HomeMy WebLinkAboutBid Tabulation - Shoultes Elementary - 51st AVE NE ImprovementsCity of Marysville Shoultes Elementary - 51st AVE NE Improvements - Certified Bid Tabulation Bid Opening: June 17, 2026 1:00pm ITEM NO. ITEM QUANTITY UNIT UNIT PRICE EXTENDED AMOUNT UNIT PRICE EXTENDED AMOUNT UNIT PRICE EXTENDED AMOUNT UNIT PRICE EXTENDED AMOUNT UNIT PRICE EXTENDED AMOUNT UNIT PRICE EXTENDED AMOUNT UNIT PRICE EXTENDED AMOUNT UNIT PRICE EXTENDED AMOUNT 1 Minor Change (1-04.4(1))1 EST 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 2 Survey (1-05.4(2))1 LS 20,000.00$ 20,000.00$ 16,000.00$ 16,000.00$ 12,000.00$ 12,000.00$ 14,000.00$ 14,000.00$ 12,500.00$ 12,500.00$ 14,400.00$ 14,400.00$ 12,950.00$ 12,950.00$ 14,870.00$ 14,870.00$ 3 Record Drawings (Min. Bid $1,000) (1-05.18)1 LS 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 2,400.00$ 2,400.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 3,500.00$ 3,500.00$ 4 SPCC Plan (1-07.15(1))1 LS 500.00$ 500.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 500.00$ 500.00$ 1,000.00$ 1,000.00$ 475.00$ 475.00$ 5,140.00$ 5,140.00$ 5 Mobilization, Cleanup, and Demobilization (1-09.7)1 LS 110,000.00$ 110,000.00$ 120,000.00$ 120,000.00$ $100,000.00 $100,000.00 37,758.00$ 37,758.00$ 169,100.00$ 169,100.00$ 106,770.00$ 106,770.00$ 141,000.00$ 141,000.00$ 148,000.00$ 148,000.00$ 6 Project Temporary Traffic Control (1-10.5)1 LS 120,000.00$ 120,000.00$ 266,000.00$ 266,000.00$ 70,000.00$ 70,000.00$ 130,441.00$ 130,441.00$ 85,400.00$ 85,400.00$ 133,200.00$ 133,200.00$ 73,000.00$ 73,000.00$ 171,400.00$ 171,400.00$ 7 Portable Changeable Message Sign (1-10.5)16000 HR 4.00$ 64,000.00$ 0.50$ 8,000.00$ 0.10$ 1,600.00$ 2.00$ 32,000.00$ 0.01$ 160.00$ 0.01$ 160.00$ 0.10$ 1,600.00$ 11.00$ 176,000.00$ 8 Clearing and Grubbing (2-01.5)1 LS 18,000.00$ 18,000.00$ 50,000.00$ 50,000.00$ 20,000.00$ 20,000.00$ 27,000.00$ 27,000.00$ 32,300.00$ 32,300.00$ 17,220.00$ 17,220.00$ 54,000.00$ 54,000.00$ 21,440.00$ 21,440.00$ 9 Removal of Structures and Obstructions (2-02.5)1 LS 10,000.00$ 10,000.00$ 30,000.00$ 30,000.00$ 20,000.00$ 20,000.00$ 24,422.00$ 24,422.00$ 14,000.00$ 14,000.00$ 10,620.00$ 10,620.00$ 15,000.00$ 15,000.00$ 49,888.00$ 49,888.00$ 10 Removal of Asphalt Pavement (2-02.5)1900 SY 50.00$ 95,000.00$ 14.00$ 26,600.00$ 10.00$ 19,000.00$ 25.00$ 47,500.00$ 19.00$ 36,100.00$ 30.98$ 58,862.00$ 9.25$ 17,575.00$ 27.00$ 51,300.00$ 11 Excavation, Embankment and Grading, Incl. Haul (2-03.5)80 CY 60.00$ 4,800.00$ 38.00$ 3,040.00$ 95.00$ 7,600.00$ 85.00$ 6,800.00$ 21.00$ 1,680.00$ 90.38$ 7,230.40$ 175.00$ 14,000.00$ 115.00$ 9,200.00$ 12 Unsuitable Foundation Excavation, Incl. Haul (2-03.5)10 CY 50.00$ 500.00$ 60.00$ 600.00$ 100.00$ 1,000.00$ 75.00$ 750.00$ 1.00$ 10.00$ 100.00$ 1,000.00$ 57.00$ 570.00$ 125.00$ 1,250.00$ 13 Controlled Density Fill (2-09.5)5 CY 200.00$ 1,000.00$ 275.00$ 1,375.00$ 300.00$ 1,500.00$ 280.00$ 1,400.00$ 1.00$ 5.00$ 480.00$ 2,400.00$ 325.00$ 1,625.00$ 265.00$ 1,325.00$ 14 Locate Existing Utilities (2-09.5)1 LS 5,000.00$ 5,000.00$ 6,000.00$ 6,000.00$ 15,000.00$ 15,000.00$ 21,000.00$ 21,000.00$ 10,000.00$ 10,000.00$ 6,984.00$ 6,984.00$ 4,200.00$ 4,200.00$ 8,800.00$ 8,800.00$ 15 Crushed Surfacing Top Course (4-04.5)170 TN 60.00$ 10,200.00$ 70.00$ 11,900.00$ 75.00$ 12,750.00$ 125.00$ 21,250.00$ 67.00$ 11,390.00$ 58.16$ 9,887.20$ 32.00$ 5,440.00$ 78.00$ 13,260.00$ 16 Crushed Surfacing Base Course (4-04.5)620 TN 60.00$ 37,200.00$ 60.00$ 37,200.00$ 40.00$ 24,800.00$ 62.00$ 38,440.00$ 46.50$ 28,830.00$ 58.27$ 36,127.40$ 51.00$ 31,620.00$ 72.00$ 44,640.00$ 17 Asphalt Treated Base (4-06.5)390 TN 180.00$ 70,200.00$ 170.00$ 66,300.00$ 150.00$ 58,500.00$ 170.00$ 66,300.00$ 168.00$ 65,520.00$ 200.92$ 78,358.80$ 203.00$ 79,170.00$ 220.00$ 85,800.00$ 18 HMA Cl. 1/2" PG 58H-22 (5-04.5)210 TN 220.00$ 46,200.00$ 170.00$ 35,700.00$ 190.00$ 39,900.00$ 170.00$ 35,700.00$ 178.00$ 37,380.00$ 213.71$ 44,879.10$ 189.00$ 39,690.00$ 225.00$ 47,250.00$ 19 Job Mix Compliance Price Adjustment (5-04.5)1 CALC -$ -$ -$ -$ -$ -$ -$ -$ 20 Compaction Price Adjustment (5-04.5)1 CALC -$ -$ -$ -$ -$ -$ -$ -$ 21 Infiltration Trench (7-01.5)2720 SF 60.00$ 163,200.00$ 42.00$ 114,240.00$ 35.00$ 95,200.00$ 35.00$ 95,200.00$ 26.00$ 70,720.00$ 26.08$ 70,937.60$ 32.00$ 87,040.00$ 28.00$ 76,160.00$ 22 DI Storm Sewer Pipe 8 In. Diam. (Incl. Bedding) (7-04.5)55 LF 250.00$ 13,750.00$ 105.00$ 5,775.00$ 108.00$ 5,940.00$ 113.00$ 6,215.00$ 149.00$ 8,195.00$ 130.58$ 7,181.90$ 96.00$ 5,280.00$ 114.00$ 6,270.00$ 23 DI Storm Sewer Pipe 12 In. Diam. (Incl. Bedding) (7-04.5)175 LF 200.00$ 35,000.00$ 130.00$ 22,750.00$ 140.00$ 24,500.00$ 150.00$ 26,250.00$ 155.00$ 27,125.00$ 158.43$ 27,725.25$ 130.00$ 22,750.00$ 204.00$ 35,700.00$ 24 CPEP Storm Sewer Pipe 12 In. Diam. (Incl. Bedding) (7-04.5)200 LF 110.00$ 22,000.00$ 84.00$ 16,800.00$ 80.00$ 16,000.00$ 95.00$ 19,000.00$ 104.00$ 20,800.00$ 111.00$ 22,200.00$ 71.00$ 14,200.00$ 166.00$ 33,200.00$ 25 Curb Inlet (7-05.5)7 EA 2,200.00$ 15,400.00$ 2,300.00$ 16,100.00$ 2,100.00$ 14,700.00$ 2,500.00$ 17,500.00$ 1,900.00$ 13,300.00$ 2,430.00$ 17,010.00$ 2,310.00$ 16,170.00$ 2,877.00$ 20,139.00$ 26 Catch Basin, Type 1 (7-05.5)2 EA 2,500.00$ 5,000.00$ 2,400.00$ 4,800.00$ 1,950.00$ 3,900.00$ 2,600.00$ 5,200.00$ 2,200.00$ 4,400.00$ 3,132.00$ 6,264.00$ 2,310.00$ 4,620.00$ 3,980.00$ 7,960.00$ 27 Catch Basin, Type 2, 48 In. Diam. (7-05.5)3 EA 8,000.00$ 24,000.00$ 4,500.00$ 13,500.00$ 4,900.00$ 14,700.00$ 5,500.00$ 16,500.00$ 4,100.00$ 12,300.00$ 7,494.00$ 22,482.00$ 4,835.00$ 14,505.00$ 7,659.00$ 22,977.00$ 28 Stormwater Treatment Structure, CB No. 1 (7-05.5)1 EA 30,000.00$ 30,000.00$ 24,000.00$ 24,000.00$ 25,500.00$ 25,500.00$ 30,000.00$ 30,000.00$ 25,250.00$ 25,250.00$ 27,516.00$ 27,516.00$ 25,650.00$ 25,650.00$ 34,200.00$ 34,200.00$ 29 Stormwater Treatment Structure, CB No. 3 (7-05.5)1 EA 20,000.00$ 20,000.00$ 17,000.00$ 17,000.00$ 19,500.00$ 19,500.00$ 22,000.00$ 22,000.00$ 18,800.00$ 18,800.00$ 19,836.00$ 19,836.00$ 18,000.00$ 18,000.00$ 24,690.00$ 24,690.00$ 30 Stormwater Treatment Structure, CB No. 6 (7-05.5)1 EA 40,000.00$ 40,000.00$ 30,000.00$ 30,000.00$ 31,200.00$ 31,200.00$ 36,000.00$ 36,000.00$ 31,000.00$ 31,000.00$ 33,234.00$ 33,234.00$ 30,600.00$ 30,600.00$ 46,777.00$ 46,777.00$ 31 Stormwater Treatment Structure, CB No. 8 (7-05.5)1 EA 50,000.00$ 50,000.00$ 36,000.00$ 36,000.00$ 36,000.00$ 36,000.00$ 42,000.00$ 42,000.00$ 35,500.00$ 35,500.00$ 38,514.00$ 38,514.00$ 35,850.00$ 35,850.00$ 49,880.00$ 49,880.00$ 32 Modify Existing Manhole (7-05.5)2 EA 3,000.00$ 6,000.00$ 3,000.00$ 6,000.00$ 2,200.00$ 4,400.00$ 2,500.00$ 5,000.00$ 2,250.00$ 4,500.00$ 2,400.00$ 4,800.00$ 3,400.00$ 6,800.00$ 5,544.00$ 11,088.00$ 33 Bank Run Gravel for Trench Backfill (7-08.5 )620 TN 30.00$ 18,600.00$ 43.00$ 26,660.00$ 30.00$ 18,600.00$ 45.00$ 27,900.00$ 1.00$ 620.00$ 67.81$ 42,042.20$ 11.00$ 6,820.00$ 66.00$ 40,920.00$ 34 Removal of Unsuitable Material (Trench) (7-08.5)10 CY 50.00$ 500.00$ 90.00$ 900.00$ 200.00$ 2,000.00$ 30.00$ 300.00$ 1.00$ 10.00$ 100.00$ 1,000.00$ 45.50$ 455.00$ 115.00$ 1,150.00$ 35 Trench Excavation Safety Systems (7-08.5)1 LS 5,000.00$ 5,000.00$ 15,000.00$ 15,000.00$ 1,500.00$ 1,500.00$ 6,700.00$ 6,700.00$ 500.00$ 500.00$ 7,200.00$ 7,200.00$ 2,350.00$ 2,350.00$ 12,400.00$ 12,400.00$ 36 Modify Existing Fire Hydrant (7-14.5)1 EA 2,500.00$ 2,500.00$ 1,300.00$ 1,300.00$ 2,000.00$ 2,000.00$ 1,800.00$ 1,800.00$ 3,300.00$ 3,300.00$ 4,092.00$ 4,092.00$ 3,000.00$ 3,000.00$ 5,640.00$ 5,640.00$ 37 Adjust Meter Box (7-15.5)5 EA 500.00$ 2,500.00$ 200.00$ 1,000.00$ 730.00$ 3,650.00$ 1,100.00$ 5,500.00$ 840.00$ 4,200.00$ 360.00$ 1,800.00$ 350.00$ 1,750.00$ 677.00$ 3,385.00$ 38 Relocate Existing Water Service (7-15.5)3 EA 1,200.00$ 3,600.00$ 1,000.00$ 3,000.00$ 1,550.00$ 4,650.00$ 1,600.00$ 4,800.00$ 1,776.00$ 5,328.00$ 2,880.00$ 8,640.00$ 1,100.00$ 3,300.00$ 5,100.00$ 15,300.00$ 39 Erosion Control and Water Pollution Prevention (8-01.5)1 LS 10,000.00$ 10,000.00$ 7,000.00$ 7,000.00$ 30,000.00$ 30,000.00$ 1,000.00$ 1,000.00$ 10,400.00$ 10,400.00$ 5,400.00$ 5,400.00$ 12,000.00$ 12,000.00$ 27,666.00$ 27,666.00$ 40 Topsoil, Type A (8-02.5)60 CY 80.00$ 4,800.00$ 95.00$ 5,700.00$ 80.00$ 4,800.00$ 100.00$ 6,000.00$ 60.00$ 3,600.00$ 96.00$ 5,760.00$ 102.00$ 6,120.00$ 115.00$ 6,900.00$ 41 Seeding, Fertilizing and Mulching (8-02.5)500 SY 10.00$ 5,000.00$ 2.50$ 1,250.00$ 5.00$ 2,500.00$ 3.00$ 1,500.00$ 4.00$ 2,000.00$ 2.40$ 1,200.00$ 3.55$ 1,775.00$ 11.00$ 5,500.00$ 42 Cement Concrete Traffic Curb and Gutter (8-04.5)1210 LF 60.00$ 72,600.00$ 35.00$ 42,350.00$ 35.00$ 42,350.00$ 44.00$ 53,240.00$ 47.50$ 57,475.00$ 37.22$ 45,036.20$ 36.25$ 43,862.50$ 67.00$ 81,070.00$ 43 Cement Concrete Extruded Curb (8-04.5)15 LF 50.00$ 750.00$ 73.00$ 1,095.00$ 90.00$ 1,350.00$ 40.00$ 600.00$ 200.00$ 3,000.00$ 78.00$ 1,170.00$ 77.00$ 1,155.00$ 80.00$ 1,200.00$ 44 Cement Concrete Driveway Entrance (8-06.5)90 SY 150.00$ 13,500.00$ 105.00$ 9,450.00$ 135.00$ 12,150.00$ 110.00$ 9,900.00$ 135.00$ 12,150.00$ 123.53$ 11,117.70$ 100.00$ 9,000.00$ 160.00$ 14,400.00$ 45 Split Rail Wood Fence (8-12.5)120 LF 40.00$ 4,800.00$ 34.00$ 4,080.00$ 40.00$ 4,800.00$ 40.00$ 4,800.00$ 39.00$ 4,680.00$ 46.80$ 5,616.00$ 61.00$ 7,320.00$ 60.00$ 7,200.00$ 46 Remove and Relocate Existing Chain Link Fence (8-12.5)20 LF 60.00$ 1,200.00$ 110.00$ 2,200.00$ 66.00$ 1,320.00$ 55.00$ 1,100.00$ 20.00$ 400.00$ 62.40$ 1,248.00$ 62.00$ 1,240.00$ 45.00$ 900.00$ 47 Wood Fence, 6 Feet High (8-12.5)210 LF 80.00$ 16,800.00$ 70.00$ 14,700.00$ 65.00$ 13,650.00$ 63.00$ 13,230.00$ 75.00$ 15,750.00$ 74.40$ 15,624.00$ 75.00$ 15,750.00$ 55.00$ 11,550.00$ 48 Temporary Fence (8-12.5)210 LF 20.00$ 4,200.00$ 16.00$ 3,360.00$ 12.00$ 2,520.00$ 10.00$ 2,100.00$ 21.00$ 4,410.00$ 8.40$ 1,764.00$ 12.00$ 2,520.00$ 6.00$ 1,260.00$ 49 Cement Conc. Sidewalk (8-14.5)750 SY 100.00$ 75,000.00$ 65.00$ 48,750.00$ 68.00$ 51,000.00$ 95.00$ 71,250.00$ 101.00$ 75,750.00$ 103.32$ 77,490.00$ 85.00$ 63,750.00$ 115.00$ 86,250.00$ 50 Detectable Warning Surface (8-14.5)90 SF 100.00$ 9,000.00$ 35.00$ 3,150.00$ 45.00$ 4,050.00$ 75.00$ 6,750.00$ 53.00$ 4,770.00$ 54.00$ 4,860.00$ 33.00$ 2,970.00$ 110.00$ 9,900.00$ 51 Relocate Exisitng Mailbox (8-18.5)3 EA 1,000.00$ 3,000.00$ 1,000.00$ 3,000.00$ 560.00$ 1,680.00$ 3,500.00$ 10,500.00$ 480.00$ 1,440.00$ 540.00$ 1,620.00$ 750.00$ 2,250.00$ 3,210.00$ 9,630.00$ 52 Reestablish Traffic Detection Loop (8-20.5)1 EA 2,500.00$ 2,500.00$ 6,000.00$ 6,000.00$ 7,000.00$ 7,000.00$ 3,700.00$ 3,700.00$ 4,100.00$ 4,100.00$ 4,388.40$ 4,388.40$ 4,300.00$ 4,300.00$ 4,100.00$ 4,100.00$ 53 Permanent Signing (8-21.5)1 LS 20,000.00$ 20,000.00$ 17,000.00$ 17,000.00$ 17,000.00$ 17,000.00$ 13,000.00$ 13,000.00$ 12,500.00$ 12,500.00$ 15,240.00$ 15,240.00$ 19,500.00$ 19,500.00$ 18,700.00$ 18,700.00$ 54 RRFB Installation - 134th Place NE, Complete (8-21.5)1 LS 30,000.00$ 30,000.00$ 32,000.00$ 32,000.00$ 35,000.00$ 35,000.00$ 20,000.00$ 20,000.00$ 22,000.00$ 22,000.00$ 29,408.40$ 29,408.40$ 23,200.00$ 23,200.00$ 23,000.00$ 23,000.00$ 55 Speed Radar Sign, Complete (8-21.5)1 LS 25,000.00$ 25,000.00$ 19,000.00$ 19,000.00$ 20,000.00$ 20,000.00$ 18,000.00$ 18,000.00$ 20,000.00$ 20,000.00$ 27,184.80$ 27,184.80$ 21,000.00$ 21,000.00$ 19,700.00$ 19,700.00$ 56 Paint Line (8-22.5)730 LF 4.00$ 2,920.00$ 1.10$ 803.00$ 1.00$ 730.00$ 1.30$ 949.00$ 2.50$ 1,825.00$ 1.14$ 832.20$ 1.15$ 839.50$ 3.00$ 2,190.00$ 57 Painted Wide Line (8-22.5)1640 LF 4.00$ 6,560.00$ 1.60$ 2,624.00$ 1.20$ 1,968.00$ 2.00$ 3,280.00$ 3.15$ 5,166.00$ 1.38$ 2,263.20$ 1.50$ 2,460.00$ 4.00$ 6,560.00$ 58 Plastic Stop Line (8-22.5)40 LF 10.00$ 400.00$ 40.00$ 1,600.00$ 36.00$ 1,440.00$ 25.00$ 1,000.00$ 27.50$ 1,100.00$ 42.00$ 1,680.00$ 41.50$ 1,660.00$ 30.00$ 1,200.00$ 59 Plastic Crosswalk Line (8-22.5)360 LF 20.00$ 7,200.00$ 18.00$ 6,480.00$ 9.00$ 3,240.00$ 20.00$ 7,200.00$ 27.50$ 9,900.00$ 10.20$ 3,672.00$ 10.00$ 3,600.00$ 30.00$ 10,800.00$ 60 Painted Bicycle Lane and Arrow Symbol (8-22.5)3 EA 200.00$ 600.00$ 320.00$ 960.00$ 330.00$ 990.00$ 130.00$ 390.00$ 55.00$ 165.00$ 378.00$ 1,134.00$ 375.00$ 1,125.00$ 55.00$ 165.00$ 61 Remove Existing Pavement Markings (8-22.5)1 LS 10,000.00$ 10,000.00$ 3,500.00$ 3,500.00$ 3,100.00$ 3,100.00$ 4,500.00$ 4,500.00$ 5,500.00$ 5,500.00$ 3,600.00$ 3,600.00$ 3,550.00$ 3,550.00$ 5,600.00$ 5,600.00$ 62 Project Sign (8-31.5)1 EA 1,500.00$ 1,500.00$ 1,200.00$ 1,200.00$ 1,000.00$ 1,000.00$ 500.00$ 500.00$ 1,000.00$ 1,000.00$ 600.00$ 600.00$ 900.00$ 900.00$ 1,800.00$ 1,800.00$ Total Base Bid 1,422,980.00$ 1,297,792.00$ 1,018,228.00$ 1,154,115.00$ 1,097,204.00$ 1,185,482.75$ 1,068,902.00$ 1,683,140.00$ Sales Tax @ 9.4%-$ -$ -$ -$ -$ -$ -$ -$ TOTAL BASE BID 1,422,980.00$ 1,297,792.00$ 1,018,228.00$ 1,154,115.00$ 1,097,204.00$ 1,185,482.75$ 1,068,902.00$ 1,683,140.00$ Red text entries denote math corrections made. Apparent Low Bidder Engineer's Estimate Colacurcio Brothers, Inc. P & A Civil, LLC SRV Consturction, Inc. A-1 Landscaping and Construction, Inc. We hereby certify that this bid tabulation represents all bids received and that all calculations have been checked and are correct. Gregco Excavating LLC Kamins Construction, Inc. Bayshore Construction Company We hereby certify that this bid tabulation represents D2301_Shoultes Elementary - 51st AVE NE Improvements_Bid Tab