Loading...
HomeMy WebLinkAboutBid Tabulation - NE Widening Smokey Point Boulevard to Hayho CreekCERTIFIED BID TABULATIONCity of Marysville 156th Street NE Widening - Smokey Point Blvd to Hayho Creek TIB Project Number: 8-1-143(012)-1 Bid Opening Date: No.Item Description Qty Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 1 Minor Changes 40,000 EST 1.00$ 40,000.00$ 1.00$ 40,000.00$ 1.00$ 40,000.00$ 1.00$ 40,000.00$ 1.00$ 40,000.00$ 1.00$ 40,000.00$ 1.00$ 40,000.00$ 2 Surveying 1 LS 25,000.00$ 25,000.00$ 20,000.00$ 20,000.00$ 19,429.00$ 19,429.00$ 25,600.00$ 25,600.00$ 18,650.00$ 18,650.00$ 25,000.00$ 25,000.00$ 18,000.00$ 18,000.00$ 3 ADA Features Surveing 1 LS 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 4,697.00$ 4,697.00$ 3,370.00$ 3,370.00$ 4,900.00$ 4,900.00$ 5,000.00$ 5,000.00$ 4,000.00$ 4,000.00$ 4 Record Drawings (Minimum Bid $2,500)1 LS 2,500.00$ 2,500.00$ 2,500.00$ 2,500.00$ 2,992.00$ 2,992.00$ 2,500.00$ 2,500.00$ 2,500.00$ 2,500.00$ 2,500.00$ 2,500.00$ 2,500.00$ 2,500.00$ 5 Spill Prevention, Control & Countermeasures (SPCC) Plan 1 LS 1,000.00$ 1,000.00$ 500.00$ 500.00$ 1,593.00$ 1,593.00$ 1,000.00$ 1,000.00$ 300.00$ 300.00$ 1,000.00$ 1,000.00$ 2,500.00$ 2,500.00$ 6 Utility Potholes 5 EA 1,000.00$ 5,000.00$ 2,400.00$ 12,000.00$ 872.00$ 4,360.00$ 1,000.00$ 5,000.00$ 625.00$ 3,125.00$ 600.00$ 3,000.00$ 800.00$ 4,000.00$ 7 Type B Progress Schedule 1 LS 5,000.00$ 5,000.00$ 500.00$ 500.00$ 6,370.00$ 6,370.00$ 800.00$ 800.00$ 1,750.00$ 1,750.00$ 2,000.00$ 2,000.00$ 1,500.00$ 1,500.00$ 8 Mobilization 1 LS 243,000.00$ 243,000.00$ 200,000.00$ 200,000.00$ 195,035.00$ 195,035.00$ 183,000.00$ 183,000.00$ 194,000.00$ 194,000.00$ 200,000.00$ 200,000.00$ 200,000.00$ 200,000.00$ 9 Project Temporary Traffic Control 1 LS 50,000.00$ 50,000.00$ 110,000.00$ 110,000.00$ 213,400.00$ 213,400.00$ 110,000.00$ 110,000.00$ 78,000.00$ 78,000.00$ 50,000.00$ 50,000.00$ 75,000.00$ 75,000.00$ 10 Portable Changeable Message Sign 1,400 HR 15.00$ 21,000.00$ 7.00$ 9,800.00$ 13.00$ 18,200.00$ 5.00$ 7,000.00$ 2.00$ 2,800.00$ 25.00$ 35,000.00$ 3.50$ 4,900.00$ 11 Uniformed Police Officer 40 HR 150.00$ 6,000.00$ 165.00$ 6,600.00$ 180.00$ 7,200.00$ 138.00$ 5,520.00$ 175.00$ 7,000.00$ 150.00$ 6,000.00$ 270.00$ 10,800.00$ 12 Clearing and Grubbing 1 LS 28,000.00$ 28,000.00$ 60,000.00$ 60,000.00$ 12,313.00$ 12,313.00$ 68,000.00$ 68,000.00$ 24,500.00$ 24,500.00$ 20,000.00$ 20,000.00$ 75,000.00$ 75,000.00$ 13 Removal of Structure and Obstruction 1 LS 62,000.00$ 62,000.00$ 60,000.00$ 60,000.00$ 56,087.00$ 56,087.00$ 58,000.00$ 58,000.00$ 56,500.00$ 56,500.00$ 50,000.00$ 50,000.00$ 45,000.00$ 45,000.00$ 14 Roadway Excavation Incl. Haul 1 LS 44,000.00$ 44,000.00$ 40,000.00$ 40,000.00$ 115,975.00$ 115,975.00$ 22,500.00$ 22,500.00$ 37,000.00$ 37,000.00$ 100,000.00$ 100,000.00$ 16,000.00$ 16,000.00$ 15 Gravel Borrow Incl. Haul 790 TN 40.00$ 31,600.00$ 42.00$ 33,180.00$ 21.00$ 16,590.00$ 27.00$ 21,330.00$ 31.00$ 24,490.00$ 50.00$ 39,500.00$ 22.60$ 17,854.00$ 16 Unsuitable Foundation Excavation Incl. Haul (If Required)80 CY 100.00$ 8,000.00$ 80.00$ 6,400.00$ 51.00$ 4,080.00$ 75.00$ 6,000.00$ 55.00$ 4,400.00$ 100.00$ 8,000.00$ 50.00$ 4,000.00$ 17 Shoring or Extra Excavation Class A 1 LS 27,000.00$ 27,000.00$ 50,000.00$ 50,000.00$ 3,308.00$ 3,308.00$ 1.00$ 1.00$ 6,600.00$ 6,600.00$ 15,000.00$ 15,000.00$ 600.00$ 600.00$ 18 Shoring or Extra Excavation Class B 1 LS 9,000.00$ 9,000.00$ 70,000.00$ 70,000.00$ 6,616.00$ 6,616.00$ 1,950.00$ 1,950.00$ 1,000.00$ 1,000.00$ 15,000.00$ 15,000.00$ 600.00$ 600.00$ 19 Crushed Surfacing Base Course 960 TN 65.00$ 62,400.00$ 47.00$ 45,120.00$ 32.00$ 30,720.00$ 35.00$ 33,600.00$ 42.00$ 40,320.00$ 56.00$ 53,760.00$ 53.00$ 50,880.00$ 20 Crushed Surfacing Top Course 530 TN 65.00$ 34,450.00$ 93.00$ 49,290.00$ 32.00$ 16,960.00$ 46.00$ 24,380.00$ 34.65$ 18,364.50$ 56.00$ 29,680.00$ 42.50$ 22,525.00$ 21 Commercial HMA Cl. 1/2" PG 64-22 1,100 TN 150.00$ 165,000.00$ 190.00$ 209,000.00$ 152.00$ 167,200.00$ 146.00$ 160,600.00$ 146.00$ 160,600.00$ 160.00$ 176,000.00$ 138.00$ 151,800.00$ 22 Planing Bituminous Pavement 800 SY 15.00$ 12,000.00$ 19.00$ 15,200.00$ 7.00$ 5,600.00$ 6.50$ 5,200.00$ 8.00$ 6,400.00$ 12.00$ 9,600.00$ 13.50$ 10,800.00$ 23 Asphalt Cost Price Adjustment 5,000 CALC 1.00$ 5,000.00$ 1.00$ 5,000.00$ 1.00$ 5,000.00$ 1.00$ 5,000.00$ 1.00$ 5,000.00$ 1.00$ 5,000.00$ 1.00$ 5,000.00$ 24 Thickened Edge Sidewalk 15 SY 340.00$ 5,100.00$ 350.00$ 5,250.00$ 718.00$ 10,770.00$ 1,180.00$ 17,700.00$ 253.00$ 3,795.00$ 242.00$ 3,630.00$ 600.00$ 9,000.00$ 25 VFG Walls and Slopes 4,820 SF 65.00$ 313,300.00$ 95.00$ 457,900.00$ 77.00$ 371,140.00$ 49.00$ 236,180.00$ 72.00$ 347,040.00$ 60.00$ 289,200.00$ 65.00$ 313,300.00$ 26 Corrugated Polyethylene Storm Sewer Pipe 12-In. Diam.1,060 LF 100.00$ 106,000.00$ 83.00$ 87,980.00$ 65.00$ 68,900.00$ 68.00$ 72,080.00$ 43.60$ 46,216.00$ 80.00$ 84,800.00$ 22.00$ 23,320.00$ 27 Corrugated Polyethylene Storm Sewer Pipe 18-In. Diam.52 LF 200.00$ 10,400.00$ 123.00$ 6,396.00$ 85.00$ 4,420.00$ 130.00$ 6,760.00$ 85.00$ 4,420.00$ 95.00$ 4,940.00$ 82.00$ 4,264.00$ 28 Catch Basin Type 1 7 EA 3,000.00$ 21,000.00$ 2,400.00$ 16,800.00$ 2,175.00$ 15,225.00$ 2,600.00$ 18,200.00$ 2,200.00$ 15,400.00$ 1,800.00$ 12,600.00$ 2,500.00$ 17,500.00$ 29 Concrete Inlet 5 EA 3,500.00$ 17,500.00$ 2,000.00$ 10,000.00$ 1,959.00$ 9,795.00$ 1,600.00$ 8,000.00$ 2,171.00$ 10,855.00$ 1,500.00$ 7,500.00$ 2,300.00$ 11,500.00$ 30 Catch Basin Type 2 48-In. Diam.3 EA 6,000.00$ 18,000.00$ 7,700.00$ 23,100.00$ 5,362.00$ 16,086.00$ 5,000.00$ 15,000.00$ 4,900.00$ 14,700.00$ 6,500.00$ 19,500.00$ 4,900.00$ 14,700.00$ 31 Connection to Drainage System 4 EA 1,000.00$ 4,000.00$ 4,800.00$ 19,200.00$ 2,004.00$ 8,016.00$ 2,200.00$ 8,800.00$ 935.00$ 3,740.00$ 3,000.00$ 12,000.00$ 1,500.00$ 6,000.00$ 32 Adjust Manhole 1 EA 800.00$ 800.00$ 900.00$ 900.00$ 1,522.00$ 1,522.00$ 360.00$ 360.00$ 1,450.00$ 1,450.00$ 600.00$ 600.00$ 1,500.00$ 1,500.00$ 33 Ductile Iron Pipe for Water Main 6-In. Diam.170 LF 150.00$ 25,500.00$ 131.00$ 22,270.00$ 85.00$ 14,450.00$ 73.00$ 12,410.00$ 78.00$ 13,260.00$ 140.00$ 23,800.00$ 100.00$ 17,000.00$ 34 Moving Existing Hydrant 9 EA 10,000.00$ 90,000.00$ 14,000.00$ 126,000.00$ 7,661.00$ 68,949.00$ 5,650.00$ 50,850.00$ 5,600.00$ 50,400.00$ 5,000.00$ 45,000.00$ 5,700.00$ 51,300.00$ 35 Erosion/Water Pollution Control 20,000 FA 1.00$ 20,000.00$ $1 20,000.00$ $1 20,000.00$ $1 20,000.00$ $1 20,000.00$ $1 20,000.00$ $1 20,000.00$ 36 Stormwater Pollution Prevention Plan (SWPPP) & Implementation 1 LS 20,000.00$ 20,000.00$ 500.00$ 500.00$ 3,185.00$ 3,185.00$ 6,000.00$ 6,000.00$ 500.00$ 500.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 37 ESC Lead 125 DAY 400.00$ 50,000.00$ 160.00$ 20,000.00$ 141.00$ 17,625.00$ 35.00$ 4,375.00$ 38.00$ 4,750.00$ 150.00$ 18,750.00$ 6.00$ 750.00$ 38 Inlet Protection 39 EA 150.00$ 5,850.00$ 213.00$ 8,307.00$ 187.00$ 7,293.00$ 92.00$ 3,588.00$ 85.00$ 3,315.00$ 80.00$ 3,120.00$ 100.00$ 3,900.00$ 39 High Visibility Silt Fence 980 LF 10.00$ 9,800.00$ 9.00$ 8,820.00$ 9.00$ 8,820.00$ 7.50$ 7,350.00$ 7.00$ 6,860.00$ 7.00$ 6,860.00$ 6.00$ 5,880.00$ 40 High Visibility Fence 2,140 LF 5.00$ 10,700.00$ 6.00$ 12,840.00$ 8.00$ 17,120.00$ 5.41$ 11,577.40$ 5.00$ 10,700.00$ 5.00$ 10,700.00$ 5.00$ 10,700.00$ 41 Wattle 30 LF 10.00$ 300.00$ 7.00$ 210.00$ 11.00$ 330.00$ 9.50$ 285.00$ 14.00$ 420.00$ 25.00$ 750.00$ 16.00$ 480.00$ 42 PSIPE - Acer x freemanii 'Scarsen' / Scarlet Sentinel Red Maple 2.5" Cal. / B&B 23 EA 650.00$ 14,950.00$ 850.00$ 19,550.00$ 868.00$ 19,964.00$ 834.00$ 19,182.00$ 850.00$ 19,550.00$ 895.00$ 20,585.00$ 1,000.00$ 23,000.00$ 43 PSIPE - Amelanchier alnifolia 'Obelisk' / Standing Ovation Serviceberry, 4-6' Ht. 18 EA 400.00$ 7,200.00$ 120.00$ 2,160.00$ 132.00$ 2,376.00$ 126.50$ 2,277.00$ 95.50$ 1,719.00$ 100.50$ 1,809.00$ 270.00$ 4,860.00$ 44 PSIPE - Acrctostaphylos uva-ursi / Kinnikinnick, 1 Gal. cont. 229 EA 24.00$ 5,496.00$ 21.00$ 4,809.00$ 22.00$ 5,038.00$ 21.00$ 4,809.00$ 23.00$ 5,267.00$ 24.20$ 5,541.80$ 11.00$ 2,519.00$ 45 PSIPE - Fragaria chiloensis / Beach Strawberry, 1 Gal. cont.230 EA 24.00$ 5,520.00$ 21.00$ 4,830.00$ 22.00$ 5,060.00$ 20.00$ 4,600.00$ 23.00$ 5,290.00$ 24.20$ 5,566.00$ 11.00$ 2,530.00$ 46 PSIPE - Juniperus scopulorum 'Skyrocket' / Skyrocket Juniper, 4ft. Ht, B&B 48 EA 345.00$ 16,560.00$ 175.00$ 8,400.00$ 180.00$ 8,640.00$ 172.50$ 8,280.00$ 109.00$ 5,232.00$ 115.00$ 5,520.00$ 100.00$ 4,800.00$ 47 PSIPE - Mahonia aquifolium 'Compacta' / Compact Oregon Grape, 1 Gal.cont.36 EA 30.00$ 1,080.00$ 23.00$ 828.00$ 24.00$ 864.00$ 23.00$ 828.00$ 23.00$ 828.00$ 24.20$ 871.20$ 21.00$ 756.00$ 48 PSIPE - Nandina domestica 'Gulf Stream / Gulf Stream Heavenly Bamboo, 1 Gal. cont.103 EA 30.00$ 3,090.00$ 26.00$ 2,678.00$ 26.00$ 2,678.00$ 25.00$ 2,575.00$ 26.50$ 2,729.50$ 27.85$ 2,868.55$ 11.00$ 1,133.00$ 49 PSIPE - Pinus mugo 'Columnaris' / Columnar Mugo Pine, 4ft. Ht, B&B 45 EA 375.00$ 16,875.00$ 200.00$ 9,000.00$ 221.00$ 9,945.00$ 213.00$ 9,585.00$ 95.50$ 4,297.50$ 100.45$ 4,520.25$ 175.00$ 7,875.00$ 50 PSIPE - Viburnum davidii / David Viburnum, 1 Gal. cont.77 EA 25.00$ 1,925.00$ 23.00$ 1,771.00$ 24.00$ 1,848.00$ 23.00$ 1,771.00$ 26.50$ 2,040.50$ 27.85$ 2,144.45$ 11.00$ 847.00$ Colacurcio Brothers Engineer's Estimate Bayshore Faber Interwest SRV Konnerup page 1 of 4 Thursday Dec. 18, 2025 CERTIFIED BID TABULATIONCity of Marysville 156th Street NE Widening - Smokey Point Blvd to Hayho Creek TIB Project Number: 8-1-143(012)-1 Bid Opening Date: No.Item Description Qty Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Colacurcio Brothers Engineer's Estimate Bayshore Faber Interwest SRV Konnerup 51 PSIPE - Turf Sod / Drought Tolerant Fescue Blend.478 SY 24.00$ 11,472.00$ 11.00$ 5,258.00$ 11.00$ 5,258.00$ 11.00$ 5,258.00$ 1.75$ 836.50$ 1.85$ 884.30$ 11.00$ 5,258.00$ 52 PSIPE - Native Erosion Control Seed Mix (Hydroseed)1,544 SY 9.00$ 13,896.00$ 4.00$ 6,176.00$ 4.00$ 6,176.00$ 3.50$ 5,404.00$ 1.50$ 2,316.00$ 1.51$ 2,331.44$ 3.20$ 4,940.80$ 53 Bark Mulch 362 SY 7.00$ 2,534.00$ 5.00$ 1,810.00$ 6.00$ 2,172.00$ 6.00$ 2,172.00$ 65.00$ 23,530.00$ 67.75$ 24,525.50$ 13.00$ 4,706.00$ 54 Topsoil Type A 400 CY 60.00$ 24,000.00$ 75.00$ 30,000.00$ 76.00$ 30,400.00$ 73.00$ 29,200.00$ 62.00$ 24,800.00$ 65.50$ 26,200.00$ 80.00$ 32,000.00$ 55 Compost Blanket (3" Fine Compost)1,800 SY 12.00$ 21,600.00$ 7.00$ 12,600.00$ 7.00$ 12,600.00$ 6.50$ 11,700.00$ 5.50$ 9,900.00$ 5.75$ 10,350.00$ 6.50$ 11,700.00$ 56 Root barrier 690 LF 12.00$ 8,280.00$ 18.00$ 12,420.00$ 18.00$ 12,420.00$ 17.00$ 11,730.00$ 11.50$ 7,935.00$ 12.10$ 8,349.00$ 9.00$ 6,210.00$ 57 Irrigation System 1 LS 20,000.00$ 20,000.00$ 40,000.00$ 40,000.00$ 26,926.00$ 26,926.00$ 26,000.00$ 26,000.00$ 10,000.00$ 10,000.00$ 10,527.00$ 10,527.00$ 35,000.00$ 35,000.00$ 58 Cement Conc. Traffic Curb and Gutter 1,100 LF 55.00$ 60,500.00$ 43.00$ 47,300.00$ 48.00$ 52,800.00$ 49.00$ 53,900.00$ 39.00$ 42,900.00$ 36.30$ 39,930.00$ 41.00$ 45,100.00$ 59 Cement Conc. Pedestrian Curb 140 LF 55.00$ 7,700.00$ 48.00$ 6,720.00$ 48.00$ 6,720.00$ 51.00$ 7,140.00$ 55.00$ 7,700.00$ 48.50$ 6,790.00$ 66.00$ 9,240.00$ 60 Cement Conc. Driveway Reverse Slope 80 SY 100.00$ 8,000.00$ 125.00$ 10,000.00$ 114.00$ 9,120.00$ 110.00$ 8,800.00$ 106.00$ 8,480.00$ 87.75$ 7,020.00$ 118.00$ 9,440.00$ 61 Raised Pavement Markers Type 2 2 HUND 500.00$ 1,000.00$ 1,000.00$ 2,000.00$ 898.00$ 1,796.00$ 863.00$ 1,726.00$ 865.00$ 1,730.00$ 910.00$ 1,820.00$ 800.00$ 1,600.00$ 62 Chain Link Fence 990 LF 45.00$ 44,550.00$ 50.00$ 49,500.00$ 48.00$ 47,520.00$ 48.00$ 47,520.00$ 46.00$ 45,540.00$ 60.00$ 59,400.00$ 43.00$ 42,570.00$ 63 Reset Survey Monument 5 EA 1,000.00$ 5,000.00$ 2,000.00$ 10,000.00$ 878.00$ 4,390.00$ 1,560.00$ 7,800.00$ 955.00$ 4,775.00$ 2,000.00$ 10,000.00$ 1,100.00$ 5,500.00$ 64 Cement Concrete Curb Ramp Type Perpendicular (10' width)2 EA 10,000.00$ 20,000.00$ 4,300.00$ 8,600.00$ 4,189.00$ 8,378.00$ 6,000.00$ 12,000.00$ 3,100.00$ 6,200.00$ 2,420.00$ 4,840.00$ 3,600.00$ 7,200.00$ 65 Cement Concrete Curb Ramp Type Perpendicular (5' width)4 EA 5,000.00$ 20,000.00$ 2,700.00$ 10,800.00$ 2,693.00$ 10,772.00$ 4,600.00$ 18,400.00$ 2,900.00$ 11,600.00$ 2,238.50$ 8,954.00$ 2,450.00$ 9,800.00$ 66 Cement Conc. Curb Ramp Type Parallel 4 EA 5,000.00$ 20,000.00$ 3,300.00$ 13,200.00$ 2,513.00$ 10,052.00$ 4,000.00$ 16,000.00$ 3,100.00$ 12,400.00$ 2,420.00$ 9,680.00$ 2,500.00$ 10,000.00$ 67 Cement Concrete Curb Ramp Type Single Direction (10' width)2 EA 10,000.00$ 20,000.00$ 4,800.00$ 9,600.00$ 3,830.00$ 7,660.00$ 4,780.00$ 9,560.00$ 3,100.00$ 6,200.00$ 2,420.00$ 4,840.00$ 3,600.00$ 7,200.00$ 68 Cement Concrete Sidewalk 2,960 SY 50.00$ 148,000.00$ 85.00$ 251,600.00$ 84.00$ 248,640.00$ 103.00$ 304,880.00$ 80.00$ 236,800.00$ 72.30$ 214,008.00$ 78.50$ 232,360.00$ 69 Traffic Signal System - Smokey Point Boulevard and 156th Street NE, Complete 1 LS 60,000.00$ 60,000.00$ 125,000.00$ 125,000.00$ 207,596.00$ 207,596.00$ 115,000.00$ 115,000.00$ 126,500.00$ 126,500.00$ 196,020.00$ 196,020.00$ 135,000.00$ 135,000.00$ 70 Decorative Illumination System, Complete 1 LS 200,000.00$ 200,000.00$ 258,000.00$ 258,000.00$ 308,771.00$ 308,771.00$ 215,000.00$ 215,000.00$ 235,000.00$ 235,000.00$ 260,000.00$ 260,000.00$ 235,000.00$ 235,000.00$ 71 Permanent Signing 1 LS 1,000.00$ 1,000.00$ 3,000.00$ 3,000.00$ 2,992.00$ 2,992.00$ 1,000.00$ 1,000.00$ 1,150.00$ 1,150.00$ 3,000.00$ 3,000.00$ 2,500.00$ 2,500.00$ 72 Plastic Traffic Arrow 15 EA 750.00$ 11,250.00$ 225.00$ 3,375.00$ 239.00$ 3,585.00$ 230.00$ 3,450.00$ 230.00$ 3,450.00$ 250.00$ 3,750.00$ 210.00$ 3,150.00$ 73 Plastic Stop Line 103 LF 5.00$ 515.00$ 30.00$ 3,090.00$ 30.00$ 3,090.00$ 29.00$ 2,987.00$ 28.75$ 2,961.25$ 30.25$ 3,115.75$ 27.00$ 2,781.00$ 74 Plastic Crosswalk Line 560 SF 5.00$ 2,800.00$ 15.00$ 8,400.00$ 16.00$ 8,960.00$ 15.00$ 8,400.00$ 15.00$ 8,400.00$ 15.75$ 8,820.00$ 14.00$ 7,840.00$ 75 Profiled Methyl Methacrylate (MMA) Line 9,930 LF 4.00$ 39,720.00$ 3.00$ 29,790.00$ 4.00$ 39,720.00$ 3.75$ 37,237.50$ 4.00$ 39,720.00$ 3.85$ 38,230.50$ 3.40$ 33,762.00$ 2,464,713.00$ 2,908,828.00$ 2,752,298.00$ 2,306,037.90$ 2,223,797.75$ 2,469,601.74$ 2,224,530.80$ Base Bid Item Total Amount page 2 of 4 12/22/2025 Thursday Dec. 18, 2025 CERTIFIED BID TABULATIONCity of Marysville 156th Street NE Widening - Smokey Point Blvd to Hayho Creek TIB Project Number: 8-1-143(012)-1 Bid Opening Date: Thursday Dec. 18, 2025 No.Item Description Qty Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 1 Minor Changes 40,000 EST 1.00$ 40,000.00$ 1.00$ 40,000.00$ 1.00$ 40,000.00$ 1.00$ 40,000.00$ 1.00$ 40,000.00$ 1.00$ 40,000.00$ 1.00$ 40,000.00$ 2 Surveying 1 LS 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 20,000.00$ 20,000.00$ 19,440.00$ 19,440.00$ 6,200.00$ 6,200.00$ 17,858.50$ 17,858.50$ 18,097.11$ 18,097.11$ 3 ADA Features Surveing 1 LS 5,000.00$ 5,000.00$ 4,500.00$ 4,500.00$ 5,200.00$ 5,200.00$ 2,970.00$ 2,970.00$ 6,200.00$ 6,200.00$ 4,317.50$ 4,317.50$ 4,375.19$ 4,375.19$ 4 Record Drawings (Minimum Bid $2,500)1 LS 2,500.00$ 2,500.00$ 2,500.00$ 2,500.00$ 2,600.00$ 2,600.00$ 2,500.00$ 2,500.00$ 3,100.00$ 3,100.00$ 2,750.00$ 2,750.00$ 2,500.00$ 2,500.00$ 5 Spill Prevention, Control & Countermeasures (SPCC) Plan 1 LS 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,400.00$ 1,400.00$ 275.00$ 275.00$ 400.00$ 400.00$ 6 Utility Potholes 5 EA 1,000.00$ 5,000.00$ 600.00$ 3,000.00$ 400.00$ 2,000.00$ 500.00$ 2,500.00$ 415.00$ 2,075.00$ 385.00$ 1,925.00$ 528.88$ 2,644.40$ 7 Type B Progress Schedule 1 LS 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 1,100.00$ 1,100.00$ 2,800.00$ 2,800.00$ 2,700.00$ 2,700.00$ 275.00$ 275.00$ 400.00$ 400.00$ 8 Mobilization 1 LS 243,000.00$ 243,000.00$ 225,000.00$ 225,000.00$ 231,000.00$ 231,000.00$ 150,481.80$ 150,481.80$ 40,380.50$ 40,380.50$ 174,914.00$ 174,914.00$ 83,919.55$ 83,919.55$ 9 Project Temporary Traffic Control 1 LS 50,000.00$ 50,000.00$ 150,000.00$ 150,000.00$ 229,000.00$ 229,000.00$ 166,860.00$ 166,860.00$ 21,500.00$ 21,500.00$ 55,000.00$ 55,000.00$ 85,829.39$ 85,829.39$ 10 Portable Changeable Message Sign 1,400 HR 15.00$ 21,000.00$ 3.00$ 4,200.00$ 7.50$ 10,500.00$ 6.48$ 9,072.00$ 2.50$ 3,500.00$ 1.10$ 1,540.00$ 2.37$ 3,318.00$ 11 Uniformed Police Officer 40 HR 150.00$ 6,000.00$ 200.00$ 8,000.00$ 145.00$ 5,800.00$ 129.60$ 5,184.00$ 220.00$ 8,800.00$ 137.50$ 5,500.00$ 94.75$ 3,790.00$ 12 Clearing and Grubbing 1 LS 28,000.00$ 28,000.00$ 45,000.00$ 45,000.00$ 67,000.00$ 67,000.00$ 17,344.80$ 17,344.80$ 8,900.00$ 8,900.00$ 16,500.00$ 16,500.00$ 14,972.64$ 14,972.64$ 13 Removal of Structure and Obstruction 1 LS 62,000.00$ 62,000.00$ 45,000.00$ 45,000.00$ 53,800.00$ 53,800.00$ 63,158.40$ 63,158.40$ 27,000.00$ 27,000.00$ 26,376.90$ 26,376.90$ 37,982.57$ 37,982.57$ 14 Roadway Excavation Incl. Haul 1 LS 44,000.00$ 44,000.00$ 35,000.00$ 35,000.00$ 107,000.00$ 107,000.00$ 42,508.80$ 42,508.80$ 12,000.00$ 12,000.00$ 16,500.00$ 16,500.00$ 28,369.96$ 28,369.96$ 15 Gravel Borrow Incl. Haul 790 TN 40.00$ 31,600.00$ 34.00$ 26,860.00$ 35.85$ 28,321.50$ 31.26$ 24,695.40$ 27.00$ 21,330.00$ 24.47$ 19,331.30$ 16.88$ 13,335.20$ 16 Unsuitable Foundation Excavation Incl. Haul (If Required)80 CY 100.00$ 8,000.00$ 25.00$ 2,000.00$ 53.00$ 4,240.00$ 60.00$ 4,800.00$ 33.00$ 2,640.00$ 26.40$ 2,112.00$ 26.73$ 2,138.40$ 17 Shoring or Extra Excavation Class A 1 LS 27,000.00$ 27,000.00$ 15,000.00$ 15,000.00$ 1,000.00$ 1,000.00$ 1,620.00$ 1,620.00$ 1,100.00$ 1,100.00$ 110.00$ 110.00$ 1,090.92$ 1,090.92$ 18 Shoring or Extra Excavation Class B 1 LS 9,000.00$ 9,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 3,240.00$ 3,240.00$ 1,100.00$ 1,100.00$ 550.00$ 550.00$ 2,194.15$ 2,194.15$ 19 Crushed Surfacing Base Course 960 TN 65.00$ 62,400.00$ 42.00$ 40,320.00$ 42.00$ 40,320.00$ 37.17$ 35,683.20$ 27.00$ 25,920.00$ 36.02$ 34,579.20$ 37.34$ 35,846.40$ 20 Crushed Surfacing Top Course 530 TN 65.00$ 34,450.00$ 70.00$ 37,100.00$ 46.40$ 24,592.00$ 38.37$ 20,336.10$ 50.00$ 26,500.00$ 36.02$ 19,090.60$ 45.26$ 23,987.80$ 21 Commercial HMA Cl. 1/2" PG 64-22 1,100 TN 150.00$ 165,000.00$ 140.00$ 154,000.00$ 147.00$ 161,700.00$ 140.40$ 154,440.00$ 122.00$ 134,200.00$ 148.50$ 163,350.00$ 141.57$ 155,727.00$ 22 Planing Bituminous Pavement 800 SY 15.00$ 12,000.00$ 8.00$ 6,400.00$ 14.25$ 11,400.00$ 17.28$ 13,824.00$ 5.00$ 4,000.00$ 9.90$ 7,920.00$ 15.33$ 12,264.00$ 23 Asphalt Cost Price Adjustment 5,000 CALC 1.00$ 5,000.00$ 1.00$ 5,000.00$ 1.00$ 5,000.00$ 1.00$ 5,000.00$ 1.00$ 5,000.00$ 1.00$ 5,000.00$ 1.00$ 5,000.00$ 24 Thickened Edge Sidewalk 15 SY 340.00$ 5,100.00$ 500.00$ 7,500.00$ 619.00$ 9,285.00$ 572.54$ 8,588.10$ 221.00$ 3,315.00$ 220.00$ 3,300.00$ 557.35$ 8,360.25$ 25 VFG Walls and Slopes 4,820 SF 65.00$ 313,300.00$ 67.00$ 322,940.00$ 54.60$ 263,172.00$ 39.02$ 188,076.40$ 65.00$ 313,300.00$ 23.28$ 112,209.60$ 22.74$ 109,606.80$ 26 Corrugated Polyethylene Storm Sewer Pipe 12-In. Diam.1,060 LF 100.00$ 106,000.00$ 50.00$ 53,000.00$ 86.00$ 91,160.00$ 81.12$ 85,987.20$ 42.50$ 45,050.00$ 60.35$ 63,971.00$ 38.71$ 41,032.60$ 27 Corrugated Polyethylene Storm Sewer Pipe 18-In. Diam.52 LF 200.00$ 10,400.00$ 85.00$ 4,420.00$ 119.00$ 6,188.00$ 98.70$ 5,132.40$ 87.00$ 4,524.00$ 84.87$ 4,413.24$ 106.04$ 5,514.08$ 28 Catch Basin Type 1 7 EA 3,000.00$ 21,000.00$ 1,750.00$ 12,250.00$ 1,970.00$ 13,790.00$ 2,351.47$ 16,460.29$ 1,450.00$ 10,150.00$ 2,827.00$ 19,789.00$ 2,004.47$ 14,031.29$ 29 Concrete Inlet 5 EA 3,500.00$ 17,500.00$ 1,700.00$ 8,500.00$ 1,750.00$ 8,750.00$ 2,008.58$ 10,042.90$ 1,300.00$ 6,500.00$ 2,617.83$ 13,089.15$ 1,180.83$ 5,904.15$ 30 Catch Basin Type 2 48-In. Diam.3 EA 6,000.00$ 18,000.00$ 4,750.00$ 14,250.00$ 6,000.00$ 18,000.00$ 5,790.96$ 17,372.88$ 3,700.00$ 11,100.00$ 5,610.00$ 16,830.00$ 5,362.39$ 16,087.17$ 31 Connection to Drainage System 4 EA 1,000.00$ 4,000.00$ 650.00$ 2,600.00$ 1,350.00$ 5,400.00$ 810.00$ 3,240.00$ 620.00$ 2,480.00$ 2,282.50$ 9,130.00$ 632.58$ 2,530.32$ 32 Adjust Manhole 1 EA 800.00$ 800.00$ 450.00$ 450.00$ 885.00$ 885.00$ 1,080.00$ 1,080.00$ 1,200.00$ 1,200.00$ 550.00$ 550.00$ 445.29$ 445.29$ 33 Ductile Iron Pipe for Water Main 6- In. Diam.170 LF 150.00$ 25,500.00$ 75.00$ 12,750.00$ 115.00$ 19,550.00$ 91.76$ 15,599.20$ 110.00$ 18,700.00$ 97.05$ 16,498.50$ 54.41$ 9,249.70$ 34 Moving Existing Hydrant 9 EA 10,000.00$ 90,000.00$ 7,800.00$ 70,200.00$ 12,000.00$ 108,000.00$ 7,544.88$ 67,903.92$ 5,725.00$ 51,525.00$ 2,860.00$ 25,740.00$ 5,448.52$ 49,036.68$ 35 Erosion/Water Pollution Control 20,000 FA 1.00$ 20,000.00$ 1.00$ 20,000.00$ $1 20,000.00$ $1 20,000.00$ $1 20,000.00$ $1 20,000.00$ $1 20,000.00$ 36 Stormwater Pollution Prevention Plan (SWPPP) & Implementation 1 LS 20,000.00$ 20,000.00$ 1,000.00$ 1,000.00$ 33,000.00$ 33,000.00$ 3,780.00$ 3,780.00$ 1,340.00$ 1,340.00$ 550.00$ 550.00$ 557.34$ 557.34$ 37 ESC Lead 125 DAY 400.00$ 50,000.00$ 100.00$ 12,500.00$ 112.00$ 14,000.00$ 97.20$ 12,150.00$ 133.00$ 16,625.00$ 55.00$ 6,875.00$ 77.90$ 9,737.50$ 38 Inlet Protection 39 EA 150.00$ 5,850.00$ 55.00$ 2,145.00$ 67.25$ 2,622.75$ 86.40$ 3,369.60$ 80.00$ 3,120.00$ 23.10$ 900.90$ 30.48$ 1,188.72$ 39 High Visibility Silt Fence 980 LF 10.00$ 9,800.00$ 4.00$ 3,920.00$ 6.20$ 6,076.00$ 7.56$ 7,408.80$ 7.00$ 6,860.00$ 68.20$ 66,836.00$ 6.96$ 6,820.80$ 40 High Visibility Fence 2,140 LF 5.00$ 10,700.00$ 3.00$ 6,420.00$ 2.50$ 5,350.00$ 5.40$ 11,556.00$ 3.50$ 7,490.00$ 3.41$ 7,297.40$ 2.75$ 5,885.00$ 41 Wattle 30 LF 10.00$ 300.00$ 20.00$ 600.00$ 9.70$ 291.00$ 27.00$ 810.00$ 5.75$ 172.50$ 1.10$ 33.00$ 4.74$ 142.20$ 42 PSIPE - Acer x freemanii 'Scarsen' / Scarlet Sentinel Red Maple 2.5" Cal. / B&B 23 EA 650.00$ 14,950.00$ 800.00$ 18,400.00$ 768.50$ 17,675.50$ 783.00$ 18,009.00$ 801.00$ 18,423.00$ 236.50$ 5,439.50$ 808.16$ 18,587.68$ 43 PSIPE - Amelanchier alnifolia 'Obelisk' / Standing Ovation 18 EA 400.00$ 7,200.00$ 90.00$ 1,620.00$ 116.60$ 2,098.80$ 118.80$ 2,138.40$ 122.00$ 2,196.00$ 137.50$ 2,475.00$ 122.62$ 2,207.16$ 44 PSIPE - Acrctostaphylos uva-ursi / Kinnikinnick, 1 Gal. cont. 229 EA 24.00$ 5,496.00$ 20.00$ 4,580.00$ 19.10$ 4,373.90$ 19.44$ 4,451.76$ 20.00$ 4,580.00$ 5.50$ 1,259.50$ 20.06$ 4,593.74$ 45 PSIPE - Fragaria chiloensis / Beach Strawberry, 1 Gal. cont.230 EA 24.00$ 5,520.00$ 20.00$ 4,600.00$ 19.10$ 4,393.00$ 19.44$ 4,471.20$ 20.00$ 4,600.00$ 5.50$ 1,265.00$ 20.06$ 4,613.80$ 46 PSIPE - Juniperus scopulorum 'Skyrocket' / Skyrocket Juniper, 4ft. Ht, B&B 48 EA 345.00$ 16,560.00$ 100.00$ 4,800.00$ 159.00$ 7,632.00$ 162.00$ 7,776.00$ 165.00$ 7,920.00$ 110.00$ 5,280.00$ 167.20$ 8,025.60$ 47 PSIPE - Mahonia aquifolium 'Compacta' / Compact Oregon Grape, 1 Gal.cont.36 EA 30.00$ 1,080.00$ 22.00$ 792.00$ 23.35$ 840.60$ 21.60$ 777.60$ 22.00$ 792.00$ 5.50$ 198.00$ 22.29$ 802.44$ Earthwork Solutions RRJ Co. Engineer's Estimate Strider Strickland & Sons Kamins Reece page 3 of 4 CERTIFIED BID TABULATIONCity of Marysville 156th Street NE Widening - Smokey Point Blvd to Hayho Creek TIB Project Number: 8-1-143(012)-1 Bid Opening Date: Thursday Dec. 18, 2025 No.Item Description Qty Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Earthwork Solutions RRJ Co. Engineer's Estimate Strider Strickland & Sons Kamins Reece 48 PSIPE - Nandina domestica 'Gulf Stream / Gulf Stream Heavenly Bamboo, 1 Gal. cont.103 EA 30.00$ 3,090.00$ 22.00$ 2,266.00$ 23.35$ 2,405.05$ 23.76$ 2,447.28$ 24.00$ 2,472.00$ 5.50$ 566.50$ 24.52$ 2,525.56$ 49 PSIPE - Pinus mugo 'Columnaris' / Columnar Mugo Pine, 4ft. Ht, B&B 45 EA 375.00$ 16,875.00$ 85.00$ 3,825.00$ 196.10$ 8,824.50$ 199.80$ 8,991.00$ 205.00$ 9,225.00$ 110.00$ 4,950.00$ 206.22$ 9,279.90$ 50 PSIPE - Viburnum davidii / David Viburnum, 1 Gal. cont.77 EA 25.00$ 1,925.00$ 25.00$ 1,925.00$ 21.20$ 1,632.40$ 21.60$ 1,663.20$ 22.00$ 1,694.00$ 5.50$ 423.50$ 22.29$ 1,716.33$ 51 PSIPE - Turf Sod / Drought Tolerant Fescue Blend.478 SY 24.00$ 11,472.00$ 2.00$ 956.00$ 10.10$ 4,827.80$ 10.26$ 4,904.28$ 10.50$ 5,019.00$ 19.80$ 9,464.40$ 10.59$ 5,062.02$ 52 PSIPE - Native Erosion Control Seed Mix (Hydroseed)1,544 SY 9.00$ 13,896.00$ 1.50$ 2,316.00$ 3.45$ 5,326.80$ 3.35$ 5,172.40$ 3.50$ 5,404.00$ 1.92$ 2,964.48$ 3.41$ 5,265.04$ 53 Bark Mulch 362 SY 7.00$ 2,534.00$ 60.00$ 21,720.00$ 5.30$ 1,918.60$ 5.40$ 1,954.80$ 5.50$ 1,991.00$ 5.50$ 1,991.00$ 5.54$ 2,005.48$ 54 Topsoil Type A 400 CY 60.00$ 24,000.00$ 60.00$ 24,000.00$ 67.30$ 26,920.00$ 68.58$ 27,432.00$ 70.00$ 28,000.00$ 57.20$ 22,880.00$ 72.42$ 28,968.00$ 55 Compost Blanket (3" Fine Compost)1,800 SY 12.00$ 21,600.00$ 5.00$ 9,000.00$ 6.00$ 10,800.00$ 6.48$ 11,664.00$ 6.00$ 10,800.00$ 5.77$ 10,386.00$ 6.22$ 11,196.00$ 56 Root barrier 690 LF 12.00$ 8,280.00$ 12.00$ 8,280.00$ 15.90$ 10,971.00$ 16.20$ 11,178.00$ 17.00$ 11,730.00$ 16.50$ 11,385.00$ 8.92$ 6,154.80$ 57 Irrigation System 1 LS 20,000.00$ 20,000.00$ 15,000.00$ 15,000.00$ 23,850.00$ 23,850.00$ 24,300.00$ 24,300.00$ 24,800.00$ 24,800.00$ 14,300.00$ 14,300.00$ 31,670.49$ 31,670.49$ 58 Cement Conc. Traffic Curb and Gutter 1,100 LF 55.00$ 60,500.00$ 40.00$ 44,000.00$ 39.70$ 43,670.00$ 46.66$ 51,326.00$ 35.00$ 38,500.00$ 39.60$ 43,560.00$ 31.21$ 34,331.00$ 59 Cement Conc. Pedestrian Curb 140 LF 55.00$ 7,700.00$ 50.00$ 7,000.00$ 39.40$ 5,516.00$ 47.67$ 6,673.80$ 46.00$ 6,440.00$ 28.60$ 4,004.00$ 31.21$ 4,369.40$ 60 Cement Conc. Driveway Reverse Slope 80 SY 100.00$ 8,000.00$ 100.00$ 8,000.00$ 138.35$ 11,068.00$ 114.37$ 9,149.60$ 83.00$ 6,640.00$ 99.00$ 7,920.00$ 80.26$ 6,420.80$ 61 Raised Pavement Markers Type 2 2 HUND 500.00$ 1,000.00$ 800.00$ 1,600.00$ 2,700.00$ 5,400.00$ 810.00$ 1,620.00$ 830.00$ 1,660.00$ 825.00$ 1,650.00$ 836.02$ 1,672.04$ 62 Chain Link Fence 990 LF 45.00$ 44,550.00$ 60.00$ 59,400.00$ 44.80$ 44,352.00$ 81.00$ 80,190.00$ 44.00$ 43,560.00$ 44.00$ 43,560.00$ 62.98$ 62,350.20$ 63 Reset Survey Monument 5 EA 1,000.00$ 5,000.00$ 1,800.00$ 9,000.00$ 2,650.00$ 13,250.00$ 3,024.00$ 15,120.00$ 1,450.00$ 7,250.00$ 2,457.40$ 12,287.00$ 1,353.38$ 6,766.90$ 64 Cement Concrete Curb Ramp Type Perpendicular (10' width)2 EA 10,000.00$ 20,000.00$ 4,000.00$ 8,000.00$ 4,100.00$ 8,200.00$ 3,756.24$ 7,512.48$ 4,100.00$ 8,200.00$ 3,355.00$ 6,710.00$ 3,121.15$ 6,242.30$ 65 Cement Concrete Curb Ramp Type Perpendicular (5' width)4 EA 5,000.00$ 20,000.00$ 3,200.00$ 12,800.00$ 3,185.00$ 12,740.00$ 2,648.16$ 10,592.64$ 3,250.00$ 13,000.00$ 2,860.00$ 11,440.00$ 2,229.40$ 8,917.60$ 66 Cement Conc. Curb Ramp Type Parallel 4 EA 5,000.00$ 20,000.00$ 3,200.00$ 12,800.00$ 3,185.00$ 12,740.00$ 2,864.16$ 11,456.64$ 4,400.00$ 17,600.00$ 3,300.00$ 13,200.00$ 2,452.34$ 9,809.36$ 67 Cement Concrete Curb Ramp Type Single Direction (10' width)2 EA 10,000.00$ 20,000.00$ 4,000.00$ 8,000.00$ 4,075.00$ 8,150.00$ 3,432.24$ 6,864.48$ 4,400.00$ 8,800.00$ 3,850.00$ 7,700.00$ 2,786.75$ 5,573.50$ 68 Cement Concrete Sidewalk 2,960 SY 50.00$ 148,000.00$ 60.00$ 177,600.00$ 90.90$ 269,064.00$ 91.55$ 270,988.00$ 56.50$ 167,240.00$ 67.10$ 198,616.00$ 57.96$ 171,561.60$ 69 Traffic Signal System - Smokey Point Boulevard and 156th Street NE, Complete 1 LS 60,000.00$ 60,000.00$ 120,000.00$ 120,000.00$ 165,900.00$ 165,900.00$ 118,800.00$ 118,800.00$ 122,000.00$ 122,000.00$ 127,873.90$ 127,873.90$ 158,000.00$ 158,000.00$ 70 Decorative Illumination System, Complete 1 LS 200,000.00$ 200,000.00$ 215,000.00$ 215,000.00$ 243,600.00$ 243,600.00$ 221,400.00$ 221,400.00$ 225,000.00$ 225,000.00$ 215,875.00$ 215,875.00$ 190,000.00$ 190,000.00$ 71 Permanent Signing 1 LS 1,000.00$ 1,000.00$ 2,000.00$ 2,000.00$ 10,500.00$ 10,500.00$ 3,780.00$ 3,780.00$ 2,800.00$ 2,800.00$ 550.00$ 550.00$ 1,212.73$ 1,212.73$ 72 Plastic Traffic Arrow 15 EA 750.00$ 11,250.00$ 220.00$ 3,300.00$ 330.00$ 4,950.00$ 216.00$ 3,240.00$ 221.00$ 3,315.00$ 220.00$ 3,300.00$ 222.94$ 3,344.10$ 73 Plastic Stop Line 103 LF 5.00$ 515.00$ 27.00$ 2,781.00$ 30.25$ 3,115.75$ 27.00$ 2,781.00$ 28.00$ 2,884.00$ 27.50$ 2,832.50$ 27.87$ 2,870.61$ 74 Plastic Crosswalk Line 560 SF 5.00$ 2,800.00$ 14.00$ 7,840.00$ 14.00$ 7,840.00$ 14.04$ 7,862.40$ 15.00$ 8,400.00$ 14.30$ 8,008.00$ 14.49$ 8,114.40$ 75 Profiled Methyl Methacrylate (MMA) Line 9,930 LF 4.00$ 39,720.00$ 3.50$ 34,755.00$ 5.70$ 56,601.00$ 3.40$ 33,762.00$ 3.50$ 34,755.00$ 3.46$ 34,357.80$ 3.51$ 34,854.30$ 2,464,713.00$ 2,294,281.00$ 2,740,239.95$ 2,268,466.15$ 1,786,687.00$ 1,842,459.87$ 1,743,397.45$ Base Bid Item Total Amount page 4 of 4 LOW BIDSECONDTHIRD 12/22/2025 We hereby certify that this bid tabulation represents all bids received and that all calculations have been checked and are correct. (Highlighted entries denote math correction made,)