee) C20194827 bond enforcement
2019-11-08 G&F Concrete Cutting,Inc.v.GCC Los Angeles County Superior Court Allegations of Breach of contract;non-payment $338,172.12 Settled
18STCV04125
• Work/payment issues over$50,000.00 only pulled Monday, November 9,2020
GRAIIITE"
Granite Construction Company
2019 Com•feted Job Schedule Greater Than S3 Million
Job ID Name and Address ofOwner Name,Location of Project,and Kind ofWork Work Type Category Prime or Name of Contractor(if Owner Contact Contract Actual
Subcontractor sub) Amount Completion
Date
711046 US Department Of Transportation Federal Glenn Hwy Rehab W Chickaloon Roads/Highways Prime Contractor N/A Michael Baron $11,576.563 8/29/2019
Federal Highway Administration, Contract Number.DTFH7017C00016 (360)619-7563
610 East Fifth Street Palmer,Alaska (360)619-7846(f)
Vancouver,WA 98661-3801 Road Realignment,700,000 CY Ex,striping,guardrail and resurface bridge deck. michaeLbaron@dotgov
797068 Alaska Department of Transportation& Anc Taxiway R Grp VI Improve Airports Prime Contractor N/A Stephen Frey J14,700,712 6/30/2019
Public Facilities Contract Number.CFAPT0070 (907)269-0664
PO Box 196900 Anchorage,Alaska (907)243-5092(F)
Anchorage,AK 99519.6900 Widen the Taxiway Safety Area for Taxiway R and rehabilitate Taxiways S,T,U,and ACP Taxilane at Anchorage International Airport to stephenfrey@dotgnv
meet FAA standards for Airplane Design Group VI and Taxiway Design Group 7.Airfield lighting improvements will include rehabilitation
of the taxiway centerline and edge lighting systems within the project area.Other Improvements will include storm drain system
rehabilitation,obstruction removal for Runway 15-33 and underground utility adjustments.
813261 Alaska Department of Transportation& Amats:Rabbit Creek Road Pavement Preservation Prime Contractor N/A Brian Schumacher $6376,519 7/15/2019
Public Facilities Contract Number.Z585110000 (907)269-0432
PO Box 196900 Anchorage,Alaska (907)243-5092(F)
Anchorage,AK 99519-6900 Resurface Rabbit Creek Rd from the old Seward Hwy to Hillside Drive.Work includes improvements to guardrail,drainage and culverts, brian.schumacher@alaska.gov
signing,signalization,striping and embankments dig-outs.
795354 Ryan Companies Inc Project Wildcat Site Work Commercial Subcontractor Ryan Companies Inc Braden Rots 315,205,772 5/31/2019
3900 East Camelback Road,Suite 100 Contract Number. (480)261-05613 Fan N/A
Tucson,AZ 85018-2614 Tucson,Arizona Braden.bott@ryancompanies.com
Earthwork underground utilities,and Ratwork for new e-commerce facility on 85 acres.The project scope included civil/site work on an 80
acre site for a 2.5 million-square-foot fulfillment center.The project includes 50,000 CY of earthwork to be completed in four weeks(10-
hour shifts,7-days per week).
800451 Pima County Procurement Department Pc Rlop Pkg S Roads/Highways Prime Contractor N/A Lany Wallace $3,803,213 1/21/2019
130 West Congress Street Contract Number.294192 (520)444-1283
Tucson,AZ 85701-1317 Tucson,Arizona F.N/A
Rehabilitate residential streets by milling of asphalt and repaving,utility adjustments,pavement markings.Project includes milling. Larry.Wallace@pima.gov
grading,paving,and striping sections of 4 neighborhoods within Pima County.Project activities included 190,000 SY of asphalt pavement
milling,grading at all locations,30.500 TN of asphalt paving,speed hump replacement,utility adjustments,and pavement marking,
843620 City of Tucson Cot Oar Package No 1 Roads/Highways Prime Contractor N/A Gregory Orsini $6,642,987 4/30/2019
1000S Greasewood Rd Contract Number.192044 (520)837-6617
Tucson,AZ Tucson.Arizona Far(520)791-4238
In-town roadway re-constructs at five locations;to include milling,aggregate base,paving,lime treated sub-grade,flat-work,ADA ramp Gregary.Orsini@tucsanaz.gov
upgrades,electrical upgrades Full depth road reconstruction,milling,aggregate base,paving,lime treated subgrade,Ratwork/ADA
upgrades,electrical upgrades and striping.
838044 Freeport Mcmoran Corporate Fmi Siemita Pipe Crossing Mining Prime Contractor N/A Cody McGrath S6,917,889 12/24/2019
333 North Central Avenue Contract Number.N/A (520)393-2765
Phoenix,AZ Green Valley,Arizona Fax N/A
The project began with the construction of two concrete pipe crossings totaling over 250 cy and 11,000'of relocated 30'and 36'HDPE cmgrath@fmtcom
waterline.The owner changed ordered into the contract and earthen buttress totaling 1,600,000 cy,10,000 tons of excavated rip rap down
drain spillways and 126 acres of hydro seed.The entire project was self-performed by Granite's workforce.
810330 Pima County Procurement Department Pc Fy 18/19 Arterial Collector Transportation Prime Contractor N/A Greory Orsini $3,357,613 2/22/2019
130 West Congress Street Contract Number.299290 (520)837-6617
Tucson,AZ B5701-1317 Tucson,Arizona Fax(520)791-4238
Project includes milling,paving,and striping sections of 13 arterial roads within Pima County,each location varying between 1 to 3 miles cmgrath@fmi.com
-in length.Project activities included 270.000 SY of asphalt pavement mining,33,500 TN of asphalt paving,utility adjustments,pavement
markings,and detections loops in two locations.
928057 City of Tucson Cot Fy 19 Rd Rec Rehab Pck 2 Transportation Prime Contractor N/A Greory Orsini $3,964,118 11/1/2019
1000 S Greasewoad Rd Contract Number.192204 (520)837-6617
Tucson,AZ Tucson,Arizona Fax(520)791-4238
The project consisted of fun depth roadway reconstruction of local arterial streets;the project included complete removal of the existing cmgrath@fmi.com
roadway section and replacement with lime treated subgrade,aggregate base and multiple lifts of asphalt using fiber reinforcement and a
polymer modified binder to help extend the longevity of the roadways design(Ie.The project also included upgrades to the misting
traffic signals,signing/striping as well as upgrades to the surroundingcurb/flatwork and ADA ramps where required.
Appendix tot e
Updated:March 2020
GRAIIITE
Granite Construction Company -
2019 Corn•feted Job Schedule Greater Than S3 Million
Job ID Name and Address of Owner Name,Location ofProject,and Hind of Work Work Type Category Primeor Namen f Contractor(If Owner Contact Contract Actual
Subcontractor sub) Amount Complellon
Date
690428 City of Goleta Hollister Class 1 Bike Path Roads/Highways Prime Contractor N/A Andrew Borrel6 54,533,686 12/31/2019
130 Cremona Drive Contract Number 2017-017 (805)966-2224
Goleta,CA 93117-5514 Goleta,California Fax N/A
Construct Class 1 Bike and Pod Path,approximately 1,600 cy of concrete.Approximately 7,500 tons of HMA paving installed far pavement aborrelli@mnsengineers.com
rehabilitation.Includes new median construction,landscaping,and new striping.
761418 State of Califomia Department of Caltrans Emergency Work-Thomas Fire Flood Damage Roads/Highways Prime Contractor N/A Jason Kline $20,050,000 5/30/2019
Transportation Contract Number. (805)698-2393 Fax.N/A
1727 30th Street Montecito,Califomia jason.kine@dotcagov
Sacramento,CA 95816-7005 EMERGENCY WORK-CLEAR/REMOVE MUDSLIDE DEBRIS HWY 101/MONTECITO CA
805426 City of Santa Barbara Gutierrez St Bridge Replace Bridge Only Prince Contractor N/A Tim Gaasch 55,468.786 10/22/2019
630 Garden Street Contract Number.3670 (805)564-5377 Fax N/A
Santa Barbara,CA 93101-1656 Santa Barbara,California tgaasch@santabarbaracagov
Remove&Replace Gutierrez St bridge over Mission Creek with concrete channel walls,
842209 City of Santa Barbara City of Santa Barbara 2019 Pavement Maintenance Transportation Prime Contractor N/A Tim Gaasch $6,536,414 5/21/2019
630 Garden Street Contract Number.3928 (805)564-5377 Fax N/A
Santa Barbara,CA 93101-1656 Santa Barbara,California tgaasch@santabarbaraca.gav
Asphalt cligauts to repair failed areas,tree root pruning,concrete curb&gutter replace asphalt cold mill asphalt hot ma overlay,
truncated domes,curbs,striping,signs,roadway name stamps,
•
865302 State of California Department of Hwy 1 Cambria RHMA-O Transportation Prime Contractor N/A Rick Silva 53,540,241 9/19/2019
Transportation Contract Number.05-1K3004 (805)927-4559 Fax N/A
1727 30th Street Cambria,Califomia rick.silva@dotca.gov
Sacramento,CA 9 5 816-70 0 5
841434 State of Califomia Department of Caltrans 09-365904 Lone Pine SR-136,395 Transportation Prime Contractor N/A Chris Talbot,RE 45,49E 035 10/29/2019
Transportation Contract Number.09-365904 (760)937-8948 Fax N/A
1727 30th Street Lone Pine,Califomia chris.talbot@dotcagov
Sacramento,CA 95816-7005 Cold plane and place hot mix asphalt and install roadside signs AT AND NEAR LONE PINE ON SR-136 AT SR-395 AND ON SR-395 FROM
12 MILES SOUTH OF SR-136 TO EAST INYO STREET;2.8 miles near Diaz Lake to the south end of Lone Pine Work performed on 2 lanes
in each direction and a paved median throughout a large portion of the project We cold planed 138,537SY and paved 28,845TN of HMA.
Our subcontractors removed and replaced in excess of 50 roadside signs and striped approximately 100000LF.
683674 State of Califomia Department of Highways 1,9,35&236 Emergency Slide Repairs,Santa Cruz County Roads/Highways Prime Contractor N/A Jennifer Wilson,Resident Engineer 57,534,520 12/10/2019
Transportation Contract Number.05-1H7904 (805)471-2103
1727 30th Street Santa Cruz County,California Fax:N/A
Sacramento,CA 95816-7005 Remove Slides,Restore Roadway-Granite performed storm damage cleanup.Granite did a8 of the following soldier beam wall,deep lift jenniferwilson@dotcagov
paving,hilfkerwall,and crib wall reinforcement
77834E State of Califomia Department of Hwy 68 Cold Plane&HMA-O Overlay Roads/Highways Prime Contractor N/A Tyler Layering,Resident Engineer ' 53,230,825 6/28/2019
Transportation Contract Number.05-1G4504 (831)375-1621
1727 30th Street Monterey,California Fax(831)375-1621
Sacramento,CA 95816-7005 Cold plane,overlay 1,550 TN hot mix asphalt and 4,930 TN HMA-0,along with rumble strips,guardrail and 250 LF concrete bonier. tyleclavering@dotca.gov
Updated:March 2020 Appendix 2af 8
GRAnITE
Granite Construction Company -
2019 Com•feted Job Schedule Greater Than$3 Million
Job ID Name and Address of Owner Name,Location of Project,and Kind of Work Work Type Category Prime or Name of Contractor(if Owner Contact, Contract Actual
Subcontractor sub) Amount Completion
Date
801169 City of Monterey North Fremont Street Bike/Ped Improvements Transportation Prime Contractor N/A Andrea Benny,Principal Engineer 58,522,910 6/4/2019
580 Pacific Street Contract Number.37C1856 (831)646-3447
Monterey,CA 93940 Monterey,California Far(831)646-3405
Demolition of misting improvements,construction of Class IV hike lanes,sidewalk median modifications,shared bicycle/bus lane,ADA Bnny@monterey.org
upgrades,signal modifications,and conforming new improvements to existing site conditions on North Fremont Boulevard.
787341 Sequel Union Elementary School District Sequel Unified Elementary School District,Earthwork&Paving at Four Schools Infrastructure/Site Dev Prime Contractor N/A Michelle Kennedy 53,681,471 8/9/2019
620 Monterey Avenue Contract Number.BID PACKAGE A Assistant Superintendent
Capitals,CA 95010 Capitela,California (831)464-5632
Site work at 4 pubic school sites,including:Site Demo;Earthwork;Subgrade Preparation;Base and Paving;Construction of Bioswale; Fax(831)479-7182
Handrail and Fencing. mkennedy@suesd.org
860611 Vistra Energy Vistra Moss Landing BESS Concrete Structural Modifications Infrastructure/Site Dev Subcontractor Bums&Mcdonnell David Warakomski 511,187,436 9/30/2019
Hwy 1&Dolan Road Contract Number.110288 Engineering CO Inc (989)423-9371
Moss Landing,CA 95039 Moss Landing,California djwarakomski@hurnsmcd.cam
Project consisted of modifying the misting turbine facility to accommodate 300MW of Batteries.Granite's scope included backfiling Sean P.Kenny,PE
existing voids within misting floor of the building,placing 6'thick and 8'thick concrete slabs,and installing 22'thick elevated slabs for (657)286-9117
second floor battery storage. spkenny@bumsmcd.com
865875 County of Santa Cruz Chanticleer Pak Phase 1 Infrastructure/Site Dev Prime Contractor N/A Will Fourt $3,434,153 1/22/2020
701 Ocean Street Suite 330 Contract Number.18C1-004 (831)454-7910
• Santa Cmz,CA 95060 Santa Cm;California willfourt@santacmzcounty.us
Construction of neighborhood park,including:erosion control;relocation of public artwork earthwork;drainage;construction of
bioretention areas;sanitary sewer,domestic water line;site electdcak onsite parking;concrete planters and seat walls concrete flatwork;
planting and irrigation;site furnishings and playground equipment and playground safety surfacing.
813966 City of Dublin Dublin Blvd Widening Transportation Prime Contractor N/A Michael Boitnott Capital Improvement 56,662,122 2/28/2019
100 Civic Plaza Contract Number.ST1012 Pmgram Manager,
Dublin,CA 94568-2658 Dublin,California (925)833-6630
Street widening,including removal of 6,210 LF concrete curb&gutter and 26,000 SF of sidewalk;removing 27,500 SF of asphalt concrete Fax(925)829-9248;
pavement slurry seal parking lot,maintaining traffic and furnishing traffic control throughout construction,replacement of traffic signals michael.boitnott@dublin.ca.gov
and related facilities,installation of 25,000 SF of sidewalk paving,7,200 LF of curbs and curb&gutters,placement of 5,300 TN of Hot Mix
Asphalt Concrete,installation of a pedestrian bridge,adjusting utility facilities,street lights,landscaping,irrigation,drainage
improvements,installation of thermoplastic traffic stripes and pavement markings and reflective pavement markers,and installation of
traffic signs.
924183 City of Pleasanton Pleasanton Annual Street Resurfacing and Preventative Maintenance Transportation Prime Contractor N/A Huy Ho,PE S3,894,965 11/15/2019
•
P.O.Box 520 Contract Number.18503 (925)931-5663
Pleasanton,CA Pleasanton,California Fax(925)931-5479
City street resurfacing,including:14,703 TN of overlay and 256,097 SF(6,551 TN)of AC digeuts;paving mat,crack sealing,pavement Hho@cityofpleasantoncagav
striping and marking,parking lot widening;
788409 State of California Department of Sherwood Rd Geometric Upgrades Transportation Prime Contractor N/A Nash Munes $4,587,797 6/1/2019
Transportation Contract Number.01-262044 (707)223-0791 Fax N/A
1727 30th Street Willits,California Email:N/A
Sacramento,CA 95816-7005 State Highway 101 and city streets in Willits from 0.7 mile North of Route 20 to 0.9 mile North of Route 20 and Sherwood Road.Performed
geomettric upgrades including removal and replacement of curbs,gutters and sidewalks.
Updated:March 2020 Appendix 3o1 8
GRA111TE •
Granite Construction Company •
2019 Com•leted Job Schedule Greater Than$3 Million
job ID Name and Address of Owner Name,Location of Project,and Hind of Work Work Type Category Prime or Name of Contractor(If Owner Contact. Contract Actual
Subcontractor sub) Amount Completion
Dale
815011 State of California Department of Highway 20-175 Fire Rehab Roads/Highways Prime Contractor N/A Dan Kraft $7,443,708 12/31/2019
Transportation Contract Number:01-0t3704 (707)994-5074 Fax N/A
1727 30th Street Lakeport,Calilomia • dan.kraft@dotca.gov
Sacramento,CA 95816-7005 Emergency work to repair fire damaged areas of Hwy 20 and Hwy 175 in lake County due to wildfires.Work consisted of repairing and/or
replacing guardrails,drainage systems,pavement,fencing,guardrail vegetation barriers,and roadside signs.Traffic control,hazardous tree
removal,SWPPP and erosion control were also included.
821889 State of Califomia Department of Hwy 20-29 Culvert Replacements Transportation Prime Contractor N/A Dan Kraft 43,594,616 11/1/2019
Transportation Contract Number.01-427804 (707)994-5074 Far N/A
1727 30th Street Lake County,California dan.kraft@dotca.gov
Sacramento,CA 95816-7005 Drainage system improvements to various culverts located on Highway 20 and Highway 29 in Lake County.Work consisted of removing
existing failing culverts and replacing approximately 2500 LF of polymer coated cot negated steel pipe,2,500 LF of cured in place pipe liner,
100 LF box culvert.Five concrete headwalls including slurry backfill and trench paving.
810982 City of Indio Madison Street Improvements Transportation Prime Contractor N/A Tom Rafferty 46,921296 8/29/2019
Civic Center Mall Contract Number.ST503K (760)391-4017 Fax N/A
Indio,CA 92201-4434 Indio,California Email:N/A
Widen Madison Street The work includes asphalt paving,concrete construction,drainage installations,traffic signal installations,
landscaping and irrigation,water relocations and upgrades,traffic contort surveying,conduit installation,wall installation,raising utilities,
pot-holing,and related work to widen a four lane road.
812398 City of El Centro Ec Labrucherie Ave Widening In, Roads/Highways Prime Contractor N/A Abraham Campos $3,242,668 5/17/2019
1275 Main Street Contract Number.N/A (760)337-4505 Far N/A
El Centro,CA 92243-2816 El Centro,California Email N/A
Widen city street full depth replacement PCC curb,sidewalk,driveway,storm drain,manholes and signal fight
832465 BNSF Railway Company Barstow Interim Intesmodal Fac Transit/Rails Prime Contractor N/A Miguel Peloino 515,414,578 5/1/2019
2301 Lou Menk Drive Gob 1W Contract Number.BF10014160 (909)841-0040 Fax N/A
Fort Worth,IX Barstow,California Email N/A
This project consisted of the clearing and demolition of structures within the project
footprint,the construction of two(2)3,100 IF working tracks and a 16 acre parking lot located on the southwest side of the BNSF Barstow
Yard.Also includes grading,drainage,relocation of water
mains,sanitary sewer,a lift station,a 12'x40'modular building,a gate booth,a Crane maintenance Canopy,concrete crane maintenance
pads,a 40'crane maintenance storage container,asphalt paving,concrete craneways,electrical work including 7 highmast fights,fencing,
pavement markings and relocation of a fiber-optic ductbank.
846699 County of Riverside Box Canyon Road Repair Roads/Highways Prime Contractor N/A Hector Davila 43,000,000 3/31/2019
PO Box 1090 Contract Number:4 5-1 91 9 0101 (909)677-8888 Far.N/A
Riverside,CA 92502-1090 Mecca,Califomia HeDavila@rrvco.org
Storm damage repair work
856867 State of California Department of 08-111804110 Digouts Overlay Transportation Prime Contractor N/A Khoi Vu 43,792,317 4292019
Transportation Contract Number.0 8-111 8 0 4 (951)232-6263 Fax N/A
1727 30th Street Desert Center,California Khoi.vo@dotca.gov
Sacramento,CA 95816-7005 Project included HMA digouts at bridge approaches and departures alaong a 35 mile section of 110 for both east and west bound lanes.
874727 Bather Motorsports Park LLC Barber Motorsports Park Transportation Prime Contractor N/A Mark Whitt 55,239,676 8/312019
6030 Barber Motorsports Parkway Contract Number. (205)699-7275 Far N/A
Birmingham,AL Birmingham,Alabama mwhitt@barbennuseure.org
Repave race track
876151 County of Riverside No Indian Cyn And Gillman Spr • Transportation Prime Contractor N/A Tustin Robbins $4,768,120 11/15/2019
PO Box 1090 Contract Number.C6-0089 AND C9-0059 (951)237-4280 Fax N/A
Riverside,CA 92502-1090 Moreno Valley,California jmbbins@rivco.org
North Indian Canyon Drive,Widening Project Phase 1,29th Avenue to 18th Avenue,Cities of Palm Springs and Desert Hot Springs and
Gilman Springs Road Resurfacing,Moreno Valley City Limit to State Highway 79,Gilman Hot Springs Area
Updated:March 2020 Appendix 4of 8
GRAIIITE
Granite Construction Company -- - -- -
2019 Com•feted Job Schedule Greater Than$3 Million
job ID Name and Address of Owner Name,Locution of Project,and Kind of Work Work Type Category Primeor Name of Contractor(If Owner Contact Contract Actual
Subcontractor sub) Amount Completion
Dote
715392 American Honda Motor Company Pd Honda Ride Roads Roads/Highways Prime Contractor N/A Jason Kist S5,054.358 1/15/2019
1919 Torrance Blvd,Bldg 320 Contract Number. (310)783-013
Torrance.CA 90501-2746 Cantil,Caiifomia Fax N/A
Grade/Base/Ac/Concrete Email:N/A
748229 Limoneira Lewis Community Builders LLC Vt Limo neira East Area 1 Roads/Highways Prime Contractor N/A Tony Marro $19,429,000 1/30/2019
1156 North Mountain Ave Contract Number EA-1-LIMONEIRA (805)823-3278
Upland,CA 91786 Santa Paula,California Fax N/A
Site rough grading 370 crease flat to gentle incline The area to be graded consists of approximately 370-acres of mostly flat to gently tony.marro@Iewismccom
incline terrain located between Telegraph Road on the south,ascending hillside terrain on the north,Haun Creek on the east and Santa
Paula Creek on the west In general rough grading will consist of unclassified/common excavations involving mass excavation,lot and
street over excavations,unsuitable soil removals,handling of oversize rock materials,site finish grading,SWPPP/dust control related
activities and compliance Alternate bid work consists of excavations for deep utilities,and top-loading and processing of overly moist fill
materials,and handling/compacting import provided by others.
802688 Mian Development Corporation Vt Camarillo Hills Drain Imp Pavement Preservation Subcontractor Mian Development lobe Mathews $4,989,622 2/1/2019
24150 Park Sorrento Contract Number.04-13 Corporation (8051 660-0751
Calabasas,CA 91302-4101 Camarillo,California Fax N/A
Demolition of existing concrete channel.Placement of new twin RCS precast culvert approximately 1,200 If ` Emaik N/A
813799 Palmdale,City Of Pd 2018 Arterial Overlay Pmgr Roads/Highways Prime Contractor N/A David Wu S3245,497 1/31/2019
38300 N Sierra Hwy Contract Number.748 (661)267-5338
Palmdale CA 93550-4798 Palmdale,California Fax N/A
construction of a 2'TRMAC overlay on sections of 3 different arterial streets in the City of Palmdale;The work may consist of,but is not Email:N/A
limited to:traffic control plan design&implementation,asphalt grinding,TRMAC paving,thermoplastic striping,traffic loop restoration,
and utility/survey monument adjustment
825479 First Solar Electric Pd Phoebe Solar Power Subcontractor First Solar Electric Inc Luke Adams S17,886,491 5/16/2019
350 West Washington Street Contract Number- Phone Number.
Tempe,AZ 85281-1496 Kermit,Texas Fax N/A
Installation of 120.0004761(15'structural H beam bearing piles.Mechanical installation 9,000 rows of NEXTracker Horizon single axis lueas.adams@frstselar.mm
solar tracker.3,000 acre,250 MW utility scale solar installation.
856991 Rio Tinto Materials Pd Rio Tinto Pond Retrofit Mining Prime Contractor N/A Roni Lima 45,390,387 13/312019
14486 Borax Road Contract Number.CW2129657 (760)762-7000
Boron,CA Boron,California Fax N/A
Site grading,concrete rehabilitation,sump and pump installation,concrete pad placement HDPE liner placement Electrical component Emaik N/A
installation.
831626 State of California Department of Hay 1-5 Near Huron Transportation Prime Contractor N/A Din Daddawalla 112,140,069 7/31/2019
Transportation Contract Number.06-000804 (559)417-5927
1727 30th Street Cantua Creek,California Fax N/A
Sacramento,CA 95816-7005 Panel replacement cold plane,HMA and RHMA paving,and MGS.Road Reconstruction&RHMA Overlay dindaddawalla.dotca.gov
692674 State of Caiifomia Department of FrJ-S Rhma Overlay-Las Banos Transportation Prime Contractor N/A Brent Haroldsen 530,235,993 7/31/2019
Transportation Contract Number.10-1H4104 (559)246-6410 Fax N/A
1727 30th Street Las Banos,Caiifomia brentharoidsen@dotcagov
Sacramento,CA 95816-7005 10'RHMA Overlay and shoulder improvements for 17 Miles on I-5.
860502 State of California Department of Hwy 99 Betty Drive Transportation Prime Contractor N/A Mandip S.Sandhu S10,154,485 9/30/2019
Transportation Contract Nov 06-471504 (559)246-9433
1727 30th Street Tulare County,CA Fax(559)243-3825
Sacramento,CA 95816-7005 The new interchange encompasses a new Betty Dr.oveicrossing with signafized on and off amps.Several surrounding County of Tulare
roadways will be improved with widened travel lanes,signalized intersections,upgraded roadway surfaces and a new storm drain system
and basins.SR99 will be upgraded with emergency shoulders a new pumping plant to handle the storm water below the new
overcrossing.
715242 Pacific Gas and Electric Company PG&E Lemoore Center Substation Subcontractor Roebbelen Contracting,Inc. Roebbelen Contracting,Inc 13,961,346 9/11/2019
245 Marker Street Contract Number.21-16-400 1241 Hawks Flight Court
San Francisco,CA 94105 Lemoore,Caiifomia El Dorado Hills,CA 95762
Sitewark,Grading,Concrete Sw/Curbs and Parking lot paving
Updated:March 2020 Appendix Sof 8
GRAIIITE
Granite Construction Company -
2010 Com•feted Job Schedule Greater Than$3 Million
Job ID 'Name and Address of Owner Name,Location of Project,and Kind of Work Work Type Category I'rlme or Name of Contractor(If Owner Contact Contract Actual
Subcontractor sub) Amount Completion
Date
778210 State of California Department of FR_HWY I-5 near Lost Hills Transportation Prime Contractor N/A Sunil Gandrathi $18,197,700 1/11/2019
Transportation Contract Number.06-054904 (559)999-5733
1727 30th Street Kettleman City,Califamia Fax N/A
Sacramento,CA 95016-7005 Replace faired concrete slab sunil.gandrathi@dot.cagov
831626 State of California Department of Hay l-5 Near Huron Transportation Prime Contractor N/A Din Daddawalla 312,140.069 8/27/2019 •
Transportation Contract Number.06-000004 (559)417-5927
1727 30th Street Cantua Creek,California Fax N/A
Saoramento,CA 95816-7005 Panel replacement cold plane,HMA and RHMA paving,and MGS.Road Reconstruction&RHMA Overlay. dindaddawaladotcagov
859586 Spsg Partners SacPacific Heights Dump Fc Environmental Prime Contractor N/A Todd Thalhamer 49,912,188 12/31/2019
4010 West Chandler Avenue Contract Number.l (916)341-6356
Santa Ana.CA Oroville,California (530)391-2230
Recycle debris from Widfore todd.thalhamer@calrecycle.ca.gov
796267 State of California Department of Hwy 79 Julian Bwc Roads/Highways Prime Contractor N/A Rene Figueroa 46,42E601 1/24/2019
•
Transportation Contract Number.11-2N0184 (858)688-1551
1727 30th Street Julian,California Fax N/A
Sacramento,CA 95816-7005 Apply Bonded Wearing Course Overlay,Shoulder Backing and Cold Plane. rene.8gueroa@dotca.goc
814459 San Diego County Regional Airport Authority Rehab Cross Taxiways Airports Prime Contractor N/A Ted Rigo 47,262,361 3/21/2019
3225 North Harbor Drive Contract Number.104220R (303)908-4052
San Diego,CA 92138-2776 San Diego,Califomia Fax N/A
The project provides rehabilitation of Cross Taxiways 131,64-137.C3,C4,and C6,which includes milling and overlay nominal 5 to 6-inch full •
depth replacement of asphalt pavement approximately 260,555 square feet of pavement surface;removal and replacement of failed
subgrade;reconstruction of a portion of Taxiway B1 with concrete pavement;relocation ofwestem edge of pavement and associated
edge marking,fighting and taxiway signs,realignment of Taxiway C6 including construction of new Taxiway full strength and shoulder
pavement,mill and asphalt inlay.This brings the total area to about 294,595 SF;and airfield fighting relocation,replacement of impacted
striping,marking,
730763 Port Of Pasco Pas-Pop General Aviation Apron Airports Prime Contractor N/A Lee Unterwegner,P.E. $4,826,147 9/18/2019
PO Box 769 Contract Number.3-53-0046-044 (509)783-2144(0)
Pasco,WA 99301-1211 Pasco,Washington (509)360-7900(F)
Reconstruction of appro.60,000 SY of the airport.Removal of concrete pavement,excavation,subgrade prep.,placement of stoma water Iju@gub.com
pipes,catch basins,trench drains,peercolation trenches,CSBC,HMA,aircraft tie doesn,apron fighting and pavement markings.
863786 State of Washington Department of Wen-Ncr Seal 2019 Transportation Prime Contractor N/A Brian Person 48,358,140 10/1/2019
Transportation Contract Number:9365 (509)667-2881 Fax N/A
PO Box 47420 Okanogan,Grant County and Mattawa Washington penrson5@wsdotwa.gov
Olympia,WA 98504-0001 Removing misc.traffic items,removing guardrail,pavement repair excavation,roadway excavation incl haul,embankment compaction,
crushed surfacing base haul,emulsified asphalt,asphalt for fog seal furnishing and placing crushed screenings,crack sealing,HMA for
preleving and pavement repair and other work.
7136125 State of Washington Department of Bhm Sr9&Sr20 Park Cottage Roads/Highways Prime Contractor N/A Shane Spahr 43,284,277 5/29/2019
Transportation Contract Number.9221 (360)848-7103 Fax N/A
PO Box47420 Sedro Woolley,Washington spahrs@wsdoLwa.gov
Olympia,WA 98504-0001 Mainline HMA paving,Fog seal,curb/gutter,sidewalk,pedestrian curb,raising utilities,planing bitumiNous pavement,striping
853077 State of Washington Department of Evt Sr104 Vic-164Th St Paving Transportation Prime Contractor N/A Shawn Neil Wendt P.E 47,627,820 11/30/2019
Transportation Contract Number 9330 (425)225-8726 Fan N/A
PO Box 47420 Mountlake Terace Washington wendts@wsdotwagov
Olympia,WA 90504-00D1 22 miles of northbound I-5 between SR 104 and 212th Street Southwest in Mountlake Terrace.Crews ground off about two inches of
asphalt and epaved it with fresh asphalt The crews eke repaved the ramps connecting 1-5 with the 164th Street interchange north of
Lynnwood.
•
857279 State of Washington Department of Bhm I-5 To Britton Paving Transportation Prime Contractor N/A Melissa Ambler 44,745,198 10/21/2019
Transportation Contract Number.9362 (360)788-3400 Fax N/A
PO Box 47420 Bellingham,Washington amblerme@wsdotwagev
Olympia,WA 98504-0001 Crews Repined three miles of State Route 542 in both directions between 1-5 and Britton Road.Highway crossings were improved,a
culvert replaced near Dewey Road and in partnership with city of Bellingham,a stretch of sidewalk was added near Applebee's.These
improvements provide Bellingham area drivers,cyclists and pedestrians smoother and easier access along this busy stretch of SR 542.
Updated:March 2020 Appendix 6of 8
GRAflITE
Granite Construction Company - -
2019 Corn•feted Job Schedule Greater Than S9 Million
Job ID Name and Address of Owner Name,Location of Project,and Kind of Work Work Type Category Prime or Name of Contractor(if Owner Contact Contract Actual
Subcontractor sub) Amount Completion
Date
9071132 State of Washington Department of Oly SrB Us12 To Wilson Paving Transportation Prime Contractor N/A John Romero S3,313,283 10/20/2019
Transportation Contract Number.9411 - (360)870-2994 Fax N/A
PO Box 47420 Elma,Washington Romeroj@wsdotwa.gov
Olympia,WA 98504-0001 Improvement of 13.75 miles of SRB in Grays Harbor County and Thurston County.Pavement repair,planing bituminous pavement,paving
with HMA CL 1/2'PGSBH-22,removing monument cases and covers,modifying expansion joint sealson bridges,resurfacin gbridge deck
and replacing waterporrof membranes on bridges,pavement markings,delineation,traffic control in accordance with contract plans.
• 652565 Nevada Department of Transportation SR 28 Shared Use Path-Pedestrian Bride Roads/Streets Prime Contractor N/A Nick Johnson,PE S37,244,818 12/31/2019
1263 South Stewart Street Contract Number.3671 (775)430-0995
Carson City,NV 89712-0001 Incline Village,Nevada Fax N/A
Construction of a 10 foot wide Shared Use Path for Pedestrians and Bicycles.Retaining walls,tunnel crossing,pedestrian rail grading,rock Email:njohnson@dotstate.nv.gov
fracturing,tree removal,drainage,rumble strips,guardrail barrier mils,erosion control paving,grading,retention basins,culverts,
shoulders and bridge construction.
834545 Nevada Department of Transportation NDOT 3739 US 50 Clear Creek Roads/Highways Prime Contractor N/A Bhupinder Sandhu $8,271,003 12/31/2019
1263 South Stewart Street Contract Number.3739 (775)434-3458 Fax:N/A
Carson City,NV 89712-0001 Gardnerville,Nevada bsandhu@dotstatenv.gov
Multiple storm drains,drop inlets,trench drains,slope flattening,grading,concrete curb,gutter,channel work guardrail and concrete
barrier rail.
772612 O&D Construction,Inc. Poulakidas Elementary Sitework Infrastructure/Site Dev Subcontractor O&D Construction,Inc. Washoe County Schools District S3,531,9(15 5/30/2019
1050521st St South Contract Number.15079 (775)34B-0200 Fax N/A
Sparks,NV Reno,Nevada
Mass grading,base,paving,striping,electrical and curb and gutter.
848241 Nevada Department of Transportation NDOT 3702 Ready Kietzke[ample Transportation Prime Contractor N/A Sam Thompson 13,005,595 7/31/2019
1263 South Stewart Street Contract Number.3702 (775)888-7070 Far.N/A
Canon City,NV 89712-0001 Reno,Nevada Email N/A
Pedestrian and ADA Improvements.Curb,Gutter,Base,Paving,sidewalk and ADA Ramps.
730529 Kennecott Utah Copper Ewr Mine Access Road Mining Civil/Site Infra Prime Contractor N/A Eric Eatherton S4,061,574 3/31/2019
B362 West 10200 South Contract Number.3102/307775 (801)569-6261 Fax N/A
Bingham Canyon,UT 84006-1197 Bingham Canyon,Utah enceathertan@riolnta.com
Project was to dump mine trucks to create new access mad alignment This new alignment was needed to expand the mine dumps to the
East creating new dump area Granite dumped and dozed appmimatey 2 million TN of material.
800463 Snowbird Resort LIC Snowbird Bridge Bridge Only Prime Contractor N/A Idima Mahak S3,056,875 3/31/2019
9385 S.Snowbird Center Dr Contract Number. (801)634-4375
Snowbird,UT Snowbird,Utah Fax N/A
The Pedestrian Bridges at Snowbird provides guests easier and safer access to the Cliff Lodge,Snowbird Center and Peruvian Lift.The 70- nmahak@snowbird.com
foot Peruvian Bridge provides direct access,over Little Cottonwood Creek connecting the Peruvian Lift to the Snowbird Center and Aerial
Tram.The 400-foot Chickadee Bridge has three sections that am mostly covered with three landings and connects the Cliff Lodge Hotel
to the Snowbird Center and Aerial Tram.Guests can rest at each of the landings and take in the incredible scenery of the natural
surroundings.The Snowbird Bridges greatly improve the overall visitor experience and safety while preserving skiing pathways that pass
underneath.
806048 Kennecott Utah Copper Tailings Capping Mining Civil/Site Infra Prime Contractor N/A Ryan Bradley S6,644,758 12/31/2019
B362 West 10200 South Contract Number.3103314188 (801)652-5794
Bingham Canyon,11T 84006-1197 Magna,Utah Fax N/A
This project was the reclamation of tailings dumps at the KUC tailing area in Magna UT.Granite regraded the routing tailing dumps to a ryan.bradley@riotinto.com
2.5:1 slope to decreaseoverall slope When regrade was complete Granite hauled 213,000 TN of cover material and placed on slopes so
•
vegatation can begin growing.
•
Updated:March 2020 Appendix 7of 8
GRAIIITE
Granite Construction Company - - - -
2019 Com•feted Job Schedule Greater Than S3 Million
job ID Name and Address of Owner Name,Location of Project,and Kind of Work Work Type Category Prime or Name of Contractor(If Owner Contact Contract Actual
Subcontractor sub) Amount Completion
Date
818764 Ogden City Corporation Hinckley Airport Airports Prime Contractor N/A Charles Kellerman S5,500,561 7/1/2019
2549 Washington Blvd.,Suite 761 Contract Number.3-49-0024-048-2018 (303)782-0882
Ogden,to 84401 Ogden,Utahe project was a major maintenance project that include work on every taxiway.Two taxiways were milled and ovedayed(3703 Fax N/A
Ton),one was ovedayed and reprofiled(11,485 ton),one was completely rebuilt(6,947 ton)and one was removed and reconstmcted on a ckellermon@adgairports.cam
new alignment(5,257 ton).The two that were rebuilt included new stormdrain(5,5001f)and electrical.The oveday portion did include new
decrial as well.Granite did have some additional maintenance work that included excavating a setteling pond and restriping some
parking areas as well The project began in fall of 2018 and was suspended throught the winter.Granite reconveined in spring of 2019.
5.5M in total revenue.
846143 Utah Department of Transportation Sr-55;Price Bridge Rehab Bridge Only Prime Contractor N/A Brent Hadfield 34,669,140 9/302019
4501 South 2700 West Contract Number.F-0055(18)0 (435)820-4774
Salt Lake City,UT 84107-1430 Price,Utah Fax N/A
The Price Bridge Rehab project featured the removal and replacement of its bridge deck which spanned 680 feet over the Union Pack bhadfield@utah.gov
Rail Road and Price Main Street The bridge deck was approximately 34,446 SF and was replaced with partial depth,precast panels,827 CY
of low shrink-fiber reinforced concrete for the deck and 300 CY of AA(AE)Structural Concrete for all other items.The bridge deck received
a thin bonded polymer overlay,pre-fabricated deck drains/down spouts,expansion joints and a new black vinyl schedule 80 fence along
the north parapet&sidewalk curb walL The project also replaced the asphalt approaches(roughly 600 TNs),followed by with chip seal and
precast barrier.
846153 Utah Department of Transportation 2700 North Roads/Highways Prime Contractor N/A lace Mecham S5,476,149 11/30/2019
- 4501 South 2700 West Contract Number.F-0134(21)11 (435)230-29139
Salt Lake City,UT 84107-1430 West Haven,Utah Fax N/A
This was considered a tealfice choke point correction on 1-15 off ramp to 2700 N.91,473 SY of Milt 16,277 TN Overlay HMA with 112,485
SY BWC.8.725 CY material removed for widenings,with C&G and sidewalk imporvements throughout the project.5 signaled intersections
were widened and traffic lanes added.The project coordinated with Union Pacific RR for an entire RR crossing rebuild.
836915 Florida Department of Transportation Hafb Runway Rehab Transportation Prime Contractor N/A April Williams 05,285,795 7/3/2019
605 Suwanee Street Contract Number.850-330-1617 april.williams@dotstate.8.us
Tallahassee,FL 32399 Pensacola,Florida
Emergency Repair Contract-Replacement of Post Tensioned Tendons fora Precast Segmental Bridge
Updated:March 2020 Appendix Bof 8
GRAnITE
TI
Banking Reference
BANK OF AMERICA
Mukesh Singh,Vice President
One Bryant Park, 18th Floor
New York, NY 10036
(646) 743-2640
Email: msingh64@baml.com
Company has maintained a banking relationship since 1931
Accounts:various
Line of Credit as of September 30, 2020:
Credit Line: $275,000,000
Available: $155,928,336
Against Line: $119,071,664
Secured by Equipment and Real Property holdings
Expires/matures: 5/31/2023
Security
Required: Yes
Bank Rating: A+/Aa2/AA
Updated November 2020 Appendix Page 1 of 1
GRAr1ITE"
Granite Construction Company
Construction Experience of Key Personnel
Western Washington Region
Name Years of Experience Monetary Value of Work ___ _____Ty_pe of Work Job Capacity
Vance Aeschleman 26 Over$150M A,B,I,J,M,O,P PM, EST
Blake Ambler 13 Over$100M A,B,F,M,P PM, EST
Kyle Aamot 7 Over$50M A, F I,L,M, P PE, EST
Russell Bassett 5 Over$50M A,B PE
Luke Bentley 11 Over$75M A,B,E,F,G,I,J,L,M,O,P PM, EST
McCall Booth 6 Over$25M A,B,P PM
Bill Brickey 19 Over$200M A,E,G,H,I,M,N,O,P OM
Lance Chambers 8 Over$150M A,B,F,L,P PE, EST
Steve Chambers 31 Over$200M A, B, E, F,H, I, M,O, P SUPT
Jacob Critcher PE, EST
Jeremy Deemer 29 Over$200M A,F,G,I,J,P AM
Beth Duffus 12 Over$100M A,F,G,P PM, EST
Barrett Shane 24 Over$200M A,G,H,I,M,N,P OM
Nick Gerritsen 10 Over$10M A,P PE, EST
Quinn Golden 18 Over$200M A,B,I,F,M,P SR PM
Bianca Guzman
Zach Hanna 20 Over$100M A,B,E,F,G,I,P SUPT
Paul Harding 21 Over$335M A, B, E,F, G,I,K, P AM
Cody Hookland 4 Over$40M A,I,P PE
Nick Lupo 20 Over$425M A,B,E,F,G,H,M,P LP PM
Deanna Matson 15 N/A F SAFETY
Rod Majors 31 Over$150M A,E,F,G,H,I,P OM
Jason Marlowe 29 N/A F SAFETY
Jimmy Mattioli 23 Over$25M A, P EST
Stephanie McFarlane 5 Over$23M A PM
Ron Nelson 32 Over$200M A,B,E,F,G,H,I,J,M,P SUPT
Bradford Novy 6 Over$50M A, B, H, I PE, EST
Updated:January 2020 Appendix Page 1 of 3
GRAflITE'
Granite Construction Company
Construction Experience of Key Personnel
Western Washington Region
__Name^ _ . ._Years of Experience; Monetary Value of Work _ ______Type of Work __ _ ____ __ Job Capacity__ __
Mitch O'Donnell
Ryan Olson 26 Over$400 M A,B,C,F,H,I,J,M,O,P SENIOR PM
Gairrett Orelup
Mark Ottele 19 Over$100M A,B,E,F,I,J,M,O,P SENIOR PM
Jim Prouty 25 Over$200M A,B,C,I,G,P SR EST
Terrence Seales 5 Over$10M A,B,I,P PE, EST
Aaron Searcy PE, EST
Steve Schlimmer 30 Over$75M A,B,E,I,L,M,P EST/SUPT
Tate Shelton SAFETY
Bo Smith 14 Over$470M A,B,E,F,G,H,I,L,M,P AM
Mike Stein 19 Over$300M A,B,F,H,I,G,L,P AM
Jason Styger 17 Over$75M A,E,G,I,P PM/EST
Andrew Thompson 32 Over$250M A, B, E, F, G, I, J, P SENIOR PM
Brian Tisch 20 Over$300M A,B,C,F,H,I,M,P PM
Loren Tonsgard 28 Over$75M A,F,G,I,P SUPT
Nick Valpiani 17 Over$50M A,B,E,G,I,N,P PM
Travis Walken 21 Over$300M A,B,G,I,M,P CEST
Gavin Wartick
Pete Welch 33 Over$100M A,B,D,E,F,H, SR EST
Rob Withers 36 Over$100M A,G SUPT
Rob Wynegar 14 N/A F SAFETY
Heather Young 15 Over$5M A, J, P EST
Grant Youngren 19 Over$200M A, B, E, F, G, I, P SENIOR PM
Updated:January 2020 Appendix Page 2 of 3
GRAI1ITE
Granite Construction Company
Construction Experience of Key Personnel
Western Washington Region
Name Years of Experience_ Monetary Value of Work Type of Work_ Job Capacity
Type of Work Job Capacity
A-Highways I-Railroad AM-Area Manager QC-Quality Control
B-Structures J-Building BM-Branch Manager Supt-Superintendent
C-Dams K-Power Plants ABM-Asst.Branch Manager Safety-Safety Engineer
D-Tunnels L-Refining PM-Project Manager RCE-Reg.Civil Engineer
E-Pipelines M-Environmental CM-Construction Manager OM-Operations Manager
F-Safety N-Mining EST-Estimator EM-Estimating Manager
G-Airports 0-Water Treatment CEST-Chief Estimator Eng Svcs Mgr-Eng Services Mgr
H-Marine P-Sitework PE-Project Engineer
Updated:January 2020 Appendix Page 3 of 3
•
Underutilized Disadvantaged Business
war Washington Stato Enterprise(UDBE) Written
Daptsrtenattt of hanspotrtationI
Confirmation Document
See Contract Prnrisinns: UDBE Document Submittal Regrria'nrents
Disadvantaged Business Enterprise Participation
THIS FORM SHALL ONLY BE SUBMITTED TO A UDBE THAT IS LISTED ON THE CONTRACTOR'S
UNDERUTILIZED DISADVANTAGED BUSINESS ENTERPRISE UTILIZATION CERTIFICATION.
THE CONTRACTOR SHALL COMPLETE PART A PRIOR TO SENDING TO THE UDBE
r:1RT A:To Iu mudded In the bidder
The entries below shall he consistent with what is shown on the Bidder's Underutilized Disadi,antaged Business
Enterprise Utilization Certification.Failure to do so will result in Bid rejection.
Contract Title: 201°) (^�4�t w t cwT l tktT v w wv4. S
Bidder's Business Name: _ v^-psi`' "'"��16�rStu CON39.:14
UDBE's Business Name: CitsSf�jyy� �yV xrk-(.,irinkru.t ils In L•
Description of UDBE's Work: _C.EKf t/t.Et_ ' ire} cv
Dollar Amount to be Applied Towards UDBE Goal: V-(r 2 ZS.'�
Dollar Amount to he Subcontracted 10 UDBE": z`f •4.• •
waned F e!d
?AR l K:to he comnlcled In the Underutilized Distrd••nnlaeed Buvinesb Enterprise
As an authorized representative of the Underutilized Disadvantaged Business Enterprise.I confirm that we
have been contacted by the Bidder with regard to thc.rcfcrcnccd project for the purpose of performing the Work
described above. If the Bidder is awarded the Contract,we will enter into an agreement with the Bidder to
participate in the project consistent with the information provided in Part A of ihiis form.
�
Name(printed): )try\ TJIt�5o" 1
•
Signature:
Title: `�reSTete.A.
Address: 112 Mee olt'a - Date: r9I o'1
/`4D,cbS
� 1
-Bei61,
q8 a�
DDT Forth 422-031 U
Revised 03J20 t8
City of Marysville 21lPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
•
Ash. Underutilized Disadvantaged Business •
=mooWashington State
or Transportation Enterprise(UDBE) Written
Confirmation Document
See Contract Pnwisions• UDBE Document Submittal Reguirtnetus
Disadvantaged Business Enterprise Participation
THIS FORM SHALL ONLY BE SUBMITTED TO A UDBE THAT IS LISTED ON THE CONTRACTOR'S
UNDERUTILIZED DISADVANTAGED BUSINESS ENTERPRISE UTILIZATION CERTIFICATION.
THE CONTRACTOR SHALL COMPLETE PART A PRIOR TO SENDING TO THE UDBE.
JIART A:To he completed by the bidder
The entries below shall be consistent with what is shown on the Bidder's Underutilized Disadvantaged Business
Enterprise Utilization Certification.Failure to do so will result in Bid rejection.
Contract Title: ZO lr') Ca `9 IA11 Itib w a {toNn r LMUak%
Bidder's Business Name:C'.l YauEc,�pr� vJ{ Zv� t py uwk.f
UDBE's Business Name:_O'etiA,Lo_ Lr}@ jy%.6�L.
Description of UDBE's Work:by rV69
Dollar Amount'to be Applied Towards UDBE Goal: !4I1:21S.*
Dollar Amount to be Subcontracted to UDBE*: A Lto • '
'Optional Ftetd
PART K:To he completed In the Underutilized Disadvantaged Busbies%Enterprise
As an authorized representative of the Underutilized Disadvantaged Business Enterprise.I confirm that we
have been contacted by the Bidder with regard to the referenced project for the purpose of performing the Work •
described above.If the Bidder is awarded the Contract,we will enter into an agreement with the Bidder to
participate in the project consistent with the information provided in Part A of this form.
Name(printed): jai7D tA)it_Llt9vyiS •
Signature:
Tide: �1 ILCLt�✓�L •
Address: to tiZ 141177 tM y S STt'EL_j Date: Z/z./2 i
KEN'T (t03Z
DOT Form 422-031U
Ravtsed 03/2018
•
City of Marysville 21 { Page
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
•
VW" Washington state Disadvantaged Business Enterprise
Department of Transportation (DBE) Bid Item Breakdown Form
1.Contract Number 2.Contract Name
' 2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS
3.Prime Contractor 4.Prime Contractor Representative Name
Granite' Construction Company Beth Duffus
5.Prime Contractor Representative Phone Number 6.Prime Contractor Representative Email
425=551-3100 _ -bid.everett@gcinc.coin
Column 7 Worm8
Column I Column 2 Column 3 Column 4 C-hcrri 5 Column a Dollar Amount
Name of UDBE Bid Item N FultiPartlal Quantity Description Unit Price Total Unit to be Applied
Son lrsuuomns ru l (S 6nttuaorc) ISeu lnwuctuc) (Soo rmvmnns) (Soo inr..e0:nll ISun inunmo ) Cost Towards Goal
(see rs(nsoms)
(Sm tw(sc an.)
�nginttn Inc A co Z �II I '170a4wa>•{SO(el 4'Y275.'° 01121S." 8Li/215.°%
. 1 .
• Subtotal: iffy;2:61' A4,i7.1S;13
Total Unit Dollar Amount
Name of UDBE Did Item N, Full/Partial Quantity Description Unit Price Cost to be Applied
Towards Goal
C.osio>"Can urr . 21 �o r�l 1 rj ct Came- sa
$14 S. 5 115,, 5 s,
Cant .%tiny.ln[ TeaEhz. Conat a+kte $ / ° 1 11
lie .In1 22, A)0.. 11 O xb 34/5.' 115iyoo.rG *5/N�.°
WStnvr CaA &moo.fiat.cu IrO.r.,p• y 3
. ye S
cdwtv,wtt Int, ' ZS Va/kW 3 .7,,,,,.. vOiegfcl It r150. 3I1S '°'
Cub t i (o G (+bQwQ ,s w
«)
— „ _ 2lp4atJ 5 T'Ytc D' Pe.n�rvtre SSo. �Z 550.`° 4Z,Sso.
Subtotal:' i4,33i5f° t►llas 815.
Dollar Amount
Name of UDBE Bid Item M FuIlrPartlal Quantity Description .Unit Price TO�ost°1t to be Appilad
Towards Goat
CdticOo. Co+adt.. Ctw)cwr CCAL• $ eG ,R rP
CsKtvita trtc 21 PO1/)tcu- 30 emic4wrS1L 125.- 133,150.e 311St -
Dek.c iikk. .,� 9 u' 3 taoti,�
GCly b-n3lru.. ZO alitO I (-2 0 �lovni,/ SO AU-. I7O.V I 3.1p(i7. ,
rr 0
•
Subtotal: t j1i350D," s 113Z5.c°
Total•
Unit Dollar Amount
Name of UDBE Bid Item N Full1Partiol Quantity Description Unit PriceCost to be Applied
Towards Goal
Subtotal: S 0.00 -I $0.00
' TOTAL UDBE Dollar Amount:ft2$,Stlb`i fA s28(Saa`ft
•
DOT Fern,272.054
Revised 09/2020
City of Marysville 22IPage
2019 CITYWIDE HIGHWAY SAFETY IMPROVEMENTS PROJECT
Form Rev.12/2019
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal