Loading...
HomeMy WebLinkAboutSRV Construction - 2022 Pavement Preservation Project -4, law s� " 11 5�� LF L,0 C.o i'cf r\D4 aov.a PART 2 - BID PROPOSAL DOCUMENTS The documents contained within this section constitute the formal proposal from the bidder to the City for this project. Failure of the bidder to submit all pages contained in PART 2 with its bid and to accurately complete all applicable forms may be grounds for the Owner to consider the bid non-responsive. City of Marysville 11IPage • 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal • STATEMENT OF BIDDER'S QUALIFICATIONS • Name of Contractor: SRV Construction Inc. . Address: P.O. Box 507,Anacortes,WA 98221 Contact Person: Krysta Verbarendse Phone: . 360-675-7100 • Contractor has engaged in the construction business under the present firm name indicated for the past 31 years. Gross dollar amount of work currently under contract $ 7,30.0,602.50 • Approximate•percentage of current contracts outstanding 40% - Type'of work generally performed by ContractorHeavy Civil Construction/Underground Utilities • List five major projects of a similar nature completed within the last ten years and the.gross dollar.amount of each project. 3rd Street low Impact .$1,820;354..00 • Grove Street Improvements $676,178:0.0 Marshall Elementary Safe Route to School . $510,034.00 51st Ave NE Connector Project $ 1,402,637.00 1st.Street Low Impact . . $960,90.1.00 List of five major pieces of equipment that are anticipated to be used on the project by the Contractor and ownership of the item. a- -6 -a a� (1) a) OJ Description of Equipment ® ❑ ❑ Excavator ® '❑ ❑ Loader • ® ❑ 0 Backhoe ❑ ❑ Roller ® ❑ ❑ Sweeper City of Marysville 12IPage 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Seal STATEMENT OF BIDDER'S QUALIFICATIONS(continued) • Bank References:Heritage Bank- Tim Northrop: 360-527-4974 How many general superintendents or other responsible employees in a supervisory position do you have at this time and how long have they been with the Contractor? 5 Superintendents 8-20 years Have you changed bonding companies within the last three years? ❑ Yes El No . If so,why? Have you .ever sued or been sued by any special district, municipality, county, or state government, concerning a public.works contract? ® Yes ❑ No If so, explain. SRV filed suit against.Skagit County for deficient design If so, name the agencies and reasons therefore. SRV file suit aginst Skagit County for deficient design Disposition of case, if settled: Settled in Mediation Washington State UBI No: 601348242 Washington State Contractor's Registration No.: SRVCOI*990QA Washington State Worker's Comp Account No.: 810,875-00 IRS Employer Number: 91-1535287 Or, if individual, Social Security Number: N/A City of Marysville 13 ' Page 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal LIST OF SUBCONTRACTORS. (Contracts Estimated to Cost Over$1,000,000.00). Failure to,list subcontractors with whom the bidder, if awarded the contract, will directly subcontract for performance of the work of heating, ventilation and air conditioning, plumbing; as described in Chapter 18.106 RCW, and electrical, as described in Chapter 19.28 RCW or naming more than one subcontractor to perform the same work will result in your bid being non-responsive and therefore void. Subcontractors)with whom the bidder will directly subcontract'that are proposed to perform the work of heating, ventilation and air conditioning, plumbing', as described in Chapter 18:106 RCW, and electrical as described in Chapter 19.28 ROW must be listed below.The work to be performed is to be listed below the subcontractor(s) name. To the extent the Project includes one or more categories of work referenced in RCW 39.30.060; and no subcontractor is listed below to perform such work,the bidder certifies that thework will either(i)be performed by the bidder itself, or(ii) be performed by a lower . tier subcontractor who will not contract directly with the bidder. Subcontractor Name. None Proposed Work to be Performed HVAC • Subcontractor Name None Proposed Work to be Performed Plumbing Subcontractor Name .None Proposed Work to be Performed Electrical Subcontractor Name None Proposed Work to be Performed Structural-Steel Subcontractor Name None Proposed Work to be Performed Rebar City of Marysville 14I Page 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal LIST OF SUBCONTRACTORS (All Contracts) The.City requests,for informational purposes and as a courtesy,that bidders list other Subcontractors, whose dollar value of work exceeds either(a) 10% of the total project cost or (b) $10,000. NOTE: Failure to submit the information requested on this sheet will not result in the City finding the bid non-responsive. Subcontractor Name Type of Work .Approx. Value (1) (2) (3) (4) (b) (6) (7) (8) City of Marysville 15IPage 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Seal BID PROPOSAL.FORM TO: CITY OF MARYSVILLE 1049 STATE AVENUE MARYSVILLE,WA 98270 The undersigned bidder declares that the bidder has carefully examined the Project Manual including the Plans and Specifications,. Call for Bids, Information for Bidders, Standard Specifications, General and/or Special Provisions, Proposal Documents, Contract Documents, and any other documents relating to the 2022 Pavement Preservation Project, has made such investigations,as are necessary to.determine the premises and conditions'to be encountered in the work,:will enter into a contract with the City in the form of the Contract enclosed, and will, to the extent required,`furnish all labor and materials and perform all work as required for construction of the improvements in strict accordance with the Contract Documents for the unit prices shown on the Bid Schedule. The bidder further declares that this Proposal is in all respects fair and is made without collusion on the part of any person, firm, or corporation mentioned below,and that:no officer or.employee of the City.of Marysville is personally or financially interested, directly or indirectly; in the Proposal or in any purchase of or sale of any materials or supplies for the work to which it relates, or any portion of the profits-thereof. The bidder agrees that it will hold its bid proposal open for forty-five (45y days after the actual date Of bid opening and if its proposal is accepted, will timely execute a contract in the form of the Contract: included herein, will execute and provide all bonds, certifications, and documents required:herein, and will timely commence work following execution of the contract. Thereafter, the bidder declares that it will timely complete the work in accordance with the Contract Documents and in the event that the bidder fails to complete the work within the time specified in the Contract Documents, will pay liquidated damages to th.e City of Marysville per the specifications and requirements of the Contract Documents. The bidder further agrees that the:bid bond or deposit accompanying this bid shall be left in escrow with the City; and .that the liquidated damages which the City will sustain by the failure of the undersigned bidder to execute and deliver the contract and performance bond will be equal to five percent(5%) of the total bid. If the undersigned bidder defaults in executing that contract and in furnishing.the contract performance bond within twenty (20) days of the date on the Notice of Award, then the bid guaranty shall become the property of the,City. If, however, the City does not accept this bid or any:part thereof within forty-five (45) days of the time set for the opening of bids, or if the undersigned bidder executes and delivers said contract and surety bond,the bid guaranty shall be returned to the bidder. By signing and submitting this Bid Proposal, the bidder swears, under penalty of perjury under the laws of the State of Washington and the laws of the United States, and affirms that the following items are true and correct. Non-Collusion Affidavit That said person(s), firm, association, or corporation has (have) not, either directly or indirectly, entered into any agreement, participated in any collusion,, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this proposal is submitted. City of Marysville 16IPage 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal Furthermore, that the bid submitted herewith is a genuine bid and not a collusive or sham bid or made in the interest or on behalf of any person herein named and that the person, firm, association,joint venture, co-partnership, or corporation herein named, has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in the preparation and submission of a bid for consideration in the award of a contract for the improvement described in these documents. The bidder further acknowledges that by signing this proposal, the bidder has agreed to the provisions of this Non-Collusion Affidavit. Anti-Discrimination Certification The bidder hereby covenants, stipulates and agrees that no person shall be discriminated against in the bidding of the service and/or materials_hereunder and that the bidder shall not refuse to hire any person therefore because of such person's race, creed,color or national Origin, unless based on a bona fide occupational qualification. Also, the bidder will in no matter discriminate against any person because;of such person's race, creed,coloror national origin. Any such discrimination shall be deemed a violation of this bid and shall render this bid subject to forfeiture. NOTICE TO ALL BIDDERS To report rigging activities, call: 1-800-424-9071 The U.S. Department of Transportation (USDOT) operates the above toll-free "hotline" Monday through Friday, 8:00 a.m.to 5:00 p.m., ET.Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the "hotline"to report such activities. The "hotline" is part of the USDOT's continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the USDOT Inspector General. All information will be treated confidentially and caller anonymity will be respected. City of Marysville 17IPage 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal BID SCHEDULE 2022 Pavement Preservation Project Note: Unit prices for all Bid Items must be shown. All entries must be typed or in ink ITEM PLAN ITEM DESCRIPTION UNIT PRICE TOTAL AMOUNT NO. . QUANTITY (Figures) (Figures) 1 1.0 Minor Changes - $20,000.00 $20,000.00 FA 1-04.4 2 1.0 Roadway Surveying LS 1-05.5 ICI IUOD.(m . Iy1000.o-p 3 1.0 Record Drawings (Min. Bid$1500) LS .1-05.18 I .UU.oO I/S00,00 4 1.0 SPCC Plan LS 1-07..15 8-00.00 500.00 1.0 Mobilization I ig oo.00 SV 071-12$,D0D•UD 1161Wz 5 LS 2-09.7 - ,�6 1 1 l 1100rp 00 W 6 1.0 Project Temporary Traffic Control • LS 1-10.5 I CIO/Uov.W /440/WO.00 7 1.0 Clearing and Grubbing LS 2-01.5 ��$•UO•VD N�$Ln7•vU 8 375 . Sawcut LF 2-02.5 9.SU 3/5-62L.SO 9 1.0 Removal of Structures and Obstructions LS 2-02.5 5/000•W 3/CVO.OZ) 10 245 Removal of Curb and Gutter. LF 2-02.5 *(2•au (0,370.0u 11 140 Removal of Sidewalk SY 2-02.5 qs .cDU COO 0. OD 12 125 Removal of Asphalt SY 2-02.5 011 .o1, al (o A.T.Ob 13 205 Unsuitable Foundation Exc., Incl. Haul SY 2-03.5 100.017 12/3 OD•Co 14 600. Roadway Exc., Incl. Haul CY 2-03.5 3S. 00 a.11OlY .00 15 110 Crushed Surfacing Top Course _ TON 4-04.5 31. 00 311110. ou 16 3000 Crushed Surfacing Base Course TON 4-04.5 LID 121 1 Too.06 17 3585 Pavement Repair Exc., Incl. Haul SY 5-04.5 $:(6d 31 ,SS .o 18 4611 Pavement Repair, Incl. Haul, Full Depth SY 5-04.5 11.00 6O17c2 1.co 19 28500 Planing Bituminous Pavement SY 5-04.5 3.60 1 Off/(a00.o0 20 7650 HMA CI. '/2 IN PG 58H-22 TON 5-04.5 11-1a.50 1101011a5.OD 21 2 Adjust Catch Basin EA 7-05.5 I/I00.O o a)goo-00 22 11 Adjust Manhole EA . 7-05.5 1300•60 I'-I,3Ob.o0, City of Marysville 18IPage 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Seal 23 13 Adjust Water Valve • EA 7-05.5 SiSS.0-0 I1flDS.ob 24 3 Adjust JBox EA. 7-05.5 1/L10p.0o 141a0O,au 25 50 Hydroseed SY 7-05.5 CIO.oa 3/boo.oo 26 5 Topsoil Type A CY 8-02.5 /145.0D 1 o25.0-1) 27 1 Property Restoration LS 8-02.5 Iol�OUvo . IO SOD.00 ' 28 245 Cement Conc. Traffic Curb and Gutter LF 8-04.5 ( 0.0o 14, b0.OD 29 90 Cement Conc. Pedestrian Curb LF 8-04.5 65.cso . S; eg GO.Oc 30 no Raised Pavement Marker, Type 2 H U N . 8-09.5 Sp1).C?U S,500.OD 31 2 Adjust Monument Case and Cover EA 8-13.5 5itg.00 . 1 7 7 0-00 32 140 Cement Conc. Sidewalk SY 8-14.5 • 101.00 14/9%0.00 33 3 Cement Conc. Curb Ramp -Combination EA 8-14.5 3/6oaS40 IO,875.O 3 Cement Conc. Curb.Ramp- 34 EA Perpendicular 8-14.5 -Si(4*.c.OD l0, $•) -OO 35 1 Cement Conc. Curb Ramp-Parallel EA 8-14.5 3,(Oo :0D '-1 (v 5.OZN 2 Cement Conc. Curb Ramp-Single 36 EA Direction 8-14.5 31 625 vU 7, 2-SO•au 37 90 Detectable Warning Surface SF 8-14.5 S3.00• LI -7 70.0o 38 36750 Painted Line . LF 8-22.5 . .[.I (7 ILI,loci.00 39 85 Painted Wide.Line LF 8-22.5 S 00 LI .c.DO. 40 75 Plastic Stop Line LF 8-22.5 No•00 02�70 0.0 41 2 Plastic Traffic Arrow EA 8-22.5 300.CYO . . LOD. OD 42 2 Railroad Crossing Symbol EA 8-22.5 I /915..0D a)9S0 MO 43 4 Project Sign 2 EA 8-32.5 S 1�. 00 5 C00.60 TOTAL BID: I ICIg I , Ob` 'S City of Marysville 19IPage 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Seal BID SCHEDULE-Shoutles AVE-BID ADDITIVE "A" 2022 PPP Note: Unit prices for all Bid Items must be shown. All entries must be typed or in ink • ITEM PLAN ITEM DESCRIPTION UNIT PRICE TOTAL AMOUNT NO. QUANTI (Figures) (Figures) TY 1A 1.0 Minor Changes $10,000.00 $10,000.00 FA 1-04.4. 2A 1.0 Roadway Surveying LS - 1-05.5 3,Doo.O,) 31 pib.oa 3A 1.0 Mobilization LS 2-09.7 1-1 li do .cam Li 1 i 0 GO 4)0 4A 1.0 Project Temporary Traffic Control LS 1-10.5 $It000.00 81/006.00 5A 90 Sawcut LF 2-02.5 O.(TO (,OBQ.00 6A 1.0 Removal of Structures and Obstructions LS 2-02.5 a/000.ob a,OUv.00 7A 225 Removal of Curb and Gutter LF 2-02.5 _20.oo 41S00-00 8A 145 Removal of Sidewalk SY 2-02.5 LIg.o0 (2 Srs•OD 9A 75 Removal of Asphalt SY 2-02.5 AS.00 .• 11$75.00 1OA 5 Unsuitable Foundation Exc., Incl. Haul SY 2-03.5 (:-A.U10 315.00 11A 50 Roadway Exc., Incl. Haul CY 2-03.5 1 ( O.OD 310 v-o.O b 12A 150 Crushed Surfacing Top Course TON 4-04.5 30.0D Li 150V.O p 13A 185 Crushed Surfacing Base Course TON 4-04.5 3S.00 (214115.00 14A 11500 Planing Bituminous Pavement SY 5-04.5 "S.SA 4)I1 U 0.cso 15A 1650 HMA CI. '/2 IN PG 58H-22 TON 5-04.5 13$•00 Z=71700.00 16A 2 Adjust Water Valve EA 7-05.5 900.00 11 g JU•0 0 17A 4 Adjust Catch Basin EA 7-05.5 l J Ol S.00 y�Q(oo.00 18A 1 Property Restoration LS 8-02.5 L OO.0� qJ%op .4 o 19A 225 Cement Conc. Traffic Curb and Gutter LF 8-04.5 W.'00 131 SA).00 20A 2.8 Raised Pavement.Marker, Type 2 HUN 8-09.5 S'S .o0 II SMD,00 • 21A 11. Adjust Monument Case and Cover EA 8-1.3.5 - 4►00. 00 91900.00 City of Marysville 20JPage 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal BID SCHEDULE-Shoutles AVE-BID ADDITIVE "A" 2022 PPP Note: Unit prices for all Bid Items must be shown. All entries must be typed or in ink 8 Cement Conc.Curb Ramp- 22A -EA Perpendicular 8-14.5 I/I00.0o. 3a,Soo,n0 23A 145 Cement Conc.Sidewalk SY 8-14.5 101.00 I5"/s15.00 24A 80 Detectable Warning Surface SF 8-14.5 63.00 L4/024I7.OU 25A 6350 Painted Line LF 8-22.5 • SD IJ 115.00 26A 3050 Painted Wide Line LF 8-22.5 5.DO IS Aso.00 27A 512 Plastic Crosswalk SF 8-22.5.. 1.5 0 q .00 28A 2 Project Sign EA 8-32.5 815.0o I I/56.00 TOTAL BID ADDITIVE A: 5 LI-1 $(D-1 ,Oi City of Marysville 211Page 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal BID SCHEDULE-Culvert Replacement- BID ADDITIVE"B" 2022 PPP Note: Unit prices for all Bid Items must be shown. All entries must be typed or in ink ITEM PLAN ITEM DESCRIPTION UNIT PRICE TOTAL AMOUNT NO. QUANTITY (Figures) . (Figures) 1 B 1.0 Minor Changes $1,500.00 $1,500.00 FA 1-04.4 . - 2B 1:0 Roadway Surveying LS 1-05.5 .)/ 800 .00 1J 300.00 3B 1.0 Mobilization- LS 2-09.7 5tgO1,.o1) Si,203.00 1.0 Project Temporary Traffic Control 4B LS 1-10.5 90 Sawcut ,Joat•O1 (0/000.0n 5B LF 2-02.5 )2.OD 11O$0-015 6B 25. . Removal of Asphalt SY 2-02.5 j( ,61) '550.00 7B 15 HMA Cl. 1/2IN PG 58H-22 TON: 5-04.5 300.0.0 9150p•(7o 45 Schedule A Storm Sewer Pipe, 36" 8B LF (Incl. Bedding) 7-04.5 600.00 a1,DO 0. Oo 9B 40 Bank Run Gravel for Trench Backfill. TON 7-05.5 41,00 . \ , logo.00 10 Removal of Unsuitable Material 10B CY (Trench) 7-08.5 . 100.00 . t, 000-O0 11 B 1 Trench Excavation Safety Systems LS 7-08.5 tS�OOU.00 '4000.00 12B 1 Dewatering LS 7-08.5 b0!0op.OD . Lo/OaU-Ob 13B 100 Quarry Spalls TON 8-15.5. (00-Old � OOu•OD • TOTAL BID ADDITIVE `B": 119 i b�b•d� GRAND TOTAL BID*: (BASE BID + BID ADDITIVES A&B) *The City reserves the right to award the lowest responsive, responsible bidder based on the Total Base Bid or the Total Bid (Total Base Bid + Total Bid Additives). City of Marysville 22IPage 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Seal City of Marysville 23IPage 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal IN WITNESS hereto, the undersigned bidder: a) Agrees to the conditions of this bid; b) Certifies that this bid has not been restricted, modified or conditioned; c) Acknowledges receipt of addenda 1 to 3 d) Attests to the absence:of collusion in the Non-Collusion Affidavit above and agrees to be bound by its provisions; e) Covenants,,stipulates and agrees in accordance with the Anti-Discrimination Certification above; f) Declares, accepts and understands the requirements of the Contract Documents; g) Has reviewed the insurance provisions of the Contract Documents and certifies that coverage will be: provided as required,; h) Understands and agrees as to the completion time and liquidated damages as above,and i) With the full authority of the firm submitting this bid has signed below this 6th day. of . July Signature of bidder Steve Verbarendse Printed Name President pN ...CTj, Title • ��;•CORPORATE•:° SRV Construction Inc. Company Name SEAL Address at which to direct correspondence: • 1991 • � P.O.Box 507 ...... 1SHING..0 City Anacortes State:WA Zip: 98221 Phone: 360-675-7106 Fax: 360-679-3885 _ Email: krysta@srvconstruction.com License No.: SRVCOI*990QA Sworn before me this 6th day of July , 20 22 /ck___ �s• • o RD % I Les Lauren (Print Name) sio :cc, 25-20 4".• �S 473 QS' . Notary Public in and for the State of Washington NOTAR.- • residing at: Skagit County My appointment expires: . . 3/25/2025 /'UBLIc �:Nonni it•%111\00 %yj .N'mbe�2.�•.��\,. City of Marysville 241Page 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal PROOF OF AUTHORITY TO SIGN BID The party by whom this.bid.is submitted and by whom the contract will be entered into, in case the award is made to said party, is Firm Name: SRV Construction Inc. E Corporation 0 Partnership 0 Individual Doing business at P.O. Box 507 Anacortes/Washington Address City/State Which is:the'address to which all communications concerned with this bid and contract should be sent. The name of the president, treasurer, and manager of the bidding corporation, or the names of all persons and parties interested in this bid as partners or principals are as follows: Name/Title Address. Steve Verbarendse/President P.O. Box 507,Anacortes, WA 98221 Krysta Verbarendse/Corporate Secretary P.O. Box 507, Anacortes;WA 98221 If So rietor or Partnership IN WITNESS hereto, the signed has set his (its) hand this day of , 20= Signature of bidder Title City of Marysville 25 ' Page 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal If Corporation IN WITNESS WHEREOF,the undersigned corporation has caused this instrument to be executed and its seal affixed by its duly authorized officers this 6th day of July ,2022. SRV Construction Inc. Name of Corporation 65,55C_ By Steve Verbarend Secre ry Title President NOTE: 1. If the bidder is a co-partnership, so state, giving the name under which business is transacted. 2. If the bidder is a corporation, only a duly authorized official may execute this Bid Proposal. This proof of authority must be notarized. Sworn before me this .6th day of July , 2022 . \``.. ,�►iiiiirii���i/ Jame ron. (Print Name) DES.Jq UR�,�� NotaryPublic in and for the State of Washington , ..:. 0(05-20,44. '1i:� . . residing at: Skagit County C) s N.... My appointment expires: 3/2.5/2025 NOTARY :r- ®•••ea • = "--6 OUBLIC MN Sy� � Q ` • ,� 'Z• `iF •.Utuber .•' G• ,"* WASrs \' • n City of Marysville 26IPage 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Seal • BID DEPOSIT A Bid Deposit shall be made payable to the City of Marysville in the amount of five percent(5%) of the Total Bid Amount(s)for all schedules, based upon the Lump Sum or Bid Schedule quantities at the unit prices, including applicable taxes, and in the form indicated below and on the following page. ❑ Cashier's Check ❑ Certified Check ® Bid Bond Amount: $ 5%0 Note: If.a Bid Bond is provided, it must be-accompanied by a power of attorney which appoints the Surety's true and lawful attorney-in-fact to make, execute, seal, and delivery the Bid Bond. . Proposed Contract Performance Bond Surety If the bidder is awarded'a construction contract on this bid, the Surety who will provide the Contract Performance Bond will be Travelers Casualty.& Surety Co. do Parker Smith&Peek Whose address is:. 2233 112th Ave NE Street Bellevue WA .98004 City State Zip Code Phone: 425-709-3769 City of Marysville 27IPage 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal DEPOSIT OR BID BOND FORM DEPOSIT STATEMENT Herewith find deposit in the form of certified check or cashier's check in the amount of $ ,which amount is not less than five percent of the total bid. SIGN HERE BID BOND KNOW ALL MEN BY THESE PRESENTS: That we, SRV Construction,Inc. , as Principal, and Travelers Casualty and Surety Company of America , as Surety, are held firmly bound unto the CITY OF MARYSVILLE, Washington, as Obligee, in the penal sum of Five Percent(5%)of the Total Amount Bid Dollars, far the payment of which the Principal and the Surety bind themselves, their heirs, executors, administrators, successors, and assigns,jointly and severally by these presents. The condition of this obligation is such that, if the Obligee shall make any award to the Principal for the"2022 Pavement Preservation Project Project," according to the terms of the bid made by the Principal therefore, the Principal shall duly make and enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award and shall give bond for the faithful performance thereof, with Surety or Sureties approved by the Obligee, or if the Principal shall, in case of failure to so do, pay and forfeit to the Obligee the penal amount of the deposit specified in the call for bids,then this obligation shall be null and void;otherwise,it shall be and remain in full force and effect,and the Surety shall forthwith pay and forfeit to the Obligee, as penalty and liquidated damages,the amount of this bond. SIGNED, SEALED,AND DATED THIS 29th DAY OF . June ,2022 RV Construction,Inc. GONSTRUCTjO / ncipal J •.° .'y I • • �•,C, By: .4 A. I 1 ()'• CORPORATE .• - - — Its: bare 4 se Co .orate ecret. SEALTravelers Casualty an"'.. •• Company of America • • Surety 1991. By: gSHINGW It : altenba o -in=Fact - Received return of deposit in the sum of$ City of Marysville 28 ' Page 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal , Travelers Casualty and Surety Company.of America Travelers Casualty and Surety Company : TRAVELERS J . St. Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St Paul Fire and Marine Insurance Company are corporations duly organized under the laws: of the State of Connecticut (herein. collectively called the"Companies"),and that the Companies do hereby make,constitute and appoint Roger Kaltenbach of BELLEVUE . • ', .Washington , their true and lawful Attorney(s)-in-Fact. to sign, execute, seal and acknowledge 'any '.and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf .of the Companies in their'.business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed bylaw. IN WITNESS'WHEREOF,the Companies have caused this instrument to be signed,and their corporate seals to be hereto affixed,this 21st day of April, ^-'4)7Asua"!- Jeri Ay - r a .. : . . . _ cam. � ¢ CONS :QI .. State of Connecticut - / By: City of Hartford ss. ;Robert L.Rene enior Vice President On this the 21st day of April, 2021,. before me personally appeared .Robert L. Raney,-Who acknowledged 'himself to be 'the Senior Vice President of each of:the Companies, and that :he, as such, being authorized so to: do; executed the: foregoing instrument for the purposes'therein contained by signing on behalf Of said Companies by himself as a duly authorized officer. : IN WITNESS WHEREOF,I hereunto set my hand and official seal. is" a } ...OTAAY° >s i ' � My Commission expires the 30th day of June,2026. } 0 1 i�GG ✓ . . f `.'''Anna P.Nowik;Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of the Companies,which resolutions are now in full force and effect,reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President,the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys=in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority : may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances; contracts of indemnity, and.other writings obligatory in the nature of a'bond, recognizance, or conditional undertaking; and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her;and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a.bond,. recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed•by the President, any Vice:Chairman, any Executive : Vice President any Senior Vice President or any Vice President, any Second Vice President; the: Treasurer, any Assistant Treasurer, the Corporate Secretary 'or any Assistant Secretary arid duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by :one or more Attorneys-in-Fact and Agents pursuant te the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority;'and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any.Executive Vice President,.any Senior.Vice President, any Vice President,any Assistant Vice President,any Secretary,any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any:certificate relating thereto appointing Resident Vice.Presidents, Resident Assistant Secretaries or Attorneys-in- Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof,and any such Power of Attorney Or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such.power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a true and correct copy.of the Power of Attorney executed by said Companies,which remains in full force and effect. Dated this '29th day of- •. June , 2022 . 40,swm- 4,,�cr Ayo@ �1 e W • co.NN.• a r - ` Kevin E.Hughes,Assiretary To verify the authenticity of this Power of Attorney,please call us at 1-800-421-3880. P/ease refer to the above-named Attorneys)-in-Fact and the details of the bond to which this Power of Attorney is attached, EST. in 1991 w MARYSVILLE WASHINGTON CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date 6/15/2022 ,the bidder is not a "willful" violator, as defined in RCW 49.48.082, of any provision of chapters 49.46,49.48,or 49.52 RCW, as determined by a final and binding:citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment" entered by 'a court of limited or general jurisdiction. I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct. SRV Construction Inc: Bidder's Business Name Signature.of Authorized Steve Verbarendse Printed Name President Title 7/6/2022 Anacortes Washington Date City State Check One: Sole Proprietorship ❑ Partnership ❑ Joint Venture ❑ Corporation KI State of Incorporation, or if not a corporation, State where business entity was formed: Washington If a co-partnership, give firm name under which business is transacted: *If a corporation,proposal must be executed in the corporate name by the president or vice- president(or any other corporate officer accompanied by evidence of authority to sign). If a co- partnership,proposal must be executed by a partner. City of Marysville 29JPage 2022 PAVEMENT PRESERVATION PROJECT Form Rev.4/2021 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal