Loading...
HomeMy WebLinkAbout1043 - Washington State Dept of Commerce - Agreement - PWTF PW-01-691-PRE-1141. Contractor Marysvi lle, City of 1049 State Ave Marysville , WA 98270 AMENDMENT FACE SHEET Loan Number: PW-01-691-PRE-114 Amendment Number: 8 Washington State Department of Commerce PUBLIC WORKS BOARD Loan Contract 2. Contractor Doing Business As (optional) NIA 3. Co ntractor Representative (only if 4. Public Works Board Representative (only if updated) updated) N/A NIA 5. Original Contract Amount 6. Amendment Amount 7 . New Contract Amount $ 1,000 ,00 0.0 0 N/A-N/A 8. Amendment Funding Source 9. Amendment Start Date 10. Contract End Date Federal : 0 State: 0 Other: 0 N/A: D October 151h, 2014 June 1, 2021 11. Federal Funds (as applicable): Federal Agency: CFDA Number: N/A NIA NIA 12. Amendment Pur pose: The purpose of this amendment is to formally alter the day and month in which loan pay ments are due from July 1 to June 1. The Board , defined as the Washington State Pub lic Works Board, and Borrower/Contractor acknowledge ·a nd accept the terms of this AgreemenUContract As Amended and attachments and have execu ted this Contract on the date below to start as of the date shown above. The rights and obligations of both parties to this AgreemenUContract As Amended are governed by this AgreemenUContract Amendment and the following other documents in corporated by reference : Amendment Terms and Conditions including all attachments. A copy of this A greem en UContract Amendment shall be attached to and made a part of the origina l AgreemenUContract between th e Boa rd and the Borrower/Co ntrac tor. Any reference in the origina l Contract to "Agreement" or "Contra ct" sh all mean the "Agree ment As Ame nd ed" or "Contract As Amended," respectively. FOR THE B~7 CO~TRACTO~ r l__~ ~ Signatur~ / // \..»!:] _JVc,/.,t",{J Print Name Titl e N\A\jo<L Date \D)1~/1v Marysville, C ity of PW-01-691 -PRE-114 FOR PUBLIC WORKS BOARD . ~LM/- stif(FielStein, PLiiicworks Board Cha ir ·Oe/. ~~ 2-i?/l/ Date APPROVED AS TO FORM ONLY This 15th Day of July, 2013 Bob Ferguson Attorney General Signature on Fi le Kathryn Wyatt Assistant Attorney General Page 3 L oan End Date Amendment All PWTF Programs AMENDMENT TERMS AND CONDITIONS Contractor/Borrower: Contract Number: Amendment Number: Washington State Department of Commerce PUBLIC WORKS BOARD Loan Contract Marysville, City of PW-01-691-PRE-114 B The Public Works Board (or its successors), a department of the State of Washington, (hereafter referred to as tile "Board") and tile Contractor, listed on the Face Sheet, agree to amend the above listed contract by revising all clauses contained therein that reference (in whole or in part) the annual Loan Repayment month and Loan End Date month. The Loan Repayment and Loan End Date months shall be revised to read "June 1" instead of "July 1" as the month and day in which all loan repayments are to be made. The final payment shall be on or before June 1, 2021, of an amount sufficient to bring the loan balance to zero. Marysville, City of PW-01-691-PRE-114 Page4 Loan End Date Amendment All PWTF Programs Amortization Schedule for Contract Num: PW-01-691-PRE-114 Co.ntracto,r,~~rne: .•••. ,t-ia&~vi0 lle···Qty Of Project Nameo WWTP Upgrade tbari-l'htorn1at:io-ri: ;::La~-~~ :i Loan Amount: $1,000,ooo.oo Interest Rate/Type: 0.5000 % (Simple) Amortized Loan Fee: 0.0000 °/o Payment Frequency: Annual -360 Days Periods Principal Deferred: 1 Draw Based Loan: Yes 2 71112003 $52,631.57 $4,857.64 3 71112004 $52,631.57 $4,736.84 4 71112005 $52,631.57 $4,473.68 5 71112006 $52,631.57 $4,210.52 6 71112007 $52,631.57. $3,947.37 7 71112008 $52,631.62 $3,684.21 8 71112009 $52,631.58 $3,421.05 9 71112010 $52,631.58 $3, 157.89 10 71112011 . $52,631.58 $2,894.74 11 71112012 $52,631.58 $2,631.58' 12 71112013 $52,631.58 $2,368.42 13 711120W $52,631.58 $2,105.26 14 61112015' $52,631.58 $1,688.60 15 61112016 $52,631.58. $1,578.95 16 61112017 $52,631.58 $1,315.79 ,. 17. 61112018 $52,631.58 $1,052.63 18 61112019 $52,631.58' $789.47 19 61112020 $52,631.57 $526.32 20 61112021 $52,631.58 $263.16 Loan Type: Amortizing Loan Loan Term: 20 Years Amortization Term: 19 Years Paid Off: Loan Source: PWTF Terminated Date: Loan Start Date: 6/30/2001 Accrual Start Date: First Payment Date: 6/1/2002 Last Payment Date: 6/1/2021 Distressed Community: N/A Subordination Allowed: N/A Amortization Schedule $4,857.64 $57,489.21 $94 7 ,368.43 0513012003 $4,736.84 $57,368.41 $894,736.86 0513012004 82924 0612812004 $4,473.68 $57, 105.25 $842, 105.29 0513012005. 82925 0612712005 $4,210.52 $56,842.09 $789,473.72 0513012006 82926 0611212006 $3,947.37 $56,578.94 $736,842.15 0513012007 82927 0611812007 $3,684.21 $56,315.83 $684,210.53 0613012008 82928 0710812008. $3,421.05 $56,052.63 $631,578.95 0613012009 82929. 0613012009 $3,157.89• $55,789.47 $578,947.37 0710112010 82930 0710112010 $2,894.74 $55,526.32 $526,315.79 0510312011 82942 0512412011, ' ~" ,, $2,631.58', $55,263.16 $473,684.21 0610412012 82943 0710212012 $2,368.42 $55,000.00 $421,052.63 0610312013 82944 0612512013 $2,105.26' $54,736.84 $368,421.05 0512912014 82945 0613012014 $1,688.60' $54,320.18 $315,789.47 $1,578.95' $54,210.53 $263, 157.89 $1,315.79 $53,947.37 $210,526.31 $1,052.63' $53,684.21 $157,894.73 $789.47 $53,421.05 $105,263.15 $526.32• $53,157.89 $52,631.58 $263.16 $52,894.74 $0.00 10/30/2014 3:57:10 PM Contract Num: PW-01-691-PRE-114 Loan# 1 $57,368.41 $57,105.25 $56,842.09 $56,578.94 $56,315.83 $56,052.63 $55,789.47 $55,526.32 $55,263.16 $55,000.00 $54,736.84 CTED\carrieC Page: 1 of 2 Totals: $1,000,000.00 $50,037.45 $50,037.45 $1,050,037.45 $674,401.48 10/30/2014 3:57:10 PM Contract Num: PW-01-691-PRE-114 Loan# 1 CTED\carrieC Page: 2 of 2 PUBLIC WORKS TRUST FUND QUARTERLY REPORT REPORTING PERIOD: QUARTER ENDING June 30, 2002 Loan Number: PW-01-691-PRE-114 Project Name: Wastewater Treatment Plant Upgrade Please refer to the Scope of Work (Attachment I) portion of the Loan Agreement in place between the Department of Community, Trade and Economic Development (CTED) and your jurisdiction. Provide a brief narrative report of project activities undertaken during the last quarter (three months). Please let us know if you are experiencing problems or delays, as well as positive accomplishments. Attach additional sheets if necessary. I. NARRATIVE The phase 1 plans are currently at the 95% stage. A constructability review is completed on phase 1 plans. Phase two plans are at 30% completion. The Bio-solids plans out for advertisement. Opening Bio-solids bid on July 11, 2002. Permitting is complete for phase 1 .. II. CHANGES Please advise us of any changes or deviations from the project Scope of Work or project time table as contained in the loan agreement and/or application. None III. CLOSE-OUT EXTENSIONS Based on the Close-Out Date or Extended Date on the front of this form; Do you need an extension for this project? If so, please prepare a letter requesting the extension. Include a current status report, reasons for the extension, and a proposed new close-out date. Project is on schedule. Name: Kevin Nielsen Date: 7 /29/02 Title: Project Manager Telephone: 360-651-5170 E-mail: knielsen@ci.marysville.wa.us Return Completed Report By June 30, 2002 To Your Regional Account Executive At The E-mail Address Listed At www.pwb.wa.gov/staff.htm C:\ W!NNnProfi!es\LHafford\Local Settings\T emporary Internet Files\OLK3\Quartfrmwwtp2.rtf July 29, 2002 PUBLIC WORKS TRUST FUND QUARTERLY REPORT REPORTING PERIOD: QUARTER ENDING MARCH 31, 2002 Loan Nnmber: PW-01-691-PRE-114 Project Name: Wastewater Treatment Plant Upgrade Please refer to the Scope of Work (Attachment I) portion of the Loan Agreement io place between the Department of Community, Trade and Economic Development (CTED) and your jurisdiction. Provide a brief narrative report of project activities undertaken duriog the last quarter (tluee months). Please let us know if you are experiencing problems or delays, as well as positive accomplishments. Attach additional sheets if necessary. I. NARRATIVE The phase 1 plans are currently at the 95% stage. The Biosolids plans are being completed and we are currently permitting the removal tluough Department of Ecology. II. CHANGES Please advise us of any changes or deviations from the project Scope of Work or project time table as contained in the loan agreement and/or application. None III. CLOSE-OUT EXTENSIONS Based on the Close-Out Date or Extended Date on the front of this form; Do you need an extension for this project? If so, please prepare a letter requesting the extension. Include a current status report, reasons for the extension, and a proposed new close-out date. Project is on schedule. Name: Kevin Nielsen Date: 4/16/02 Title: Project Manager Telephone: 360-651-5170 E-mail: knielsen@ci.marysville.wa.us Return Completed Report By April 30, 2002 To Your Regional Account Executive At The E-mail Address Listed At www.pwb.wa.gov/staff.htm C:\WI N NT\Profiles\LHafford\Local Settings\ Temporary Internet Files\OLK3\Quartfrmwwtp.rtf April 17, 2002 Washington State Public Works Board Post Office Box 48319 Olympia, Washington 98504-8319 July 16, 2002 Mr. Kevin Nielsen City of Marysville 80 Columbia Avenue Marysville, Washington 98270 Regarding: PWTF Loan Agreement PW-01-691-PRE-114 Dear Mr. Nielsen: Enclosed for your files is a fully executed copy of an amendment to Public Works Trust Fund Loan Agreement Number PW-01-691-PRE-114. The amendment extends the loan term from 5 to 20 years. If you have any questions, please call me at (360) 725-5004. Sincerely, ~~B~u~t~zfY'_''~1 -\-'--;;,,.--:...-;z:.~~­ Contracts Manag SB Enclosure Administrative services provided by the Office of Community Development (360) 725-5000 FAX: (360) 664-3029 Web Site: www.pwb.wa.gov City Clerk INCORPORATED 1891 July 11, 2002 fo) ~ er; ~ J1 w· Jill JUL I 2 2002 Mr. Mike Woods fol ~ Program Resources Manager ill[JJ~U\G \li§l;°Jlfili!:i'J IBJIQlll!IB!!l!' Washington State Public Works Board Post Office Box 48319 Olympia, WA 98504-8319 Dear Mr. Woods: Enclosed please find three signed Amendments to PWTF Loan Agreement PW- 01-691-PRE-114 extending the repayment term to 20 years. We look forward to having one fully executed amendment returned to City Clerk, City of Marysville, 4822 Grove Street, Marysville, Washington 98270. If you have any questions regarding this amendment, please do not hesitate to contact Assistant City Engineer Jeff Massie at 360-651-5100. Sincerely, Lillie Lein Deputy Clerk LL/ Enclosures cc: Jeff Massie, Assistant City Engineer Sandy Langdon, Finance Director 4822 Grove Street+ Marysville, Washington+ 98270 + (360) 651-5000 +FAX (360) 651-5033 June 17, 2002 Washington State Public Works Board Post Office Box 48319 Olympia, Washington 98504-8319 MR. KEVIN NIELSEN CITY OF MARYSVILLE 80 COLUMBIA A VENUE MARYSVILLE, WA. 98270 RE: Completing the Final Voucher and Close-Out Report for Public Works Trust Fund Pre-Construction Loan • Loan Number: PW-01-691-PRE-114 • Project Name: WAS TEW ATER TREATMENT PLANT UPGRADE Deai MR. NIELSEN: Enclosed please find the Final Voucher and Close-Out Report for Public Works Trust Fund Pre- Construction Loan Number PW-01-691-PRE-114, Project Name: WASTEWATER TREATMENT PLANT UPGRADE. These forms should be completed and sent to the Public Works Boaid as soon as possible after the project is finished. The forms should be sent to: LESLIE HAFFORD Public Works Board 210 ll'h Avenue POBox48319 Olympia, WA 98504-8319 You will note that our office has completed the estimated expenditures by cost category, and we have also identified the eligibility date, the total project allocation, and the amount drawn to date. The information was taken from the project loan file. Please review these items to ensure that they agree with your figures. If you have any questions, please contact me at (360) 725-5007. Sincerely, ~~~ LESLIE HAFFORD Regional Account Executive Enclosures (360) 725-5000 Administrative services provided by the Office of Community Development FAX: (360) 664-3029 Web Site: www.pwb.wa.gov Public W arks Board 0 Public Works Trust Fund Pre-Construction Loan Program Project Close-Out Report Loan Agreement Number: PW-01-691-PRE-114 CITY OF MARYSVILLE 80 COLUMBIA AVENUE MARYSVILLE, WA. 98270 Name of Chief Executive Officer: Title: SECTION 1: Estimated and Actual Pro'ect Engineering A. $922,978 H Environmental Review B. 52,265 I. Land/ROW Acquisition c. J. Other Fees D. K Contingency E. 200,000 L. Public Involvement/Information F. 24,757 TOTAL PROJECT COST G. $1,200,000 N $ $ SECTION 2: Certification The chief executive officer of the jurisdiction certifies that: • To the best of his/her knowledge, the data provided in this report is true and correct as of the date indicated below; • Records supporting·the information provided in this report are on file and will be made available by the jurisdiction upon request; and • There are no outstanding liens against this project Signature of Project Engineer or Consultant Date Signature of Chief Executive Officer Date Notary Signature Date WORKSHEET FOR CALCULATING THE FINAL DRAW/MATCH Unlike the first two vouchers, the Public Works Board staff is unable to calculate the amount of the final draw. Two variables essential to the calculation are known only by the jurisdiction, i.e., the actual total eligible project cost and the interest earned on the PWTF funds. The worksheet provided here is designed to assist the jurisdiction in calculating the amount of the final draw. Worksheet: Step 1. Step 2. Step 3. Step 4. Step 5. Step 6. Identify the Actual total eligible project cost. PWTF contract's face amount. Identify the Actual local funds used as match* Identify other funds (federal or state grants)) used for project costs. Balance of eligible project cost (subtract line 4 from line 1). Multiply line 5 by 85%, 90%, or 95% as set defined in the "Disbursement of Loan Proceeds" section in the loan agreement, 1. 2. $1,000,000.00 3. 4. 5. 6. Step 7. Step 8. Step 9. Identify interest earned on PWTF funds. 7. Subtract line 7 from line 6. 8. Enter the lesser of line 2 or line 8 (or a local option of an elective amount less than both line 9. · 2 and line 8). Step 10. Amount drawn from the project's PWTF allocation to date. Step 11. To calculate the final draw amount for the project, subtract line 10 from line 9 Step 12. Percent oflocal share (divide line 3 by the sum of lines 3 & 9). ,, 10. $750,000.00 11. 12. Eligible costs may be considered local share 12 months prior to Loan Agreement Execution Date: 10/30/00 Local Funds Included: • All loans (state, federal, and local) • Locally generated revenue Local Funds Excluded: • Interest earned on PWTF funds • All grants % FORM A19-1A STATE OF WASHINGTON INVOICE VOUCHER . Public Works Board 21011 1h Street Post Office Box 48319 Olympia, Washington 98504-8319 YSNDOR'oR'q"'AIMA!lff warr.ant is lo.be pa a.Ille to CITY OF MARYSVILLE 80 COLUMBIA AVENUE MARYSVILLE, WA. 98270 FEDERAL l.D. NO. OR SOCIAL SECURITY NO. PW-01-691-PRE-114 Total Final Voucher Loan Amount Previous Draws Balance Total Final Voucher PREPARED BY (Fiscal) DATE l.f N~.T«Ul~tlCHi~ 'tfJ,,Vl$Ntl'Plt9JJ.~J~(~l:tt'ff{.' >!; .;#'f!~ii!i' !~I In the absence of a detalled Invoice, submit this form to claim payment or materials, merchandise or services. Show complete detail for each item. Vendor's Certificate: I hereby certify under penalty of perjury that the Items and totals listed 1erein are proper charges for materials, merchandise or services furnished to the State of Washington, and that all goods furnished and/or services rendered have been provided without discrimination because of age, sex, narital status, race, creed, color, national origin, handicap, religlon, or fietnam era or disabled veteran status, By: (Sign in Ink) (Title) (Date) RECEIVED BY DATE RECEIVED $1,000,000.00 $750,000,00 $250,000.00 $ SERVICE AREA APPROVAL DATE DOC DATE CURRENT DOC NO REF DOC NO VENDOR NUMBER VENDOR MESSAGE M SUB TRANS 0 APPN PROGRAM SUB SUB INVOICE GENERAL SUF CODE D FUND INDEX INDEX OBJ OBJ CNTY CITY PROJECT AMOUNT NUMBER LEDGER . APPROVED FOR PAYMENT BY FISCAL DATE WARRANT TOTAL May 16, 2002 Washington State Public Works Board Post Office Box 48319 Olympia, Washington 98504-8319 Mr. Robin Nelson 80 Columbia Avenue Marysville, Washington 98270 Regarding: Amendment to PWTF Loan Agreement PW-01-691-PRE-114 Dear Mr. Nelson: Enclosed are three copies of an amendment to Public Works Trust Fund loan agreement number PW-01-691-PRE-l 14. The amendment extends the repayment term to 20 years. Please have all three copies of the amendment signed and dated by the appropriate authority and return all of them to this office as soon as possible. After the amendments have been approved and signed by the appropriate state authority, a copy will be returned to you for your files. If you have any questions, please call me at (360) 725-5016. Sincerely, (~-'\,__ ~~ Q '"""0 > Mike Woods Program Resources Manager Enclosures Administrative services provided by the Office of Community Development (360) 725-5000 FAX: (360) 664-3029 Web Site: www.pwb.wa.gov January 15, 2001 Washington State Public Works Board Post Office Box 48319 Olympia, Washington 98504-8319 Mr. Robin Nelson 80 Columbia Ave Marysville, Washington 98270 Regarding: Public Works Trust Fund Loan Agreement Number PW-01-691-PRE-114 Wastewater Treatment Plant Upgrade Dear Mr. Nelson; According to our record>, your jurisdiction has or will soon have one or more loans with the Public Works Board. I'm writing to ask for your help in managing the Public Works Assistance Account's funds. First, I'll tell you why we need your help and what we expect to happen as a result of that help. Then I'll describe the help we need. What do we hope to accomplish? Our goal is to increase the amount of money available to local governments by $100 million during the 2001-03 biennium. The reason for this goal is the demand for Board loan funds. The 2001 Legislature appropriated $230 million for the Public Works Trust Fund for fiscal years 2002 and 2003. The total appropriation is split between the Construction Loan Program (85% ), and three other PWTF programs. This was the highest single appropriation the Board had ever received. For fiscal year 2002, the Board received applications requesting over $300 million, and the staffs analysis indicated that over $200 million worth of projects met the Board's financing requirements. The Construction Program historically earmarks. 65 percent of the funds for the first year of the biennium, and 35 percent for the second year. This would have limited the list to $127 million rather than the $206 million approved by the Board. It would have also eliminated 32 projects totaling nearly $80 million from the list. The Board decided to commit all of the Construction Program funds in the first year. The Board made this decision with an expectation of acquiring additional resources for the FY 2003 cycle. Those funds will be generated by the Public Works Assistance Account's cash-balance. The Board, with the approval of the Governor and the Legislature, did the same thing in FY 2001 when it added $93 million worth of projects to its original appropriation. Administrative services provided by the Office of Community Development (360) 725-5000 FAX: (360) 664-3029 Web Site: www.pwb.wa.gov Robin Nelson Page 2 We've spoken with the Office of Financial Management and staff from the capital projects committees of both Houses about our plan to generate a minimum of $100 million for the FY 2003 cycle. We have verified that the account can generate the revenue to support this additional level of commitment, and we have answered many questions from legislative staff about the strategy. What help will we need from our local government partners? First, 1'11 have to familiarize you with a key facet of how the Public Works Trust Fund works. The Board decided early-on that the program would be customer-friendly and would benefit local governments how-ever and when-ever possible. To that end, the disbursement of funds was to occur on a "request for resources" basis rather than reimbursement basis. The schedule for disbursements that has been used for many years is*: • 15 percent at the time the contract is signed; • 75 or 80 percent when there is a notice-to-proceed; and • 5 or 10 percent at close-out. *Please refer to your loan agreement or call your Regional Account Executive for details. Having these pre-determined trigger points allowed local governments to draw down substantial amounts of money well before they needed to pay contractors. It allowed many to deposit the draws in interest-bearing accounts and nse the earnings to cover unexpected costs or to reduce their loans. The Board is not changing its policies regarding this approach to disbnrsing funds. However, we have determined that the speed with which local governments draw their funds has a significant impact on the cash-balance and, by extension, the Board's ability to use the cash balance to assist more local governments. This is where you, as a holder of a current or soon-to-be-approved loan come in to help us. Your help is needed in three ways. First, you will find a form enclosed that asks you to predict the unpredictable, i.e. when will you need to draw funds. We are asking for draw estimates on only those loans with more than $500,000 in funds available for disbursement. Please complete the form and return it in the enclosed return envelope by January 31, 2002. Do the best you can with the information you have available to you. You will not be held to this draw schedule. It is for estimating purposes only. We realize that things change pretty quickly and dramatically in the life of a public works project, and we remain ready to help you at any time. If you prefer, the reporting form is available in Excel format on the Public Works Board website atwww.pwb.wa.gov/forms. It may be e-mailed to me upon completion. Robin Nelson Page 3 The second way you can help us is to pace your draws so that you take only what you expect to need. This means that you are encouraged to make more than the three draws noted above. · Changing your draw schedule is not required; it is encouraged. You do not have to change your contract to make this happen. The pace at which you draw money is still up to you. Our goal is to slow the pace of the draws by about 10 to 15 percent. With about a dozen loans for $10 million each in the FY 2002 list, this will help a great deal. But, it is not only these loans that we'd like to see paced a little differently. The third way you can help is to de-obligate funds that you are certain that you will not need and to do this as soon as possible. By Jetting us know that you will never draw these funds, we are able to obligate them to other projects. Normally, we find this out during the close-out process. This information will help us manage the fund better. It has been a pleasure working with you in the past, and we look forward to working with you in the future. Any assistance you can provide us will allow the Board to maximize the use of its resources and expand its ability to assist additional jurisdictions. Please call me at (360) 725-50 I 0 if you have any questions. I'd welcome the opportunity to explain how all of these factors work together and how important your role is in making the whole system work at its optimum. You can also reach me by e-mail at john.larocgue@pwb.wa.gov. I look forward to hearing from you. If I'm not immediately available to answer your questions, please contact Leslie Hafford, your Regional Account Representative at (360) 725-5007. Sincerely, John LaRocque Executive Director Enclosure Borrower: Project Name: Loan Number Face Amount of Loan: Draw Estimate Form MARYSVILLE WASTEWATER TREATMENT PLANT UPGRADE PW-01-691-PRE-114 $1,000,000.00 Balance Available For Disbursement: (Draws Processed Through 1/14/02) $1,000,000.00 Projected Draw Amount Projected Draw Date Next Draw Subsequent Draw Subsequent Draw Subsequent Draw Subsequent Draw Subsequent Draw Total Future Draws Please return this form by January 31, 2002 to: John LaRocque Executive Director Public Works Board Post Office Box 48319 Olympia, Washington 98504-8319 FAX 360 664-3029 Washington State Public Works Board Post Office Box 48319 Olympia, Washington 98504-8319 Nov.ember 1, 2001 Mr. Robin Nelson City of Marysville 80 Columbia Avenue Marysville, WA 98270 Regarding: Public Works Trust Fund Loan Agreement Number PW-01-691-PRE-114 Dear Mr. Nelson: Enclosed is a fully executed copy of Public Works Trust Fund Loan Agreement Number PW-01-691-PRE-l 14 between the Public Works Board and the Marysville. Please keep this copy with other local records related to your approved Public Works Trust Fund project. If you have any questions please call, Leslie Hafford, your Regional Account Executive, at (360) 725-5007 or you may call me at (360) 725-5004. Sinc_vrely; ~ ~B:u~tz2:%;~2__c:><;=:~ Contracts Manager SB:sb Enclosure J I:\Contracting\Contracting Lettcrs\PWTF Executed LA.dot Administrative services provided by the Office of Community Development (360) 725-5000 fax (360) 664-3029 web site: http://www.crab.v.ia.goV/pwtf Wasb ,;ton State Public Works Board Post Office Box 48319 Olympia, Washington 98504-8319 October 2, 2001 Mr. Robin Nelson City of Marysville 80 Columbia Avenue Marysville, WA 98270 Regarding: PWTF Pre-Construction Loan Agreement Number PW-01-691-PRE-114 Dear Mr. Nelson: Enclosed are the original and two copies of the Public Works Trust Fund Pre- Construction Loan Agreement, PW-01-691-PRE-114, between Marysville and the Public Works Board. The agreement details the terms and conditions that will govern the contract between us, which includes the project's Scope of Work and an Attorney's Certification as formal attachments. Instructions for drawing the loan funds are included, as are the necessary forms for the first draw. The loan agreement specifies that the first 75 percent of the loan may be disbursed within 30 days of the date of execution of this agreement. It is recommended that you submit the first voucher form with the executed agreements and related documents. The face amount of the loan is $1,000,000.00. A change in any element of the loan agreement will require an amendment and may necessitate an adjustment in the loan amount or the interest rate. Please review the terms and conditions of the loan agreement carefully, as well as the attachments. Please note -Section 4.09 must be filled out before the loan can be executed. Also, please provide the account name information in the space provided on page five, Section 4.07. Administrative services provided by the Department of Conununity, Trade and Economic Development (360) 586-4172 FAX: (360) 664-3029 Web Site: www.crab.wa.gov/pwtf Robin Nelson PW-01-691-PRE-114 Page Two When you have obtained the appropriate signatures, including the Attorney's Certification, please return all three of the agreements to the Public Works Board. The Board representative will sign the loan agreements and one fully-executed copy will be returned for your files. If your project involves utility work, you are encouraged to review your applicable comprehensive plan to assure compliance. Under Washington law, some utilities may not engage in constmction unless such work is in compliance with the system's comprehensive plan. Consultation with your in-house legal advisor or your bond counsel may be warranted. The Washington Administrative Code (WAC) 399-30-060(5) requires the loan agreements be signed by you and returned to the Board within 90 calendar days of the date of this letter. Failure to comply with this section may result in your loan offer being withdrawn. We are looking forward to working with you over the course of your successful public works project. If you have any questions about the loan agreement, please call me at (360) 725-5004. You may also call Leslie Hafford, the Regional Account Executive for your area at (360) 725-5007, or by e-mail at Leslie.Hafford@pwb.wa.gov. OCT-02-2001 11:13 PW ADMIN CITY OF MSVL Fax To: Su. '::if'...~ F- Fauc 3~c> ~2'.'. 3oz 9' Pag- Phon9: ~ Ra:: CC: Remarks: 0 Urgent 350 551 5182 P.01 Cify of Marysville . 80 Columbia Avenue Macysv.ille, WA 98270 Phone (360) 651-5100 Fax (360) 651-5182 iJ>~~ ~~e..~ 5 I 01 ::2 Lo/_ r 1 Washington State Public Works Board Post Office Box 48319 Olympia, Washington 98504-8319 August 10, 2001 MR. ROBIN NELSONS MARYSVILLE 80 COLUMBIA A VE MARYSVILLE WA 98270 Dear MR. NELSONS: I am pleased to inform you that the Public Works Board approved your Pre-Construction Loan Request for the WASTEWATER TREATMENT PLANT UPGRADE project. The contract is being prepared and will be sent to you in the near future for execution. I encourage you to review the documents carefully, sign, and return them as soon as possible. If you have any questions about the contract or need additional information please contact your Regional Account Executive LESLIE HAFFORD at (360) 725-5007. Once again, congratulations, and we look forward to working with you on this project. Sincerely, -, _/, , /;/I ( 1' J ,, ___ ,,e£:,/ -r i r:r"'i~-1--~ l~hn ;:~:cque I -- 1nterim Executive Director Administrative services provided by the Oflice of Community Development (360) 725-5000 FAX: (360) 664-3029 Web Site: www.pwb.wa.gov Washington State Public Works Board Post Office Box 48319 Olympia, Washington 98504-8319 June 19, 2001 To: From: Subject: Public Works Trust Fund Loan Applicant ~LaRocque ~ce and Operations Manager Receipt of Your Application I am pleased to inform you that we have received your application for the 2002 Public Works Trust Fund Construction and Pre-Construction Loan programs. The Board received 127 applications requesting $298.2 million in infrastructure funding. There is between $100 million and $13 5 million available for loan funding this cycle. Board staff will review the applications during June and July to determine project eligibility and application scores. At its Regular Meetings scheduled for August 7 and August 21, 2001, the Board will consider the ranked applications and formulate a list of projects to submit to the Legislature for approval. The list willbe officially submitted in late October as part of the Board's Annual Report. The Legislature will consider the Board's recommendation next session, and staff will execute contracts for approved projects by April 2002. I encourage you to check our website frequently at www.pwb.wa.gov for updates on the application review process. If you have any questions, please call your Regional Account Executive, or me at (360) 725-5010 or e-mail: john.larocgue@pwb.wa.gov. JL:ejr l:\Applications\PwrnPwrF Co11structio11\Cvrresponckncell002\receipt 2002 June 19.doc Administrative services provided by the Office of Community Development (360) 725-5000 FAX: (360) 664-3029 Web Site: www.pwb.wa.gov Leslie Hafford From: Sent: To: Subject: SECTION II.doc Kevin Nielsen [KNielsen@ci.marysville.wa.us] Tuesday, June 26, 2001 3:33 PM Leslie.Hafford@pwb.wa.gov Preconstruction Form Here is the preconstruction information you requested. If there is anything else you need please email me at knielsen@marysville.wa.us. Thanks for your help! Kevin 1 ?ublic Works Board Public Works Trust Fund Pre-Construction Loan Program Project Close-Out Report Loan Agreement Number: PW-01-691-PRE-114 NOTE: This report shall serve as a contract AMENDMENT for determining the final loan amount, interest rate, and local share and shall be attached and incorporated into the loan agreement. The report accounts for funds associated with the Public Works Trust Fund Loan Agreement's Scope of Work. Costs outside of the Scope of Work are not.accounted for by this report. CITY OF MARYSVILLE 80 COLUMBIA AVENUE MARYSVILLE, WA. 98270 J ~ / ... • & {y,. ~' () ~f NameofCiefExecutive Officer: Title: NOTE: This document is to certify that the project, as described in the Public Works Trust Fund Loan Agreement's Scope of Work, is complete and has metthe Public Works Trust Fund planning standards. SECTION 1: Estimated and Actual Pro.iect Expenditures by Cost Category. COST CATEGORY ESTIMATED . ACTUAL Engineering A. $922,978 H $ 922,978.00 Environmental Review B. 52,265 I. 52,265.00 Land/ROW Acquisition c. J. Other Fees D. K Contingency E. 200,000 L. 200,000.00 Public Involvement/Information F. 24,757 JV 24,757.00 TOTAL PROJECT COST G. $1,200,000 N $ .. 1, 200 '000. 0( ./ I Return this worksheet with Close-Out Report WORKSHEET FOR CALCULATING THE FINAL DRAW/MATCH Unlike the first two vouchers, the Public Works Board staff is unable to calculate the amount of the final draw. Two variables essential to the calculation are known only by the jurisdiction, i.e., the actual total eligible project cost and the interest earned on the PWTF funds. The worksheet provided here is designed to assist the jurisdiction in calculating the amount of the final draw. Worksheet: Step !. Step 2. Step 3. Step 4. Step 5. Step 6. Step 7. Step 8. Step 9. Identify the Actual total eligible project cost. PWTF contract's face amount. Identify the Actual local fuuds used as match* Identify other funds (federal or state grants)) used for project costs. Balance of eligible project cost (subtract line 4 from line 1). Multiply line 5 by 85%, 90%, or 95% as set defined in the "Disbursement of Loan Proceeds" section in the loan agreement Identify interest earned on PWTF funds. Subtract line 7 from line 6. Enter the lesser of line 2 or line 8 (or a local option of an elective amount less than both line 2 and line 8). Step 10. Amount drawn from the project's PWTF allocation to date. Step 11. To calculate the final draw amount for the project, subtract line 10 from line 9 Step 12. Percent oflocal share (divide line 3 by the sum oflines 3 & 9). I *Eligible Costs . I Eligible costs may be considered local share 12 months prior to Loan Agreement Execution Date: Local Funds Included: • All loans (state, federal, and local) • Locally _generated revenue Local Funds Excluded: • Interest earned on PWTF funds • All grants !. 1, 200, 000. 00 2. $1,000,000.00 3. 200,000.0G- 4. .00 5· 1,200,000.00 I 85% I 6· 1,020,000.00 7. 1,094.00 8. 1,018,906.00 9. 1,000,000.00 10. $750,000.00 l l. 250, 000. 00 12. 16 % . • . ... 10/30/00 SECTION 2: Certification The chief executive officer of the jurisdiction certifies that: • To the best of his/her lmowledge, the data provided in this report is true and correct as of the date indicated below; • Records supporting the information provided in this report are on file and will be made available by the jurisdiction upon request; and • There are no outstanding liens against this project Date Date otary Pub ·c State of Washington LILLIE LEIN MY COMMISSION EXPIRES Jul 1 2005 ~ ~ ~ ~5 rrz:; :r~~ )b) ~l[l)ll,lM!I:: 11\YQiLc:lfil:i?l IBJQi~lfil~ TRANSMITTAL LETT m ~~A:~ ~~)'.:: W: ro PROJECT: DATE: To: City of Marysville Waste Water Treatment Plant August 5, 2002 Leslie Hafford Washington State Public Works Board P.O. Box 48319 w [OJ fol If, U~ W llJ )('J )!\ ~ llJ g J& JR(~ Olympia, WA 98504-8319 ATTENTIO Leslie Hafford I am sending the following via: v' Attached Under Separate Cover v' VS mail Document status: Preliminary v' Final Number of Pages per set 1 1 Facsimile v' Original Copy Notice To Proceed Bio These are transmitted as checked below: As requested v' For your use Remarks: For review and comment Hand Carrier Confidential Other Description Solids Caicos Corporation No exception taken Subm __ copies for distribution . CITY OF MAR.L SVILLE PUBLIC WORKS D1.-ARTMENT ENGINEERING DMSION 'l ,, .. , , I •' "'•"'·· ••• ~~-!~ :1 . t ' ' ! ; I ' : I I ~ I \ ' l : ' I ~ I ~' " l ' ' ••• To: Caicos Corp. Project Name: Biosolids Removal Description ofW ork : Removal of 4300 Dry Tons ofBiosolid; Amount ofContract:_ $888,273.23 including sales tax· You are hereby notified to commence work on the referenced contract on or before July 25. 2002 · • and shall fully complete all work of said contract within 60 days thereafter. The completion date for all work is therefore S~teinber 22. 2002 The contract provides for an assessment of liquidated damages fOr each consecutive day after the above established completion date that the work remains incomplete. The method to calculate liquidated damages is set forth. in the conlract documents. Dated 25th day of July 2002 By.~;:j~~ Title: ~l@uc... kY<;(J+.? S'" u?"J: ACCEPTANCE OF NOTICE Date: TOTRL P.02 "' '--' '-'L. . 1--' , <....Ul:.J<.... ~:; 0:::... " ..:J.,:J/ I' I l.,H.ll.,U.:J L.Ji-MSUL PW City of Marysville Fax To: DaveBeny From: Kevin Niel>en Fax: 206-842-9687 Pages: 2 Phone: 206-842-9678 Date: 725/2002 Re: BioSolids Notice to Proceed CC: D Urgent 0 For Review x Please Comment x Please Reply · D Please Recycle Dave, Please find to follow your NOTICE TO PROCEED for the 2002 Bio Solids removal project. Your signature is ncede.d and then fux it back to our office@360.651-51821fyou should have any questions please call. Sincerely Yvonne Klassen Engineering Project Assistant Created on 07126/02 9:05 AMG:\USEF!S\Y110nne~ S0004 BloSolldG Remowl Caicos Corp\Fax Notice to Prcceed.doc Pa,g• 1 ril 12510!2. INCORPORATED 1891 August2, 2002 Leslie Hafford Public Works Board 210 11 1h Avenue PO Box 48319 Olympia, WA 98504-8319 Dear Ms. Hafford: City Clerk Enclosed please find the fully executed final voucher and close-out report for Public Works Trust Fund Pre-Construction Loan No. PW-01-691-PRE-114. If you have any questions or need additional information, please contact Project Manager Kevin Nielsen at 360-651-5100. Sincerely, Gerry Becker City Clerk GB/II Enclosure cc: Kevin Nielsen, Project Manager fo!~~~!l\11)_~~ ~1 AUG O 5 2002 10 ~1))J!Jl,lLRC il\IQ!ili\~@ IB\QiliH\\~ 4822 Grove Street+ Marysville, Washington+ 98270 + (360) 651-5000 +FAX (360) 651-5033 STATE OF WASHINGTON •' ' ·' '' AGENCY u.si= ONL y ' ·' FORM A19-1A AGENCY NO. , 1 CONTRACT NO. OR "GA AUTH. NO. INVOICE VOUCHER 103 I PW-01-691-PRE-114 .J==U c==-:.u f--=-.,.,,.-=-~-,.......:A_.:.:G=.:E:::Nc:_C=-· Y::..., _:_:N::...A:::M.:.:E=---~--'---"----ffij] ,~,-Nca~...-R-U_C_1'._10_N_S_TO-V:-EN_D_O~R~·~O~R-C~L~A~IM~A~N~T-.:-, --~ Public Works Board J In ti@ absence of a detailed lnvoice, submit this form to claim payment 210 11th Street C'-J Jr materials, merchandise or services. Show complete detail for each item. Post Office Box 48319 g 11",QI VeNlor's Certificate: Olympia, Washington 98504~8319 (""--J LO I hefeby certify under penalty of perjury that the items and totals listed . VENDOR OR CLAIMANT (warrant is to .b<i pa o 1ereirf®'e proper charges for materials, merchandise or services furnished to t~State of Washington, and that all goods furnished and/or services CITY OF MARYSVILLE 80 COLUMBIA AVENUE MARYSVILLE, WA. 98270 FEDERAL l.D. NO. OR SOCIAL SECURITY NO. 91-6001459 <;~\-~ 1.--C:<, ~ _.( Robin D. Nelson P.E. r IO(j) fEe;)'"(CE DATE RECEIVED -Y/ '"6,/ (J L DATE ' DESCRIPTION QUANTITY 'UNIT PRICE AMOUNT ' ', '' ,, ', PW-01-691-PRE-114 i'.'.:11-lu c:A \ t drf\SE,, Total Final Voucher '?Ylt:),Od-! ~ Loan Amount ' $1,000,000.00 Previous Draws $750,000.00 Balance $250,000.00 . Total Final Voucher (f\ ?:r \-::Jr ff;) $ 250,000.00 . ' - PREPARED BY (Fiscal) .!1, /l{A-' -DATE f,fk~EftAARn 0\ hL ///hr-.J/ DATE ) g;f C'-Z! az__J r tJJ /~ "t' /'.l /[/ DOC DATE CURRENT DOC J!P REP"DOC NO /. ; VE~DOR N ME E~/ ./ 'bEt,~Sjfj:.MESSAGE i.£ c:2 3 q ., 7~ tT r6J I PR.,c /l M SUB 5wVt 70~ tf3 ;;J -"I TRANS 0 APPN PROGRAM SUB SUB INVOICE GENERAL SUF CODE D FUND INDEX INDEX OBJ OBJ CNTY CITY PROJECT AMOUNT NUMBER LEDGER ~.,,, (Jc:' fu"rr oJ rJ(l.._ C) f'(l \ ~ <e-0 6 >.!"{../ t:;/)/ LQ//Jl/ ft:,S""~ /-5 i'1 APP.Y:2,ED FBR PA~ "T BY FfJ?AL DA-rg I 9 //' ,__,, WARRANT TOTAL -· -,,;J. £>0, {)Oi!J. «) --A ' , I , I ' .,; ... FORM A19-1A STATE OF WASHINGTON . i~i::~i~~ii~1~~1~::ief:~i~~:~:.;~!;;:m:1;:it,'~'. INVOICE VOUCHER 1030 I 001 . ATTN: Public Works Board Post Office Box 48319 Olympia, Washington .98504-8319 VENDORl:oRi.CIY>.IMANTi wai#ntrlslo be MARYSVILLE 80 COLUMBIA A VE MARYSVILLE , WA98270 FEDERAL tD. NO. OR SOCIAL SECURl1Y NO. 91-6001459 I tN::>.1l~f!Q[J<Jff§)iT.O;iVEfl.[)OR;OgJ.Ci:p..fAfJ1.fJT!im'Y··,'> =.<J In the absence of.3. detailed invoice, submit this form to daim ·payment: for materials, merchandise or services. Show a:xnplete detail for each item. · Vendor's Certificate: I hereby certify under penalty of perjury that the items and totals listed to th~ State of Washington: and that au good~ fum.ished and/Or services rendered have been provided without discrimination because of age, sex. marital status, race, creed, color, national ori , handicap, religion; or Vietnam era or disabled veteran status. BY . DATE RECENEO . ':'DESCRIPTION \i'tOOANTmY'' ·, . UNITPRICE Public Works Trust Fund Loan Number PW-01-691-PRE-114 LOAN AMOUNT ................................................................... . $1,000,000.00 $750,000.00 $250,000.00 FIRST DRAW BALANCE TOTAL FIRST DRAW PREPARED BY (FISC3~~ n~ - DOC DATE cu7i;~~D.£_CP-:O M TRANS o· APPN PROGRAM SUB SUF CODE D FUND INDEX INDEX OBJ .::l :J '.2. O)lr l§f-'t". ('., ')r 00 AJA 81'1 . APPRO~OR. ey~EITT,EX;F~CAL ~ J Approved CTEO Fann A19-1A (10/15/95) $750,000.00 ,, DATE j _ 1sE~I'? <//! 1//,n ; }"''}': p v r:_v DATE 5 / 2 '//o-z......-.- RCfDO<tNO /O~?d. VE~~:Yt ~Ef!'f.57-00 'f7tNDOR MESSAGE /J/ r-. /{wi.,, ·~ - SUB SUB INVOICE GENERAL OBJ CNTY CITY PROJECT . AMOUNT NUMBER LEDGER '1Po1 '7 \'o. '<ru 5()/69///'f 10s,;z.. . DA~E b g !tJ 7--WARRANT TOTAL 75'0, OO[). ~CJ I I . I< FORM A19-1A STATE OF WAS. jTQN INVOICE VOUCHER .AGENCY NAME rTN: Public Works Board Post Office Box 48319 Olympia, Washington .98504-8319 ENDOR;OR\Cl:AlMANT•(warrantls to .. be oavable to) ,. MARYSVILLE 80. COLUMBIA A VE MARYSVILLE , WA 98270 ~OERAL l.D. NO. OR SOCIAL SECURITY NO. 11NsrRu.r:;norvsrowENooR0RcLA1MANr: ;::m;, u <I In the absence of.a detailed invoice, submit this form to daim payi:nent for materials, merchandise or services. Show complete detail for each item. Vendor's Certificate: I hereby certify under penalty of perjury that the items and totals listed to the State of Washington, and that all g s fUmished andlor services rendered have been provided 'Nithout scrimination becaus·e of age, sex, marital status, race, creed, color, na · nal orii(in, handicap, religion, or Vietnam era or disabled veteran s. / """- By: /~UY (Sign in ink) Mav 17 2002 / (11~e) / (Date) DATE RECENED \. \ J / DATE·•;·<!''.'·' · ..... ·.A w:l>~,'\~ESCRIPTION' \ ' /' ·+'f.I ,.,. ·ouANTITY 1· UNIT PRICE I •·'!'''·'' ·, '"'"'" .,.. ! . ·--:1.·' .. · ·,~,'~\ . : AMOUNT' $1,000,000.00 .oo / 'REPARED BY (Flscal) / DATE I SERVICE AREA APPROVAL DATE JOG DATE CURRENT DOC NO REF DOC NO VENDOR NUMBER VENDOR MESSAGE M SUB ' TRANS o· APPN PROGRAM SUB SUB SUF CODE D FUND INDEX INDEX OBJ OBJ CNTY CITY PROJECT . . APPl'<OVED FOR PAYMENT BY FISCAL DATE Approved CTED Form A1S-1A (10115195) AMOUNT · WARRANT TOTAL INVOICE NUMBER GENERAL LEDGER Public Works Trust Fund Instructions for Completing Vouchers Pre-Construction Loans Section 4.03 of the Loan Agreement describes the two points at which portions of your loan will be disbursed to you: 1. Seventy-five (75%) of the loan may be disbursed upon execution of the loan agreement; 2. The final portion of the loan may be disbursed upon project close-out. Attached is an invoice voucher for the first draw. This voucher reflects 75% of the approved loan. It should be signed and dated by the individual authorized to sign vouchers by your jurisdiction. Send the voucher to the Public Works Board at the address on the voucher. Be sure to keep a copy of the voucher for your records. You should receive your funds approximately 14 days from the date you mailed the voucher to the Board. FORM. A19-1A STATE OF WASHINGTON INVOICE VOUCHER ATTN: Public Works Board Post Office Box 48319 Olympia, Washington .98504-8319 VENDOR~OR\C.i!AlMANTilwait'antilslobe. o:i\(aple<to\< MARYSVILLE 80 COLUMBIA A VE MARYSVILLE , WA98270 . l.tN!;T;Rl!G:HO.ff§i<TQ;\VEl'f[)OR;ORJ.C~fMJV'fTf P:!Nt'<liW! :·:·.4 In the absence of.3 detailed invoice, submit this form to daim ·payment for materials, merchandise or serVices. Show complete detail for eadl item. · Vendor's Certificate: I hereby certify under penalty of perjury that the items and totals listed to the State of Washington: and thai au goods fum"ished and/Or services rendered have been provided witho.ut discrimination because of age, sex. marital status, race, creed, color, national origin, handicap, religion; or Vietnam era or disabled veteran status. By: (Sign in ink) (TIHe) (Date) FEDE.fW_ 1.D. NO. OR SOCIAL SE;CURITY NO. I RECEWEDBY I DATE RECEIVED PREPARED BY (F"iscal) DOC DATE M TRANS 0 SUF CODE D FUND . ···•.f'm.ESCRIPTION VOUCHER#! Public Works Trust Fund Loan Number PW-01-691-PRE-114 LOAN AMOUNT .................................................................. .. FIRST DRAW BALANCE TOTAL FIRST DRAW ·DATE CURRENT DOC NO REF DOC NO. SUB APPN PROGRAM SUB SUB SERVfCE AREA APPROVAL VENDOR NUMBER. $1,000,000.00 $750,000.00 $250,000.00 $750,000.00 DATE VENDOR MESSAGE INVOICE INDEX INDEX OBJ OBJ CNTY CITY . PROJECT . AMOUNT NUMBER . . APPROVED FOR PAYMENT BY FISCAL DATE WARRANTTOTAL Approved CTED Form A1G-1A (10115195) GENERAL LEDGER Total Need score: 32 Total Effort score: 54 Total score: 86 Evaluator: ! CAG Name of Jurlsdiction:---dty of Marysville ----- - ---------------------- SEWER -WWTP Upgrade and expansion Application Need Section IV-A: Maximum of 6 Points Bridge/Road Water Sanitary Sewer Storm Sewer Solid Waste Principal Arterial 6 Supply or Source 6 Treatment 6 Storage Detention 6 Reduction or 6 Primary Recycle Minor Arterial 5 Supply or Source 5 Interceptor 5 Treatment 5 Remedial 5 Secondary Major Collector 4 Treatment 4 Pump/Lift 4 Interceptor 4 Final Disposal 4 Minor Collector 3 Storage 3 Collector 3 Collector 3 Transfer 3 Local I Other I Transmission 2 Other 1 Other 1 Other 1 Distribution 1 Other 1 Comments: Existing Documented -Clear -People Performance Environment Growth/ Potential Undocumented Unclear Economy Existing Documented Clear 22 19 16 12 Existing Documented Unclear 19 17 14 11 Existing Undocumented Clear 14 12 10 7 Existing Undocumented Unclear 11 10 8 6 Potential Documented Clear 17 14 12 9 Potential Documented Unclear 14 12 10 8 Potential Undocumented Clear 9 7 6 4 Potential Undocumented Unclear 6 5 4 3 No Answer 0 0 0 0 Score: 14 Comments: Project will address new NPDES permit limits, and capacity problems. Duringh:lghnver flow, city discharges into Steamboat Slough. During low flow, project will send effluent to city of Everett, and combined flow of Marysville, and Everett, will be conveyed to a new joint-use outfall in Port Gardner Bay. This will enable them to bypass the Snohomish River system altogether during a large part of the year. Currently, the city of Marysville is not able to meet the new NPDES limits. In addition, the system will need to be upgraded to meet the increasing flows and organic loads resulting from growth. Project will have a positive impact on the ESA and the Snohomish river. -------------------------------------- 0 points Fixes all the need items that it could with the fonds available 6 ix es some but not all of the items 3 points ixes none of the items 0 estorative Points (maximum of 3 points): Score: 12 Comments: !Changes made to system in past five years ( 1996-2001) that improve the system's reliability and or performance. !Changes made to system in next five years (2001-2006) that will maintain or improve the system's reliability and performance. Maximum of 8 points. estorative: If the system has not completed appropriate improvements, why? Activities Past Item-statement YIN Date Impact 1 YIN 1 Score 1 I Renewal and Replacement Program Yes 1998 Cost benefits, avoided claims I Yes 13 2 I Pretreatment Program Yes 1996 Reduction in grease build-up in collections system l Yes 13 3 I Computer generated recurring maintenance pro gram Yes 1996 Extends the life of our equipment I Yes 13 4 I Sanitary Sewer Flushing Program Yes 1996 Claims for sewer backup decreased I Yes 13 Total Past M & 0 Score I L Comments: Activities Future Item-statement YIN Date Impact 1 I Expansion of pretreatment program Yes 2002 Reduced loading to treatment facility Yes 2 I Expansion of our Sanitary Sewer Flushing Program Yes Every2 Fewer blockage/backups in their collection system, Yes years fewer claims for damages 3 I Enhancement of our outreach program (A&F?) Yes I 2002 No this is whatit does I No 4 I Mainenenace program I job standards (A&F?) Yes I 2001 Extends the life of the system I Yes 12 -4 Total Future M & 0 Score I 7 Comments: #1, 2, are expansions of past activities? Total M & 0 Score I 19 1) Describe distinct modifications made to the system in the past five years (1996-2001) that improved its financial or administrative status. ) Describe distinct modifications made to the system in the next five years (2001-2006) that will maintain or improve its financial or administrative status. ~ Maximur f 8 points. estorative: If the system has not completed appropriate improvements, why? Activities Past Item-statement YIN Date Impact. YIN Score Comprehensive sanitary sewerage plan Yes 1997 Comply with DOE requirements Yes 3 2 I Lab Certification and Quality Control Program Yes I 1996 Savings of $25,000 annually for the city by being I Yes I " . able to run their own testing 3 I Community Outreach program, new staff, customer service Yes I 2000 I As a result, complaints are tracked on a map, and I Yes rep, used in maintenance Yes I 1998 I Reduce# of bills being thrown out, cost savings in I Yes 13 4 I Utility Bill re-formate postal expenses Total Past A & F Score I 12 Comments: Activities Future Item-statement YIN Date Impact I YIN I Score Comp Sanitary Sewer Plan Update Yes 2003 No that is what it does No 2 I Utility Rate study Yes Annually No that is what it does No 3 I Energy Audit Program Yes 2002 Takes advantage of cost savings Yes 4 I Financial Management Software Yes No That is what it does No 4 1 Total Future A & F Score I 6 Comments: TotalA&FScore I 18 1) Describe distinct capital improvement micfefo the system in the past five years (1996-2001) that maintained, improved, or expanded the system. 12 points. ) Describe distinct capital improvements made to the system in the next five years (2001-2006) that will maintain, improve, or expand the system .. -Maximum of Is points. estorative: If the system has not completed appropriate improvements, or is not planning to, why? Activities Past Item-statement YIN Date Impact YIN Score 1 Allen Creek Lift Station Elimination Yes 1997 Reduction in routine Maintenance (5 hrs a week) Yes 3 2 I LID No 69 Sanitary Sewer Improvements Yes 1998 No No 2 3 I 88" Street Lift Station Yes 1998 Increased revenue from co=ercial development, Yes 13 and collected $500,000 in utility fees -growth pay for growth 4 I Sunnyside Trunk D Phase I Improvements I Yes 11998 No I No 12 Total Past Capital Improvement Score I l O Co=ents: Activities Future Item-statement YIN I Date Impact 1 I WWTP Expansion and Effluent Transfer (this project) Yes I 2002 Effluent from Marysville and a portion of Everett I Yes will not go into Snohomish river 2 I Trunk F to A Intertie Yes I 2001 I Reduc.ed man hours, $900,000 savings by not I Yes replacing 3 I 51" Street Lift Station Rehab Yes 2002 No No 4 I Trunk D Phase II Expansion Yes 2001 No No 4 2 Total Future Capital Improvement Score I 7 Co=ents: Total Capital Improvement Score I 17 PWTF Pre-Construction & Construction Application Forms SECTION I: APPLICANT INFORMATION iPlease indicate which program you are applying for: I PRE-CONSTRUCTION II~li CONSTRUCTiillCJfiSF~f: Population within Jurisdiction: Federal faxln#: 1;-ci!Y: .............................................. !!11 . . . - Project Title: . .----------.--------,--,---,---- Project Description: i Congressional District: Primary system affected by this project. (Check only one) Contact Person: '.!ailing Address: Telephone: Did a consultant prepare this application: Legislative District:·-----· Total Project Cost: ··-------------.......................... .. PWTF Loan Request: Useful life of the improvement is: -~e~rs: Are other focal governments servedbythis projectfil1<l7or arepart!C!pating in the funding of the project? ..... In "YEs";idenilfy them and describeihenatureofiile!r contribuiiOns to the project, including but not limit~dto:-pl;~J1"i~g, ... construction, financing, maintenance, right-of-way acquisition, or operation of the project. (Required activities such as permit review/approval, regulatory oversight, etc., are not considered as a contribution to the project.) r· Hasthe-lOcal government experienced severe fiscal distress resulting from a 1 .. !l.".'.1:1ral disaster or em.ergency public_w_o_r_k_s_n_e_e_ds_? ________ _ .......... -------------------------------_,_ ___________ _ If "Yes," describe the event, when it occurred, and the fiscal distress it caused . ....... -----~--~---~~---! Does this project acquire, expand, improve, or renovate a public water system(s) i that is in violation of health and safety standards or does it cover the cost of ' extending service to such a system? C-·-·----·------~-------------------- ' If"Yes," identify the system(s) and describe the situation. j I SECTION II: PROJECT FUNDING AND SCHEDULE A. Estimated Project Costs Engineering Environmental Review Land/ROW Acquisition B. Public Involvement/Information Construction Other Fees Contingency ( 20 %) TOTAL ESTIMATED COSTS How were these estimates made? When were these estimates made? HB 1204 passed during the 1999 Legislative session, requiring funding agencies to report on the costs of enviromnental projects. An environmental project is defined as: "Land acquisition, facility construction, or other activity providing environmental protections, restoration, enhancement, or compensatory mitigation undertaken by state agencies or funded by .. sta_tefi11a_ncia_la_ssista11cep~()g!(llllS.,, Does any component of this project meetthis definition? If "YES", then approximately how much of the proceeds from this 10~11, if a"Yar4~4, "Yi!! h,~ use4 tofu11d th,e e11yiro11111~11tal~()11lPO!l~llts7 Proposed Project Schedule: (Indicate the month and year when the activities were or will be completed) Environmental Review Permits Obtained Land/ROW Acquisition Preparation of Bid Documents Award Construction Contract Start Construction Complete Construction Project in Use C. Project Funding ----i----------------------------- i1>:>><+,_<:::<,-7;c;y ---, <-:'\<~;-<:_:\<:-::_:;-:t;?£:~~-:-;;;n:::<t- This PWTF Request I Public Works Board ! 1,000,000 Proposed ! Other Loan # 1 . .. . . .. ······· 1 ... . . . . .. .. . ... .. . .. .. . ... ........ ......... .. prt;)()()!1Strll(;li()!1 I Othe~~oanih m ==~························· H···································I·······························+ .... ···································.······· !···················································································· ~ow -;.:,'i:.-.... :.-._:::·:::.-.:.::.~:.,,_;.:;,"'~:.: ---0-''il\F:-P--·:CC':_;·':-f:>;};'-/:0·'->:,:"('A/;'·'· ----.y::--·<:<:/iii'j:>!V+:!i?>:./'.'.l-t;:>;fS,±Jl:i:'l;'i:Gl&.28Y':'>:.•Ji:fc:<·-·::cxf;,;J;_:~s<i<:<<>>-<hN<·+'.'"'d;>;~~oo:z::.c I Capital 200,000 In-hand i preconstruction ! ! Source #2 ······~···················;;" . ······································!·· .................................... ; Source * Status Funds are either in-hand, proposed, or planned. • Funds are in-hand if a formal notice of approval or contract for the funds is in place with the funding source. Local revenue must be in an approved budget to be considered in-hand. • Funds are proposed if a formal application has been submitted to a funding source, and the funding soi considers the application or funding request as having been submitted. • Funds are planned if they are found in a formally adopted Capital Improvement Plan or its equivalent. **Agreement date Enter the date the agreement was signed or is expected to be signed. " SECTION II: PROJECT FUNDING AND SCHEDULE A. Estimated Project Costs Engineering Environmental Review Land/ROW Acquisition Public Involvement/Information Construction Other Fees (constrn inspect&mgmt) Contingency ( 20% ) TOTAL ESTIMATED COSTS How were these estimates made? When were these estimates made? HB 1204 passed during the 1999 Legislative session, requiring f ndi agencies to report on the costs of environmental projects. An environmental project-is define/ as: "Land acquisition, facility co11structio11, or other activity /oviding env 011me11tal protections, restoration, enltanceme11t, or compe11satory mitigation utidertaken by st e agencies or fimded by state financial assistance progra111s." /1 Does any component of this project meei-ifl!Sdefinitioj(? ... I If"YES", then approximately how much of the pro eds from this loan, if_a\'{ar~e~,,villbe l)Se~to __ fl!ll~ t]lee!':'{it()ll e11t~l~()!11l'()llellts? B. Propased Project Schedule: (Indicate the mont ,'.~.:J:::;~:jili'2£:~JfiilY~~\}i$!4JE1i;;t Engineering Report Environmental Review Permits Obtained Land/ROW Acquisition Preparation of Bid Documents Award Construction Contract Start Construction Complete Construction Project in Use C. Project Funding 1~ii1~~i:Fii1J' '""""'''1~"~"1f'f~c'"'1 ' Grant #1 Grant#2 Grant #3 Total Grants ;fu~i This PWTF Request Other Loan # 1 Other Loan #2 Total Loans Source #2 Source #3 Total Local Revenue Other Funds PWTF Phase $11,000,000 Planned (next cycle) $22,000,000 Revenue Bonds $17,263,000 planned $18,263,000 * Status Funds are either in-hand, proposed, or planned. • Funds are in-hand if a formal notice of approval or contract for the funds is in place with the funding source. Local revenue must be in an approved budget to be considered in-hand. • Funds are proposed if a formal application has been submitted to a funding source, and the funding source considers the application or funding request as having been submitted. • Funds are planned if they are found in a formally adopted Capital Improvement Plan or its equivalent. **Agreement date Enter the date the agreement was signed or is expected to be signed. The Public Works Board staff will calculate local match. Grants are not considered part of local match. ,, D. Constraints Describe any constraints on the sources listed under Question C. Project Funding. (Examples might include voter approval, receipt of federal grant, or time/match limitations associated with a particular funding source.) None. :.; ' SECTION III: ELIGIBILITY REQUIREMENTS A. Does the projectlncll!cie repair andlorrepJacemeniofslci"e-servicesewer··· connec;!~ons on Eriva_tely owned !lro!lerty: ... .. ·-__ B. For counties, cities, and towns only: Has your jurisdiction adopted the local one-quarter of one percent (.25%) Real Estate Excise Tax (REET) on the sale of real property as permitted by RCW . ".... . ...... -· . . ." " _, " "-' .. " . _, " "." "•-' -'•" ... " ... " -"···---. " ... -.. ". "" ...... " .. ·"·-------------------·"···-" .................. ·--· --·" If the answer is "NO", stop here and contact the Public Works Board, at (360) 725-5000 ---------------------~-----·· ··------- . ... ••"-' -·---"-----------"-----··-"·------"·" ....... -·-··----------------"-' _, "." "." .. "." "." .. ·"·"·· ........ " .... " . "•-' ... " .. " " ··"·"· " . _, ."""""-' " ··---___ ,. __________ _ C. For J uris_dictio 11s :i'l'11llli11.~_l11l~er t~~ (;Ea.1Vt~.1V1a11:i~e111e11t ~ct .... ··--·········· In order to be eligible for funding, all counties, cities, and towns planning under the Growth Management Act (GMA) must have adopted their Comprehensive Plan and Development Regulations by the Act's designated deadlines or the PWTF application deadline, whichever is later (RCW 36.70A.040). This also includes having no Findings of Non-Compliance or Invalidity Orders pending. For questions regarding your GMA status, contact the Growth Management Unit at (360) 725- 3045. (Public Works Board Staff will be verifying GMA conformance) D. For Jurisdictions Not Planning under tlie'G'ro;i!J. iVfanagement Act I. Check all systems owned by the jurisdiction. 3. Do the Capital Facilities Plans meetall requirements found below? Ifyou ltave answered "NO", to questions D Stop here and contact the Public Works Board, at Planning requirements for jurisdictions not planning under the Growth Management Act a. The JUnsd1ction has adopted plans for all ofthe systems it owns. b. The plans provide an inventory of major system components, show their locations and capabilities, and assess the overall capital needs for the systems. The plans identify, prioritize, and coordinate major capital improvement projects over a six-year period. c. The plans estimate capital project costs and/or identify financing alternatives for each project identified. d. · The plans have been updated in the last six (6) years. (The Board recommends at least once every two years.) e. The planning process provides opportunity for early and continuous public participation. f. The plans must be consistent with and be elements of the Comprehensive Plan formally adopted by the governing body of the local jurisdiction. g. The plans must be consistent with the Comprehensive Plans of neighboring jurisdictions. h. The plans must forecast future needs for the capital facilities; show location and capabilities of expanded or new capital facilities. ----------------·--------- The Board requires that special purpose districts show. consistency with the Comprehensive Land Use Plans ofthejurisdiction(s) in which they provide service. E. For special purpos_e_dis-trki:.s within counties, cities,-or to,vnsTnvolved in Growth Management planning. The LegislaturerequiresthePubiicWorkSBoardia''calleci'iize]olia>vingdaiG.(This data has no__,., ... impactonlhf!,eJig_ibilit)! or rating of this application.) 1. Have the time lines for adopting its Comprehensive Plan been met by the jurisciJc!io11_i_n \Vhich thisdistrict operates? 2. · Ft ave il1eilffien;;;,;; i'or a<lailililgi!.5ne:YeiaiJffieil1'ReguE!iOils1Jeen ·;:;;;;1·· by the jurisdiction in whichthisdistricl()perates? 3. Has the Growih Hearing Board issued a Finding of Non-Compliance or an Invalidity Order against the jurisdiction in which the district . operates? If"YES", when is this expected to be resolved? SECTION IV: PROJECT NEED (Total Points for Need= 40) * Inclusion of adult and juvenile correction and detention facilities depends on approval of the Legislature and Governor. '•:t· 'I ' ~. In response to the more stringent effluent quality limits stated in its new interimNPDES permit, the City ofMarysville has begun to implement a Treatment Plant and Conveyance system upgrade that will result in achieving the new permit limits and address capacity problems at the wastewater treatment plant. The City is seeking funding for the Treatment plant upgrades for this biennium and will apply for funding of a new conveyance system upgrades to the City of Everett in the following biennium. The City intends to continue discharging to Steamboat Slough during periods of higher river flow (more dilution) to minimize overall system operating costs. However, during periods oflow river flow, the City will construct and upgrade its effluent pump station and new effluent force main to the City of Everett wastewater treatment plant. From there, the Marysville flow will be combined with flow from Everett and conveyed to a new joint-use outfall in Port Gardner Bay, owned by the City of Everett and Kimberly Clark Corp. The Everett/Kimberly Clark conveyance project is cLtrrently under design. By this means, the Marysville (and Everett) effluent will bypass the Snohomish River system altogether during a large part of the year. This will have a significant positive impact on the entire Snohomish River ecosystem. I. The City of Marysville discharges treated wastewater effluent to Steamboat Slough, a branch to the Snohomish River estuary. The effluent is required to meet the water quality limits from the revised 2000 NPDES permit that was recently issued by Ecology based on the results of a TMDL study on the Snohomish River. With the existing plant, the city is unable to meet the following revised permit limits: • Ammonia: This is a new parameter in the permit. Recorded 1999 data indicates ammonia concentrations as high as 850 pounds per day (ppd) would have exceeded the low-period maximum daily limits of 403 ppd for 8 out of the 12 months. • CBOD: The plant violated its 25 mg/L monthly CBOD permit limit in July of 1998, January and May of 1999, with CBOD limits ranging from 27-30 mg/L. • TSS: The 30 mg/L effluent TSS limit was violated in July of 1998 with concentrations reaching 40 mg/L. TSS concentration limits were reached three times within the one year of98-99. • Fecal Coliform Count: Fecal coliform limits do not change under the revised permit. The plant has recorded effluent fecal coliform concentrations of250/100 ml (monthly average), exceeding the monthly limit. Required modifications to the existing lagoon systems may result in increases to the fecal coliform counts in the disinfection process. • Chlorine residual: The previous permit did not establish limits for chlorine residual. Historical data reveals effluent chlorine residuals almost reach the new interim and final limits, with concentrations ranging between .07 mg/L (monthly average) to .18 mg/L (monthly maximum) The existing chlorine disinfection system will be upgraded to meet peak flow conditions. Conversion to an UV disinfection system is also anticipated, pending results of a pilot test program to be conducted this year. The interim and final NPDES permit limits for Steamboat Slough and the permit limit violations necessitate significant treatment plant upgrades to meet the regulations and provide adequate treatment capacity at the plant. 2. The treatment plant upgrades need to accommodate the increasing flows and organic loads resulting from the growing population in the City. The City of Marysville has experienced significant growth in the last two decades. The Washington State 1990 Growth Management Act (GMA) established the Marysville Urban Growth Area (UGA), which identifies areas that are serviced by the City's sewer system. Two new areas have been identified as areas that could be served by the City's sewer system; the eastern portion of the Tulalip Reservation and the southern portion of the City of Arlington, near the airport. Currently, the City's wastewater facility provides secondary treatment and has a maximum- month design capacity of 6.1 million gallons per day (mgd). The City's wastewater treatment facility currently serves a population of about 27,300. Projections have the population doubling in the next 20 years to more than 59,000 residents (1999, Snohomish County Growth Monitoring Report). The City completed a Wastewater Capital Facilities Plan (Tt/K.CM 2001 ), which included a capacity evaluation of the existing wastewater treatment system and identified that the head works, aerated lagoons, effluent filters, chlorine contact tank and effluent pump station have inadequate capacity to handle the City's near-term wastewater needs and through year 2020. The existing treatment plant and proposed upgrades will determine the water quality of plant effluent that is discharged and affects the residents, system operation and expenses, and environment. • 3. Impact on Residents: Upgrades to the plant will accommodate the increase in flows and loads due to the growing population . Without the increased capacity, the plant will be unable to serve new connections to the sewer system. • 4. System operation and expense impacts: Currently, collected data indicates the plant is reaching its capacity. This results in unit processes being operated at full capacity, reducing equipment useful life and increasing operating costs. Increasing loads require for the continuous utilization of the effluent filters, which require additional chemicals and enormous increases in operating costs. The existing lagoon aeration system has insufficient capacity for peak load demands. Furthermore, it is relatively energy-inefficient compared to other aeration systems available. Considerations will be given to upgrade the existing aeration system. • 5. Environment and Endangered species im11a-cts:' With increased flows and loads, permit limits are set to reduce impairment to the waterbodies, which could result in detrimental impacts to the environment and endangered species. Improving the water quality of effluent that is discharged into Steamboat Slough benefits fisheries resources and fish/wildlife habitat. Modeling results indicated a reasonable potential to exceed water quality standards at the Steamboat Slough outfall for ammonia, chlorine, copper and mercury with the 2020 projected flows, which would result in lethal or sub-lethal adverse affects on the sensitive aquatic species if plant capacity is not increased. Listings of endangered species near the site include bald eagle, chinook salmon, and bull trout which are impacted by the quality of the City's wastewater effluent. Projected fecal coliform counts would result in violations that could impact shellfish harvesting in the waterbodies. Ultimately. the City's project will convey its effluent (along with Citv of Everett effluent) to Port Gardner Bay, bypassing the Snohomish River system for a large portion of the year. 6. In addition to the Dilution Model studies, additional studies and reports have been conducted that doct1ment the impacts of the proposed project. The Environmental Assessment (EA) and the State Environmental Protection Agency (SEPA) checklist has been developed to evaluate potential impacts of the project. Related studies also include the 1999 Snohomish County Tomorrow Growth Monitoring Report and the Comprehensive Sanitary Sewerage Plan (Hammond, Collier, Wade, 1997) The project consists of three main elements: Preliminary Design; Final Design and Permitting for the upgrade of the existing Marysville wastewater treatment facility. In this biennium, the City is applying for funding for the proposed treatment upgrades designed to accommodate for unallocated (Tulalip) flows and City growth to 2020, as well as compliance with interim NPDES limits. Preliminary design activities will finalize the unit treatment processes and general configuration of the facilities to be constructed. Recommendations in the Final 2001 Wastewater Capital Facilities Plan will be the basis for guiding this phase of the work. The scope of the preliminary design will include; • An evaluation and recommendations of alternative configurations for a new treatment facility headworks; • Finalizing process design criteria, including confirmation and updating, if necessary, of the projected flow and pollutant loading on the existing wastewater treatment facility • Analyze electrical and generator improvements and develop a conceptual plan for the process instrumentation and control and electrical systems {_ • ) Improvements and expansion of the aerated lagoons, including aeration system • Evaluate equipment procurement strategies for facilitating the purchase and installation of additional effluent filtration equipment • Pilot studies of effluent filters and UV disinfection system. i ;::-<Effluent pump station modifications "·· ' {_..,.)Improvements to the existing disinfection facilities • A comprehensive geotechnical investigation to assure that appropriate foundation systems are designed for structural components and ancillary components of the treatment facility, • Develop an as-built topographic survey in the vicinity of the facilities included in the upgrade. • Obtain necessary local construction permits which apply to the plant upgrade • Preliminary layout of treatment facility processes and ancillary facilities, including plant operations center and new maintenance facility. • An updated project cost estimate will be prepared as part of the preliminary design The scope of the final design includes the preparation of construction drawings and specifications for the upgraded wastewater treatment facility, which will become the contract drawings during the bidding process. A detailed construction cost estimate will be developed prior to bidding the project based on the final design drawings and specification. The final design includes process design criteria, hydraulic profile, process flow diagram; civil, structural, mechanical, instrumentation and control, architectural, and electrical drawings and specifications for the following: • wastewater treatment facility headworks, • aerated lagoon systems, • effluent filtration capacity, • additional disinfection facilities, • site improvements including upgrades to plant electrical and control systems, • additions to the plant operations center, • and a new plant maintenance facility and associated facilities. The plant upgrade may be bid in several packages to minimize overall project costs. The scope of the permitting phase of the project includes providing assistance to the City in preparation of applications for a Shorelines Substantial Development permit, local building permit, notice construction application with Puget Sound Air Quality Control Authority, variance to Sensitive Areas Ordinance, and a modification of the City's l\'PDES permit for the new facility. Upgrades to the treatment plant will improve effluent quality entering Steamboat Slough and provide for the plant capacity needed to meet the increased flows and loads for the existing community and future growth. When the project is totally completed in mid 2004, including conveyance of plant effluent to the Everett/Kimberly Clark marine outfall discharge, the Snohomish River system will be free of both Marysville and a portion of Everett's effluent for a large part of the year. The projects tasks listed in Section Care improvements to the plant that specifically addresses the issues outlined in the Project Need questions (section IV B). • The upgraded headworks will have substantially greater reliability and capacity to accommodate for 2020 peak flows. The upgrade includes adding screw pumps and mechanical and manual screens, and replacing the Parshall flume with a new one with a wider throat. The headworks upgrade will ensure.protection of the downstream pumps and mechanical equipment from large particles in the wastewater. • Effluent filters will be selected based on results from pilot studies performed at the plant. The filters will be implemented in response to meeting CBOD and TSS concentration limits .. The selected filters will be located downstream of the lagoons to remove particulate CBOD and TSS. • Modifications to the existing lagoons and the ·aeration system will be performed. The lagoons currently are oversized for peak flows and results in long detention times, which encourages algae growth. The lagoons will be sized appropriately and the aeration system will be improved to increase mixing and prevent algal growth. Modifications to the lagoons will result in a reduction of CBOD and TSS concentrations. In addition, improvements to the aerated lagoons will improve the nitrification/denitrification process and reduce ammonia concentrations in the effluent. • Improvements to the disinfection process will be performed based on results from pilot studies performed at the plant. An evaluation of the current disinfection process and selection of a new efficient process will be implemented to meet the effluent fecal coliform counts in the NPDES permit limits. If the lagoons are modified to a process with a shorter detention time, fecal coliform concentrations entering the disinfection process would increase, resulting in a higher chlorine dosage where the chlorine limit would be more difficult to meet. A dechlorination or a non chlorine- based UV disinfection system would be required. Improvements to the disinfection process would ensure that the fecal coliform count is maintained below the NPDES permit limit as well as ensuring that the chlorine limit is met. • Site improvements, electrical and plant control systems would be upgraded to accommodate for the modifications to the plant. If necessary, upgraded plant power supply would be provided. SECTION V: LOCAL MANAGEMENT EFFORT (Total Points Available= 60) " .. Important Notes: 1. Do not separate one improvement or activity into multiple components. For example, if four streets are repaved under one contract, then the repavement project is considered one improvement, not four. However, if a system is being upgraded through a number of phases and each phase will be contracted for independently, then each phase is a separate improvement. If you have questions about making this determination, contact your Regional Account Executive. 2. Do not use the same improvement or activity more than once. A pipe replacement is either a maintenance project or a capital improvement project. It cannot be considered both. 3 .. Jurisdictions applying for storm water system improvements which do not have a storm water utility may use road system improvements to respond to the Effort questions. 4. Use specific dates. Do not use terms such as "recently", "in the past few years", or "ongoing" 5. Cite four and only four items in any one answer. The first four items listed in the application will be used to determine the score for the question. 6. Describe the outcomes the improvement or activity have had or are expected to have on the health and safety of the community, the quality of the environment, and/or the status of the local economy. 7. Ifa_system is taking overanother system, l!se_the_"historyofthe systemthati~c_g_u_iring the system'' 1. Renewal and Replacement Program a. The R&R program was implemented in 1998 replacing the problem sewer/infill program. From 1998 to present, $200,000 to $400,000 has been budgeted annually for the R&R program. b. This program removes and replaces sewer mains that are aging, deteriorating or are now under-sized due to increased flows. These mains are segments of the City's collection systems, which were identified in our I&I Study, sanitary sewer flushing program or as identified in our Comprehensive Sewer Plan. The goal of the R&R program is to remove and replace these mains prior to total failure, which would have the potential of additional costs beyond the replacement cost. c. During three and a half years into the program, the Public Works Construction Division has corrected, removed and replaced several problem areas, while-others have been included in the Capital Projects Program. The cost ; impact is difficult to measure at this point, however, benefits have been noted. The program has resulted in eliminating fragile segments and portions of the City's collections system and avoiding costly claims and disruption of service to customers during emergency repairs. By planning and scheduling the replacement vs. responding/reacting to an emergency, the city has been able to conduct the work safely and efficiently, while providing uninterrupted service to customers. 2. Pretreatment Program a. The Pretreatment Program started in April of 1996 with Ordinance 2072 being passed by the city council ·and incorporated into the Municipal Code as Chapter 14.20 Wastewater Pretreatment. b. lt is a non-delegated program, however, the program is conducted similarly to a delegated program, except the city works very closely with the Department of Ecology who has the delegated authority. ! c. The program has impacted the community by setting up a FOG (fast, oils and grease) program for ' approximately 100 food service providers, put 3 major industries on compliance sampling programs on a regular basis, and has helped the Department of Ecology by allowing them to use the program as their "eyes and ears" for State Waste Discharge Permit violations and inspections. The program has been a model program for other small communities. The program has increased city exposure to the public because the program must fulfill a customer service. With the on-going program, the City is able to address pretreatment issues as they come up. As a result of the program, a reduction has been observed of grease build-up in the City's collection system as well as influent loading (TSS and BOD) at the treatment plant. The lagoons have become cleaner and safer because of the cooperation received from the FOG Program participants. i 3) Computer Generated Recurring Maintenance Program ' a. In January 1996, a computer generated maintenance plan called ALL-MAX Major Maintenance was implemented for all equipment at the Wastewater Treatment Plant. b. The program allowed for all equipment to be cataloged as to type, location, vendor and quantity. Required maintenance and service for each piece of equipment is called out automatically on a schedule for City maintenance technicians to perform their work. This program sets up a work orders for the equipment which lists number of people required, materials used and equipment needed to complete the job. c. The program has had a beneficial impact on the City's maintenance program by allowing the City to purchase more effectively, budget wisely, and plan for FTE's needed and replacement issues for future equipment. The program also prolongs the life of our equipment. As a result of the proactive program, spikes in the maintenance budget have not occurred as was experienced prior to program implementation. 4) Sanitary Sewer Flushing Program (1996 to 2001) a. Public Works Operations began a dedicated sanitary sewer flushing program in 1996. The initial crew consisted of a vactor and three FTE's. l b. The crew allocated 50% of their time to flushing sanitary sewer mains and the remainder of their time to storm and retention systems. During their initial year, 31 miles of sanitary sewer mains were flushed and cleaned. By 1999 the entire collection system of 125 miles was flushed and cleaned. The crew identified problem areas which where flushed on a more frequent basis. In 2000, the City added an additional FTE to the flushing crew. Going through the system for the second time with the additional general laborer, the City increased their annual production to 55 miles. c. During the five years of the flushing progi:am,.the City has gained a lot of knowledge about the condition of the collection system, including under-sized pipes and problem areas. Prior to the flushing program a typical ; year would see approximately $50,000 in claims for sewer back-ups. This amount has been reduced to the i $10,000 to $15,000 range over the last few years. The reduction in claims and the knowledge gained has I justified the implementation of the program. 1) Expansion of Pretreatment Program l a. As the FOG portion of our Pretreatment Program has been established, the next phase will be the completion of a survey o,f the industries and businesses in our area. This task is scheduled for completion in 2002. l b. This will not only provide the City a base to work from, but will give them another opportunity to meet with commercial business owners as well as the public. This survey will focus on dental and photo wastes, radiator and detail shop wastes, and general commercial businesses not categorized as SIU's (significant industrial user) or categorical user. By 2004, the City will develop a standard where all new malls and strip malls are required to have two separate sewer lines. One for sanitary and one for grey water and kitchen waste passing through a grease interceptor prior to entering the collection system. Retro-fit of existing facilities will be considered on a case-by-case basis. '.' ··f·'' ;,., c. With over 5 years since implementation, the.FOG Program has become a minimally supervised program, and almost runs itself as food providers get used to the routines put in place such as regular cleaning, pumping, reporting and inspecting of all aspects of the grease ordinances. Expansion of the program will ensure it remains effective. With these proposed enhancements to our program, the City will see a reduced loading to the treatment facility as well as a safer environment for maintenance workers and operators. 2) Expansion of our Sanitary Sewer Flushing Program a. Currently the City has 4 FTE's with 50% of their time directed to flush the 130 miles throughout our sanitary sewer collection system. This effort results in flushing approximately 50 miles per year. With current development, the City will be adding approximately 6 miles of collection sewers per year. The City has : scheduled to obtain an additional FTE to the flushing crew in 2003 as well as purchase an additional vactor. The new vactor will be equipped with video equipment enabling the operator to video the main after it is flushed. b. The City's goal is to flush their entire collection system every two years and trouble areas more frequently as needed. This will ensure a complete cleaning and provide a visual inspection of the sanitary sewer main. c. With this enhanced effort, the City is confident that they will see fewer blockages/back-ups in their collection system resulting in fewer claims for damages. The video will be utilized to schedule required maintenance or provide input to the removal and replacement program. · 3) Enhancement of our Outreach Program a. In 2002, our Community Outreach Program will be expanded with the addition of an education program for both the elementary and junior high schools. We will also expand the program to our local network television channel and to the city's web page. b. This program will educate and enhance awareness of our customers and students regarding pollution control and the impact of wastewater discharge into our receiving streams and environment. c. Through the use of development programs from others, group meetings, speaker roundtables and visits to organizations and mailing out of brochures and pamphlets to the public, the City will be able to impact the whole community and educate them about the needs and goals for pollution control. The program will ensure the City continues to be active in the trade organizations, work with the Department of Ecology and other agencies, and open up regional discussion groups as future issues such as TMDL, Biosolids and growth management issues arise. 4) Maintenance Program/Job Standards a. Public Works Operations is in the process of completing job standards for all maintenance activities required on their collection system including lift stations. 2001 will also see the completion of a database including an inventory of all gravity sewer mains, force mains and lift stations. b. Standard operating procedures are being developed for tasks such as flushing, TV /video gravity of mains, testing, cleaning and daily, routine and comprehensive inspections of lift stations. Completion of the job standards is scheduled for December, 2001. Plans are being made to develop a computer maintenance program in 2002, which will generate monthly schedules assuring that the required preventive maintenance is completed per their annual plan. The maintenance program will generate daily work orders for crew assignments. c. The goal of the maintenance program is to assure that routine service/maintenance will be performed on schedule and will result in a prolonged life of our collection system as well as lift stations. i 1) Comprehensive Sanitary Sewerage Plan a. In June of 1997, the City completed a comprehensive plan, which was approved by DOE, to comply with WAC 173-240 and Department of Ecology requirements. b. The report is a comprehensive long-range plan used as a tool for developing an adequate sewer system for the City's service area through the next 20 years. The plan embod.ies six key goals; Water Quality Protection, Public Health Protection, Cost Control, Continuity of Sewer Service to Existing Customers, Extension of Sewer Service to New or Unserved Customers and Complement Land Use and Growth Management. c. Since the implementation of the sewer plan, projects identified in the plan are pro grammatically planned, developed and constructed to meet the six key goals. A prime example is Cost Control: . development of the Comp Plan enables the City to become eligible for PWTF assistance. Financing large . improvements over a longer period reduces.the heed for repeated rate adjustments. The City is systematically expanding their collections system through developer funded improvements and City funded regional improvements. The Trunk D expansions will provide service ultimately to approximately 3000 new dwellings. The area is current unsewered with existing homes on septic , systems. This project complies with all six of the key elements. The City will participate in oversizing i the developer improvements to meet the regional needs. The alignments were identified in the Comp · Plan, enabling the developers to coordinate their improvements to eliminate duplication. 2) Lab Certification and Quality Control Program a. The City's lab has been "certified" since the State Department of Ecology implemented the program in May 1994. The certification program entails reporting, and audits by the Department of Ecology officials. Also performance evaluation samples are required to be done, in which the City has continually recieved the highest marks in these evaluations due to the operator's careful and precise laboratory techniques. In 1996, as part of the Quality Control Program, the City developed a chemical hygiene plan and a labeling program for chemicals to insure safe practices in the laboratory. b. Every month quality control checks are performed on all of the reported parameters the City is required to submit to the Department of Ecology. c. The impact of these programs has resulted in a saving of approximately $25,000 annually for the city. by being able to "run., their own testing rather than sending out for lab services. Also by knowing that their technique is acceptable, the City can be assured that they're getting accurate data for operations, planning and regulatory reporting. '·--·~"-------------------------- cJ,I .,:J_ .. , 3) Community Outreach Progra;..,------~------------------------------ a. The Community Outreach Program has been initiating various tasks in the recent years. b. Throughout the implementation of the program, the city of Marysville has maintained very active in the community as far as educating and informing our public of what is going on through various tasks. • Recently, the City was tasked with the "University of Marysville" Public ,Works nights, in which a video tour of the Wastewater Treatment Plant was developed. The entire session was broadcasted over the local television network channel and the video is now used for orientation of new Public Works employees. • A full-time information officer was added to work with and go through articles, brochures and pamphlets to get the word out to the public. • In the fall of 2000, a position of Customer Service Rep was added. This is a full-time position tasked with communication with all city customers throughout the service area. All phone calls received are logged, categorized and directed/routed to the appropriate division. This position follows up and tracks the problem and/or concern until we have closure on the issue. Problems such as odor, illegal discharge or sewer back-ups are plotted on maps and become a maintenance tool. • Personnel maintain activity in their own trade organizations. City staff have served as Chairman of the Operator of the Year Committee for the Pacific N.W. Pollution Control Association, executive board member of the Northwest Biosolids Management Association, have helped to develop the State of Washington "Criteria for Sewage Works Design" program manual, served as a board member (past vice president, past director) in the local PNPCA Operator's group, and worked on a regular basis with Department of Ecology, Department of Health, county governments, citizens groups such as "Envirostars" and other wastewater treatment plants in the area. c. The success of this program has resulted in it being a model for other departments in the city. Customers have expressed their appreciation for better follow-up on their concerns/questions, as well as being kept informed on public works issues·,. 4) Utility Bill Re-format , a. In June of 1998, the city of Marysville Finance Department converted its utility billing function from a i small postcard billing to an 8.5'' x 22" format. b. The goal of this conversion was four-fold. First, it standardized the bill to a similar format to the City's customers other bills, which included information and rules on the reverse side. Secondly, the intent was to reduce the number of bills that were being lost or thrown away with "junk mail". Third, it allowed the City to include a return envelope, which had been a request of customers for many years. And fourth, it provided the city the flexibility to add messages to the bill itself, as well as insert a flyer with relevant information such as our annual watering calendar or notices of rate adjustments. c. The program resulted in cost savings to the city as a result of eliminating the need to do separate mass mailings to customers whenever supplemental information needed to be sent. ---~------------- N"'·"'':'TI"i~i~~,!~~ti»'ill_-_ - ___ ,_ 091'.irtieritsthat · ~--=""'--~"'-~'-'-~if~&~ii~iy:) . ------ 1) Comprehensive Sanitary Sewer Plan Update a. The City will begin an update of their Comprehensive Sanitary Sewer Plan in spring of2003. Anticipated completion of the plan and adoption will occur later that same year. b. The objective of the report will be to prepare a comprehensive long-range plan, to serve as a guide for the development of an adequate sewer system for the City's service area through the next 20 years. The report would serve as a key element of the Comprehensive Land Use Plan required by GMA. c. Updates to the plan enables the City to continually analyze the existing sewerage system and develop future improvements and programs to meet the key goals. The beneficiaries of this impact are the existing and future rate payers. 2) Utility Rate Study a. The City of Marysville is currently in the 4th year of their most recent 5 year utility rate study. The current. rates are evaluated to meet the capital and operational needs of their utility. b. The 6 year capital improvements plan for water and sewer utilities contains significant changes from the former plan used to determine current rates. In order to comply with regulatory requirements and maintain water and sewer service to our existing customers, a rate study review and possible adjustment is necessary. The City will conduct a Cost of Service based rate study during the summer and fall of 2001. The final public hearings are tentatively scheduled for September and October. Cost of Service method was selected to insure that equity is maintained throughout all customer categories, i.e. one category is not subsidizing another. c. The impact of the rate study will insure that the City has sufficient revenue to fund operations and maintenance of our sewerage system arid meet debt service requirements. The beneficiaries of this impact are our rate payers. 3. Energy Audit Program a. As energy costs soar, the City is tasked with becoming more efficient and cutting costs for energy. Currently, the City is in the process of completing an energy audit with the local power utility. This program is scheduled for completion by 2002 and incorporated into our next Comprehensive Sewer Plan. b. During the major upgrade to the City's Wastewater Treatment Plant, the design team will be recommending new energy efficient methods and equipment to be incorporated into the upgrade. The energy audit program will also address existing facilities. Most of the old pumps, motors and other equipment will be retro-fitted with new energy efficient methods and accessories. Personnel will be brought in to train operators and technicians on these methods and equipment. This program is in compliance with the Governor's Ten Percent Reduction Plan. c. The goal is to incorporate the concept of energy efficiency in all future planning and take advantage of the cost sharing capabilities or rebate programs the public power utilities provide. 4. Financial Management a. The 2001 budget includes funding for newAccounting and Financial Management software. b. The software will include a new utility billing application for increased productivity from the customer support aspect. The city is currently issuing Requests for Proposals for this software: Additionally, the city of Marysville funded a new Enterprise Fund Accountant position in its 2001 budget that directly impacts the Finance Department and its service to the Water and Sewer utility. The city filled the accounting position in January of 200 l. This position, combined with the new Utility Billing and Financial Management software, will greatly enhance the service, accountability, and information processing functions to the public and to the Public Works department. c. The combination of the above will allow the city to provide ongoing, accurate, and timely information regarding utility rates. The city will enhance its ability to estimate future cash flows and reduce our reliance on consultants for future rate analysis and studies. 1. Allen Creek Lift Station Elimination a. In January of 1997, the City began cons'::ruction on a sewer improvement project to eliminate an existing antiquated lift station consisting of30 Hp motors pumping at 1500 gpm against a head of 40 feet TOH, which haden in operation for more than 20 years. · b. The existing lift station did not meet current design standards, had insufficient capacity to meet future growth . demands, and required excessive operation and maintenance efforts. Further, the lift station was not pile supported and settlement had fractured the influent pipe on two occasions. The lift station was located immediately adjacent to Allen Creek, an anadromous fish-bearing stream. The lift station was replaced with a 30-inch diameter gravity sewer bypass, which was bored under Allen Creek and extended approximately 1100 LF to intercept the existing trunk sewer. c. The impact of this project resulted in a reduction of routine maintenance of approximately 5 hours. per week · This allowed crews to devote more time to preventive maintenance elsewhere in the system. Elimination of the electric motors resulted in a cost savings estimated at approximately $4, 100 per year. Further, the improvements provided additional capacity to meet the expected growth of approximately 3000 new dwelling units within this service area. Finally, the improvements significantly reduced the potential for sewage spill to the nearby stream. 2. LID No. 69 Sanitary Sewer Improvements a. In September of 1998, the City began construction of approximately 1100 LF of gravity sewer. The sewer was extended into a currently unsewered residential neighborhood also adjacent to Allen Creek. Approximately 30 homes were currently utilizing septic systems. The age and condition of the septic systems made their performance questionable. ' b. Recent water quality tests within the adjacent stream indicated above normal levels of fecal coliform. While • the levels were not a detriment to health and safety it was a concern to the citizens. Current planning documents encourage the development of public sewers in urban areas to reduce the water quality impacts. The City completed the sewer improvements and connected all 30 homes to the new gravity sewer. , c. Initial tests for fecal coliform, after the sewer improvement, did not show a significant reduction, however, it is 1 clear that the downstream environment will benefit from the reduction in active septic systems. The City supports ' and encourages public sewer development projects of this nature. , 3. ggth Street Lift Station a. In August of 1998, the City began construction of a new regional sewer lift station. The new lift station was identified in the current Comprehensive Sanitary Sewer Plan and designated to serve a currently unsewered area i within our service area. b. The project was coordinated with the 33th Street and Bridge improvements. The land use within the service area ! consisted of both commercial and residential. However, the commercial land use was yet undeveloped due to the : lack of public sewers. The existing residential. area was under developed and could not realize urban densities without public sewers. All existing dwellings were utilizing septic systems for treatment and disposal. c. The construction of the 33th Street Lift Station resulted in commercial development of a majority of this designated land use within the first three years of its operation. Currently a large retail and grocery complex is now operating within this service area along with three freeway service uses. The result of this improvement is an ' increase to the commercial revenue base to the City and encouragement for economic development. Further, the City has collected approximately $500,000.00 of Utility Capital Improvement fees to fund necessary improvements to our sewerage system. ! 4. Sunnyside Trunk D Phase I Improvements a. In November of 1998, the City began construction of a gravity trunk sewer extension and regional lift station to i provide sewer service in a currently unsewered area within our current City limits. b. Approximately 5400 LF of 21-inch diameter trunk sewer was constructed along with a 2100 gpm lift station. The lift station has the capability to be expanded to 5500gpm to meet future development needs.The • improvements are consistent with our current Comprehensive Sanitary Sewer Plan. Increased development activities within this area necessitated the utility improve.rnents. c. The new improvements will provide public sewers to an estimated 3000 new homes within UGA. Upon • completion of the improvements, approximately 200 new homes are either connected or in the process of : connecting to the facilities. Further, benefit was realized when an antiquated private lift station was eliminated. i This lift station was constructed to serve an existing development. Prior to the construction of Trunk D improvements, the private lift station had ceased to function reliably. As a result, two overflows of sewage into the nearby sensitive areas and adjacent wetlands occurred. The City was forced to complete cleanup of the spills and provide maintenance assistance to the homeowners within the development. The ancillary benefit of the · Trunk D improvements is-to the adjacent environment through the elimination of sewage spills to sensitive areas. 1. WWTP Expansion and Effluent Transfer a. This is the project for which the City is currently seeking funds from PWTF. They will initiate design in the summer and fall of 2001 and begin construction in late spring 2002. b. The project consists of three main elements: Preliminary Design; Final Design and Permitting for the upgrade of the existing Marysville wastewater treatment facility. In this biennium, the City is applying for funding for the , proposed treatment upgrades designed to accommodate for unallocated (Tulalip) flows and City growth to 2020, as well as compliance with interim NPDES limits. c. Upgrades to the treatment plant will improve effluent quality entering Steamboat Slough and provide for the plant capacity needed to meet the increased flows and loads for the existing community and future growth. When the project is totally completed in mid 2004, including conveyance of plant effluent to the Everett/Kimberly Clark marine outfall discharge, the Snohomish River system will be free of both Marysville and a portion of Everett's effluent for a large part of the year. 2. Trunk F to A Intertie a. The City·is currently completing design and right of way acquisition for construction of approximately 4300 LF of 15-inch and 18-inch gravity sewer. The intertie will eliminate a problematic lift station dedicated to the City by private development. The lift station currently serves a Navy Housing complex in our northerly service area. The project is scheduled for construction in late fall 2001. b. This improvement was identified in the current Comprehensive Sewer Plan. The purpose of this project is to redirect additional flows from approximately 500 acres ofresidential, commercial and industrial land use tributary to Tnmk F farther to the east into Trunk Sewer A. Trunk F is nearing capacity at present due to two restrictions in pipe size. Analysis has shown more than adequate capacity in Trunk A to accommodate this additional flow. Capacity of Trunk F is not sufficient to serve the project growth within its service area. Replacement of Trunk F would be costly and include repairing a recently constructed 5-lane arterial along the sewer alignment. The anticipated cost of providing sufficient capacity for the future is $2,400,000.00. c. The benefit of the project will be elimination of a problematic lift station in which the City has expended approximately $10,000.00 in replacement equipment, including new pump motors and electrical components. Approximately 5 man-hours per week of maintenance can be reallocated to preventive maintenance elsewhere in our system. Finally, the project will save approximately $900,000 from that of a complete replacement. This ' enables the City to reduce the impacts of rate adjustments to ratepayers. t:;f.-.,1; ------------------~---------------------------------------- 3. 51 st Street Lift Station Rehabilitation a. The City will proceed with the design and construction ofrehabilitation to an existing 30-year-old lift station starting in winter 2002. The project will include a new submersible pump station, electrical controls and telemetry with a capacity of 4400gpm. The existing facilities will be abandoned upon completion of the project. b_ The existing pump station is equipped with an overflow into Quilceda creek. The new facilities will be ' equipped with emergency power supply and the current overflow eliminated. The lift station is an integral part of · our conveyance system. Both Trunks F and A are tributary to the lift station serving more than I 000 acres of residential, commercial and industrial land use. c. The impact of the project will result in reliable service to a significant portion of the current service area. It will maintain service to existing customers and provide for future growth and prosperity. Elimination of the overflow will benefit the environment. 4. Trunk D Phase II Expansion a. The City has completed design for the second phase of the Trunk D expansion. Construction for this project is j anticipated to start in fall 2001 and continue through 2002. The project consists of 7000 LF of gravity sewer main, 4100 LF of sewer forcemain and 1000 gpm submersible lift station. · b. This is a regional improvement extending public sewers into an area of our UGA, which is unsewered_ The desire to limit septic systems and meet the growth demands in urban area has necessitated this project. The improvements were sized to meet the future land use densities defined in our Comprehensive plan. The facilities will provide service to estimated 1400 new residential dwellings. c. The impact to the City is to insure availabllity•of public sewers to the community, insure compliance with current planning documents, and maintain or enhance water quality in the nearby waterways by limiting septic system development. WETLANDS DISCLOSURE FORM (GOVERNOR'S EXECUTIVE ORDER 90-04) ·rsihereaweiEild;asdefinedbyeiiher:u.s:F'iSl1aild .. Wildlife or the Clean Water Act, on the site or within 200 feet? U.S. Fish and Wildlife Definition For purposes of this classification wetlands must have one or more of the following three attributes: ( 1) at least periodically, the land supports predominantly hydrophytes, (2) the substrate is predominantly undrained hydric soil, and (3) the substrate is nonsoil and is saturated with water or covered by shallow water at some time during the growing season of each year. Clean Water Act Definition Those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas. Washington State Four-Tier Wetlands Rating Category: (If yes, mark all that apply.) Categories ____ I, ____ II, Are any wetland mitigation measures pr,oposed to avoid impacts from this project? " · If yes, please describe. ___ III, Will these mitigation measures result in no net loss of wetlands? Information on this disclosure form ~s provided by: / Name: Title Phone Number Date: IV ---- APPLICANT CERTIFICATION . WHEREAS,"dfy\l[Nl7Jy$vifre}iZjS\'~:(;l,'~J,;;;;91 is applying to the Washington State Public Works Trust Fund program for a low-interest loan for an eligible project; and WHEREAS, RCW 43.155.070 requires that applicants planning under RCW 36.70A.040 must have adopted comprehensive plans in conformance with the requirements of chapter 36. 70A RCW, and must have adopted development regulations in conformance with the requirements of chapter 36.70A RCW; and WHEREAS, RCW 70.95 requires a comprehensive Solid Waste Management plan adopted by the city or county; and WHEREAS, RCW 43.155.070 requires that county and city applicants must have adopted the local optional one-quarter of one percent Real Estate Excise Tax, as described in Chapter 82.46 RCW; and WHEREAS, the local governing body has approved submission of this application for a Public Works Trust Fund loan; and WHEREAS, the applicant recognizes and acknowledges that the information in the application fonns is the only information which will be considered in the evaluation and rating process. Incomplete responses will result in a reduced chance of funding. In order to ensure fairness for all, the Public Works Board does not accept any additional written materials or permit applicants to make presentations before the Board; and WHEREAS, the information prqvided on the Wetlands Disclosure Form is accurate to the best of the local government's knowledge and ability; and WHEREAS, it is necessary that certain conditions be met as part of the application process; and WHEREAS, RCW 43.155.060 requires that the projectwili' be advertised for competitive bids and administered according to standard local procedure; and WHEREAS, the loan will not exceed the maximum amount allowed by the Board of eligible costs incurred for the project; and WHEREAS, any loan arising from this application constitutes a debt to be repaid, and (person/title) has reviewed and concluded it has the necessary capacity to repay such a loan; and WHEREAS, the information provided in this application is true and correct to the best of the government's belief and knowledge and it is understood that the state may verify information, and that untruthful or misleading information may be cause for rejection of this application or termination of any subsequent loan agreement. NOW THEREFORE. (name of local £ovemment)\City 6f Marysville \certifies that it meets .__ ···-·"'--.......... ,, .. ""' ·'·' .. -----···· these requirements. and further that it intends to enter into a loan agreement with the Department of Community. Trade and Economic Development. on behalf of the Public Works Board. provided that the terms and conditions for a Public Works Trust Fcmd loan are satisfactory to both parties. Signed: ·---(}aw/p;tiJilii ;;-1+~,-:-;IS.ji--;Tz-:.-c:s--~;--------~ --------0;-:-_ Title Phone Number: -Date: ... ,--~-- -,,,.-- \.~:tn:~::~:·\~-----~ ATTEST: CERTIFICATION BY PREPARER OF APPLICATION (Staff Member or Consultant) WHEREAS,rml'.~~i:!t'if®ig@ill$11] has prepared this application for a Washington State Public Works Trust Fund loan; and WHEREAS, the preparer recognize and acknowledge that the information in application is the only information that will be considered in the evaluation and rating process. Incomplete responses will result in a reduced chance of funding, and that in order to ensure fairness for all, the Public Works Board does not accept any additional written materials or permit applicants to make presentations before the Board; and WHEREAS, the information provided in this application is true and correct to the best of the preparers' belief and knowledge; and NOW THEREFORE,~(31JY(~1't!,]?J recognizes and acknowledges the above declarations and certify that this application meets the above requirements. Signed: Title Phone Number: Date: ATTEST: ., ' ·-'':."1_ .~ 01 2002 Con~t~u~tion Application Threshold Review Form . Name of Jurisdiction: (I { Ji,. 0 f_ /V1_" ,,, S UJ-ll L "roject Typeffitle: I . [,, "' U_} &._ S~" , /' ~,,,j.yy..,..,,.J.. {-) la,.1--LLtc;vz-.Ad "erson Contacted: /Zet); ll .u~ t}V\. rr-71 ;:) Teleph~ # . . , ... <:-1 ~- \ ./ Yes No NIA Section I: Applicant Information complete? v Section II: Project Funding and Schedule ' • Project Costs are complete, accurate, and reasonable? v----- ~ Financial constraints are not overwhelming? . • HB 1204 Question answered adequately? V' • Timeline is complete, accurate, and reasonable? v- ~ . Review timeline -are they READY TO PROCEED? {,/" . • Project Funding form is complete, accurate, and reasonable? . -, ~ Calculate interest rate: 1/U/tf') Section III: Eligibility Requirements --1 --• Does the project include side-service sewer connections on privately owned . property? If yes, is resolution attached? v • Adopted optional 1.( of 1 % REET? ~ I • Applicant is planning under GMA, and is ill conformance (received approval ~I /Growth)? • Applicant is NOT planning under GMA, but meets all planning requirements (has' I CFP for every system they own, that meets the PWB standards)? 'Attachments: !Wetlands form complete? v -~ !Applicant's certification form complete? v-~reparer' s certification form complete? V' ~omments I Follow up . . 1 0U1 /?._ e 't~ 1-r-,f f1'U ,..-cc'Y) fl.,,0µ fa,.__}' I -h"""-L"--'-~ (Z. ~~ j./ 0\ '<\'\lo ;VJ ·i.,· v \J' I egional Account Executive: Yes No roject Passes Threshold Review ecord Application on chart on file cabinet when comp_lete~,-~!'d file this form with the original application. ~' ·' AMENDMENTNUMBERl PUBLIC WORKS TRUST FUND LOAN AGREEMENT NUMBER PW-01-691-PRE-114 BETWEEN THE DEPARTMENT OF COMMUNITY, TRADE AND ECONOMIC DEVELOPMENT AND THE CITY OF MARYSVILLE The purpose of this amendment is to extend the term of Public Works Trust Fund Loan Agreement Number PW-01-691-PRE-114 from five years to twenty years. This amendment is being entered into based on Pre-Construction program policy adopted by the Public Works Board at its February 3, 1998 meeting. The Washington State Department of Community, Trade and Economic Development (hereinafter referred to as the DEPARTMENT) and the City of Marysville (hereinafter referred to as the LOCAL GOVERNMENT) agree to amend Public Works Trust Fund Loan Agreement Number PW-01-691-PRE- l 14 as described below. Section 4.01 Rate and Term is amended to read as follows: The DEPARTMENT, using funds appropriated from the Public Works Assistance Account, shall loan the LOCAL GOVERNMENT a sum not to exceed $1, 000, 000 .00. The interest rate shall be one-half percent (1/2%) per annum on the outstanding principal balance. The term of the loan shall not exceed twenty years, with the final payment due July 1, 2021. A copy of this amendment, consisting of one (1) page shall be attached to and incorporated into the original agreement between the DEPARTMENT and the LOCAL GOVERNMENT. Any reference in such agreement to the "agreement" shall mean "agreement as amended." All other items and conditions of the original loan agreement or prior amendments shall remain in full force and effect. IN WITNESS THEREOF, the DEPARTMENT and the LOCAL GOVERNMENT have executed this amendment as of the date and year last written below. DEPARTMENT OF COMMUNITY, TRADE AND~~MENT Steve Wells Director. Local Government Division Title Date APPROVED AS TO FORM ONLY 10'" Day of May, 2000 Christine 0. Gregoire Attorney General By: Signature on File Assistant Attorney General Jeanne A. Cushman (Print Name) LOCAL GOVERNMENT OraJ rditMt Name Title /Ar+~ Cv:L [J~ t l.U / 10 rcl'H¥'· [~ ~~ PWTF NUMBER PW-01-691-PRE-11" CONTRACTOR TYPE LOCAL GOVT - B = For profit Busines F = Federal Governme I = lndividua L =Local Gov O =Other S = State Agency CONTRACTOR INFORMATION Name: CITY OF MARYSVILLE Address: 80 COLUMBIA AVE MARYSVILLE Telephone Number: 360-651-5100 START DATE: October 30, 2001 AMENDMENT CODE WA 98270 er -RACT TYPE: 5 1 = Grant* 2 = Service -Client 3 = Personal Service -non client 4 = !nteragency Agreement 5 =Loan 6 = Capital Budget/Construction 7 = Reimbursabl 8 = othe TIN or SSN: 91-6001459 TERMINATION DATE: July 1, 2006 ANSWER THE FOLLOWING ON ALL PERSONAL SERVICES CONTRACTS (OBJECT C ONL Yl Incorporated? Yes [ ] No [ ] Selection Method: Competitive [] Sole Source [] UBI# ___ _ Prior State Employee? Yes [ ] No [ ] Requires OFM/LBC Filing? Yes [ ] No [ ] NAME OF PROGRAM: PWTF PRE CONSTRUCTION DESCRIPTION OF CONTRACT/AMENDMENT: WASTEWATER TREATMENT PLANT UPGRADE CONTRACT EXPENDITURE CODING CONTRACT AMOUNT STATE GF PROVISO FUND APPROP DEDICATED $1,000,000.00 058 e14 FEDERAL OTHER TOTAL $1,000,000.00 COUNTIES BENEFITTING: SNOHOMISH County AMOUNT: $1,000,000.00 Pl 69100 PWB CONTRACT MANAGER'S NAME/TELELPHONE NUMBER: PROJECT SUB-OBJECT 9p01 NR Susan Butz, 725-5004 AMENDMENT INCREASE/DECREASE 11/2/2001 PUBLIC WORKS TRUST FUND PRE-CONSTRUCTION LOAN AGREEMENT NUMBERPW-01-691-PRE-114 MARYSVILLE PART I: ENTIRE AGREEMENT This agreement, and incorporated attachments, contains all terms and conditions agreed to by the PUBLIC WORKS BOARD and the LOCAL GOVERNMENT. This contract consists often pages and two attachments. An attachment to this agreement, ATTACHMENT I: SCOPE OF WORK, consists of a description of local project activities, certification of the project's useful life, and identification of estimated project costs and fund sources and is, by this reference, incorporated into this agreement as though set forth fully herein. In addition, ATTACHMENT II: ATTORNEY'S CERTIFICATION, is by this reference incorporated into this agreement. The PUBLIC WORKS BOARD and the LOCAL GOVERNMENT have executed this agreement as of the date and year last written below. DEPARTMENT OF COMMUNITY, T~~E .AND EC. ONOMIC D\_T~ Steve~~ Director, Local Government Division Title Date I I ' APPROVED AS TO FORM ONLY 27th Day of April, 2000 Christine 0. Gregoire Attorney General By: Signature on File Assistant Attorney General Jeanne A. Cushman (Print Name) Page I LOCAL GOVERNMENT Name Title 7 ZZ. WO/ Date Federal Taxpayer Identification Number fo)~~~TIW~~ ru1 OCT 2 9 2001 Jl1 ~ 1!l1 rni !l, ~ ((; WI/ I\)) IBl El ~ rni I\)) !& IBl ~ 2000 PWTF Pre-Construction Loan Agreement PARTII: INTRODUCTION This loan agreement is made and entered into by and between the PUBLIC WORKS BOARD, (or its successor) a department of the state of Washington (referred to as the "BOARD"), and MARYSVILLE (referred to as the "LOCAL GOVERNMENT"). ,Acting under the authority of Chapter 43.155 RCW, the. BOARD has selected the LOCAL GOVERNMENT to receive a Public Works Trust Fund loan for an approved public works project. PART Ill: PURPOSE The BOARD and the LOCAL GOVERNMENT have entered into this agreement to undertake a local public works project which furthers the goals and objectives of the Washington State Public Works Trust Fund Program. The project will be undertaken by the LOCAL GOVERNMENT and will include the activities described in ATTACHMENT I: SCOPE OF WORK. The project must be undertaken in accordance with PART IV: TERMS AND CONDITIONS, and all applicable state and local laws and ordinances, which by this reference are incorporated into this agreement as though set forth fully herein. PART IV: TERMSANDCONDITIONS The parties to this agreement agree as follows: 4.01 Rate and Term of Loan The BOARD, using funds appropriated from the Public Works Assistance Account, shall loan the LOCAL GOVERNMENT a sum not to exceed $1,000,000.00. The interest rate shall be one-half percent (112%) per annum on the outstanding principal balance. The term of the loan shall not exceed 5 years, with the final payment due July 1, 2006. 4.02 Local Project Share The LOCAL GOVERNMENT pledges an amount of locally-generated revenue not less than fifteen percent (15%) of the total eligible portion of the project cost not funded by federal or state grants as identified in ATTACHMENT I: SCOPE OF WORK, to be verified at the time of project close-out. Any change in the percentage oflocally-generated funds may require an adjustment in the loan amount or interest rate charged, or both. In such event, the LOCAL GOVERNMENT agrees to execute an amendment to this agreement adjusting the loan amount or interest rate, as appropriate. Page 2 2000 PWTF Pre-Construction Loan Agreement Local project share must consist of expenditures eligible under WAC 399-30-030(3) and be related only to project activities described in ATTACHMENT I: SCOPE OF WORK. These expenditures may be made up to twelve (12) months prior to the execution of the loan agreement and verified at the time of project close-out. PUBLIC WORKS TRUST FUND MONIES MAY NOT BE USED TO REIMBURSE THE LOCAL GOVERNMENT FOR ANY COSTS INCURRED PRIOR TO EXECUTION OF THIS LOAN AGREEMENT. 4.03 Disbursement of Loan Proceeds Warrants shall be issued to the LOCAL GOVERNMENT for payment of allowable expenses incurred by the LOCAL GOVERNMENT while undertaking and administering approved project activities in accordance with ATTACHMENT I: SCOPE OF WORK. In no event shall the total Public Works Trust Fund loan exceed eighty five percent (85%) of the eligible actual project costs. The disbursement of loan proceeds shall be initiated by the LOCAL GOVERNMENT on a Washington State Invoice Voucher form. The loan funds will be disbursed to the LOCAL GOVERNMENT as follows: Within thirty (30) days of the formal execution of this agreement, a sum not to exceed seventy-five percent (75%) of the approved Public Works Trust Fund loan shall be disbursed to the LOCAL GOVERNMENT. At the time of project completion, a Close-out Report, (refer to Section 4.18 for Close-out Report), shall be submitted to the BOARD by the LOCAL GOVERNMENT certifying total actual project costs. The final Public Works Trust Fund loan disbursement shall not bring the total loan in excess of eighty five percent (85%) of the eligible project costs or the total of $1,000,000.00, whichever is less, nor shall this disbursement occur prior to the completion of all project activities. The Close-out Report shall serve as a contract AMENDMENT for determining the final loan amount, interest rate, and local share. Page 3 2000 PWTF Pre~Construction Loan Agreement In the event that the final costs identified in the Close-out Report indicate that the LOCAL GOVERNMENT has received Public Works Trust Fund monies in excess of eighty five percent (85%) of eligible costs, all funds in excess of eighty five percent (85%) shall be repaid to the Department of Community, Trade and Economic Development, or its successor, within thirty (30) days of submission of the Close-out Report. 4.04 Interest Earned on Public Works Trust Fund Monies All interest earned on Public Works Trust Fund Monies held by the LOCAL GOVERNMENT shall accrue to the benefit of the LOCAL GOVERNMENT and be applied to the eligible costs of the approved project. Benefits shall accrue in one of two ways: 1. Reduce the amount of the Public Works Trust Fund loan. 2. Pay any part of the eligible project costs that are in excess of ATTACHMENT I: SCOPE OF WORK estimates ifthere is an overrun of project costs. The LOCAL GOVERNMENT shall establish procedures to ensure that all monies received from the Public Works Trust Fund loan can be readily identified and accounted for at any time during the life of this loan agreement. Such procedures shall consist of the establishment of a separate fund, account, sub-account or any other method meeting generally accepted accounting principles. 4.05 Time of Performance The LOCAL GOVERNMENT shall begin the activities identified within ATTACHMENT I: SCOPE OF WORK no later than three (3) months after the date ofloan agreement execution and reach project completion no later than eighteen (18) months after the date of agreement execution. Failure to perform within the time frame described in the preceding paragraph may constitute default of this agreement and require the immediate repayment of any loan funds disbursed. In the event of extenuating circumstances, the LOCAL GOVERNMENT may request, in writing, that the BOARD extend the deadline for project completion. The BOARD may, by a two-thirds vote, extend the deadline. 4.06 Repavment The first loan repayment under this agreement is due July 1, 2002, and subsequent installments are due on July 1 of each year during the term of the loan. The first repayment under this agreement shall consist of interest only at the rate of one-half percent (1/2%) per annum, calculated on a 360-day year of twelve 30-day months, applied to funds received: Interest will begin to accrue from the date the BOARD issues each warrant to the LOCAL GOVERNMENT. Subsequent repayments shall consist of the principal balance due divided by the loan term remaining plus interest on the unpaid balance of the loan. The final payment shall be an amount sufficient to bring the loan balance to zero. Page 4 2000 PWTF Pre-Construction Loan Agreement The LOCAL GOVERNMENT has the right to repay the unpaid balance of the loan in full at any time, and the right to repay at a faster rate than is provided in this agreement, provided that any such payment must equal or exceed the amount normally due on an annual basis. The LOCAL GOVERNMENT will repay the loan in accordance with the preceding conditions through the use of a check, money order, or equivalent means made payable to the Department of Community, Trade and Economic Development, or its successor, and sent to: Department of Community, Trade and Economic Development Administrative Services Division/Fiscal Unit 906 Columbia Street S.W. P.O. Box 48300 Olympia, Washington 98504-8300 . 4.07 Repayment Account The LOCAL GOVERNMENT shall repay the loan solely from utility revenues, general obligation revenues, or a combination thereof. The name of the fund, account, or sub-account shall be fu.ncl ':f5o w°'+-er/S "--' 0 e,. DC. bt '.2.c'L"'.L"'<o:c.· 4.08 Default in Repayment Loan repayments shall be made to the Department of Community, Trade and Economic Development, or its successor, in accordance with Section 4.06 of this agreement. A payment not received within thirty (30) days of the due date shall be declared delinquent. Delinquent payments shall be assessed a daily penalty beginning on the thirty-first (31) day past the due date. The penalty will be assessed on the entire payment amount. The penalty will be twelve percent (12%) per annum calculated on a 360-day year. Upon default in the payment of any annual installment, the BOARD may declare the entire remaining balance of the loan, together with interest accrued, immediately due and payable. Failure to exercise its option with respect to any such repayment in default shall not constitute a waiver by the BOARD to exercise such option for any succeeding installment payment which may then be in default. The LOCAL GOVERNMENT shall pay the costs and reasonable legal fees incurred by the BOARD in any action undertaken to enforce its rights under this section. Page 5 2000 PWTF Pre-Construction Loan Agreement 4.09 Loan Security The LOCAL GOVERNMENT must select one of the following options for securing repayment of the loan. Please initial the appropriate option. 1. General Obligation: This loan 1s a general obligation of the LOCAL GOVERNMENT. OR 2. l!LI Revenue Obligation: This option may be used only if the entire project is a domestic water, sanitary sewer, storm sewer, or solid waste utility project. LOCAL GOVERNMENTS performing a storm sewer project that have not created a storm sewer utility or a combined sanitary sewer/storm sewer utility may not use this option. Projects providing for a mixture of bridge, road, domestic water, sanitary sewer, and storm sewer activities may not use this option. This loan is a revenue obligation of the LOCAL GOVERNMENT payable solely from the net revenue of the utility system indicated below. Payments shall be made from the net revenue of the utility after the payment of the principal and interest on any revenue bonds, notes, warrants or other obligations of the utility having a lien on that net revenue. As used here, "net revenue" means gross revenue minus expenses of maintenance and operations. The BOARD grants the LOCAL GOVERNMENT the right to issue future bonds and notes that constitute a lien and charge on net revenue superior to the lien and charge of this loan agreement. OR Please choose and initial one of the following utility systems: Water --- lb../ Sanitary Sewer (Wastewater) --~ Storm water ___ Water/Sanitary Sewer Stormwater/Sanitary Sewer --- Solid Waste --- 3. __ Local Improvement District: Pursuant to RCW 35.51.050, the LOCAL GOVERNMENT pledges to repay this loan from assessments collected from a Local Improvement District, Local Utility District or other similar special assessment district in which the improvements financed by this loan are located. The name of the special assessment district is _______ _ Nothing in this section shall absolve the LOCAL GOVERNMENT of its obligation to make loan repayments when due, and to adjust rates, fees, or surcharges, if necessary, to meet its obligations under this agreement. Page 6 2000 PWTF Pre-Construction Loan Agreement 4.10 Recordkeeping and Access to Records The BOARD, the BOARD'S agents, and duly authorized officials of the State shall have full access and the right to examine, copy, excerpt, or transcribe any pertinent documents, papers, records, and books of the LOCAL GOVERNMENT and of persons, firms, or organizations with which the LOCAL GOVERNMENT may contract, involving transactions related to this project and this agreement. The LOCAL GOVERNMENT agrees to retain these records for a period of six years from the date of project completion. 4.11 Reports The LOCAL GOVERNMENT, at such times and on such forms as the BOARD may require, shall furnish the BOARD with such periodic reports as it may request pertaining to the activities undertaken pursuant to this agreement including, but not limited to, quarterly progress reports, the Close-Out Report, and any other matters covered by this agreement. Failure to file periodic reports as requested may result in termination of this agreement as per Section 4.14. 4.12 Indemnification The LOCAL GOVERNMENT will defend, protect, indemnify, save, and hold harmless the BOARD, and the state of Washington from and against any and all claims, costs, damages, expenses, or liability for any or all injuries to persons or tangible property, arising from the acts or omissions of the LOCAL GOVERNMENT or any of its contractors or subcontractors, or any employees or agents in the performance of this agreement, however caused. In the case of negligence of both the BOARD and the LOCAL GOVERNMENT, any damages allowed shall be levied in proportion to the percentage of negligence attributable to each party. 4.13 Amendments, Modifications, and Waivers Except for an increase in the amount of the loan governed by this agreement, the LOCAL GOVERNMENT may request an amendment of this agreement for the purpose of modifying the SCOPE OF WORK or for extending the time of performance as provided for in Section 4.05. No modification or amendment resulting in an extension of time shall take effect until a request in writing has been received and approved by the Board in accordance with Section 4.05. No amendment or modification shall take effect until approved in writing by both the BOARD and the LOCAL GOVERNMENT and attached hereto. No conditions or provisions of this agreement may be waived unless approved by the BOARD in writing. 4.14 Termination for Cause If the LOCAL GOVERNMENT fails to comply with the terms of this agreement, or fails to use the loan proceeds only for those activities identified in ATTACHMENT I: SCOPE OF WORK, the BOARD may terminate the agreement in whole or in part at any time. The BOARD shall promptly notify the LOCAL GOVERNMENT in writing of its determination to terminate, the reason for such Page 7 2000 PWTF Pre-Construction Loan Agreement termination, and the effective date of the termination. Upon termination of the loan agreement, the BOARD shall declare the entire remaining balance of the loan, together with any interest accrued, immediately due and payable. 4.15 Termination For Convenience The BOARD may terminate this agreement in the event that federal or state funds are no longer available to the BOARD, or are not allocated for the purpose of meeting the BOARD'S obligations under this agreement. Termination will be effective when the BOARD sends written notice of termination to the LOCAL GOVERNMENT. 4.16 Governing Law and Venue This agreement shall be constrned and enforced in accordance with, and the validity and performance hereof shall be governed by, the laws of the state of Washington. Venue of any suit between the parties arising out of this agreement shall be the Superior Court of Thurston County, Washington. The prevailing party is entitled to recover costs in accordance with Washington State Law (Chapter 4.84 RCW). 4.17 Severability If any provision under. this agreement or its application to any person or circumstances is held invalid by any court of rightful jurisdiction, this invalidity does not affect other provisions of the agreement which can be given effect without the invalid provision. 4.18 Project Completion The BOARD will require and notify the LOCAL GOVERNMENT to initiate a Close-out Report when the activities identified in ATTACHMENT I: SCOPE OF WORK are completed. In the report, the LOCAL GOVERNMENT will provide the following information to the BOARD: 1. A copy of the Close-out Report. 2. A copy of the a resolution accepting the design project as being complete. 3. Certification that all costs associated with the project have been incurred. Costs are incurred when goods and services are received and/or contract work is performed. 4.19 Project Close-out In accordance with Section 4.03 of this agreement, the LOCAL GOVERNMENT will submit, together with the Close-out Report, a request for a sum not to exceed the final twenty-five percent (25%) of the loan amount. Page 8 2000 PWTF Pre-Construction Loan Agreement 4.20 Audit Audits of the LOCAL GOVERNMENT'S project activities may be conducted by the Municipal Division of the State Auditor's Office in accordance with state law and any guidelines the Department of Community, Trade and Economic Development, or its successor, may prescribe. Payment for the audit shall be made by the LOCAL GOVERNMENT. 4.21 Project Signs If the LOCAL GOVERNMENT displays, during the period covered by this agreement, signs or markers identifying those agencies participating financially in the approved project, the sign or marker must identify the Washington State Public Works Trust Fund as a participant in the project. 4.22 Utilization ofMinoritv and Women's Business Enterprises (MWBE) In accordance with legislative findings and policies set forth in Chapter 39.19 RCW, the BOARD encourages participation by Minority and Women's Business Enterprise firms certified by OMWBE. Voluntary goals for participation are: Construction/Public Works 10%MBE 6%WBE Architect/Engineering 10%MBE 6%WBE Purchased Goods . 8%MBE 4%WBE Purchased Services 10%MBE 4%WBE Professional Services 10%MBE 4%WBE 4.23 Nondiscrimination Provision During the performance of this contract, the LOCAL GOVERNMENT shall comply with all federal and state nondiscrimination laws, including, but not limited to chapter 49.60 RCW, Washington's Law Against Discrimination, and 42 U.S.C. 12101 et seq, the Americans with Disabilities Act (ADA). In the event of the LOCAL GOVERNMENT'S noncompliance or refusal to comply with any applicable nondiscrimination law, regulation, or policy, this contract may be rescinded, canceled, or terminated in whole or in part, and the LOCAL GOVERNMENT may be declared ineligible for further contracts with the BOARD. The LOCAL GOVERNMENT shall, however, be given a reasonable time in which to cure this noncompliance. Page 9 2000 PWTF Pre-Construction Loan Agreement PARTY: SPECIALASSURANCES The LOCAL GOVERNMENT assures compliance with all applicable state and local laws, requirements, and ordinances as they pertain to the design, implementation, and administration of the approved project. Of particular importance are the following: 5.01 RCW 43.155.060 The LOCAL GOVERNMENT shall comply with the provisions of RCW 43.155.060 regarding competitive bidding requirements for projects assisted in whole or in part with money from the Public Works Trust Fund program. 5.02 WAC 399-30-030(3) The LOCAL GOVERNMENT assures compliance with WAC 399-30-030(3) which identifies eligible costs for projects assisted with Public Works Trust Fund loans. 5.03 Nondiscrimination Provision During the performance of this contract, the LOCAL GOVERNMENT shall comply with all federal and state nondiscrimination laws, including, but not limited to chapter 49.60 RCW, Washington's Law Against Discrimination, and 42 U.S.C. 12101 et seq, the Americans with Disabilities Act (ADA). In the event of the LOCAL GOVERNMENT'S noncompliance or refusal to comply with any applicable nondiscrimination law, regulation, or policy, this contract may be rescinded, canceled, or terminated in whole or in part, and the LOCAL GOVERNMENT may be declared ineligible for further contracts with the BOARD. The LOCAL GOVERNMENT shall, however, be given a reasonable time in which to cure this noncompliance. 5.04 Historical and Cultural Artifacts The LOCAL GOVERNMENT agrees that if historical or cultural artifacts are discovered during construction, the LOCAL GOVERNMENT shall immediately stop construction and notify the local historical preservation officer and the state's historical preservation officer at the Washington State Office of Archeology and Historic Preservation. The LOCAL GOVERNMENT shall require this provision to be contained in all contracts for work or services related to ATTACHMENT I: SCOPE OF WORK. 5.05 Assignment Neither this agreement, nor any claims arising under this agreement, shall be transferred or assigned by the LOCAL GOVERNMENT without prior written consent of the BOARD. Page 10 2000 PW1F Pre-Construction Loan Agreement City of Marysville PUBLIC WORKS TRUST FUND Pre-Construction Program ATTACHMENT 1: SCOPE OF WORK PW-01-691-PRE-114 Wastewater Treatment Plant Upgrade 1. Provide a clear description of the project to be financed in part by a Public Works Trust Fund loan. SEE ATTACHED 2. The term of this loan will be five years. l\Pwb01\shared\Contracting\Pre-Con\PC Scope 01 PRE 114.dot OCT-02-2001 11:13 PW ADMIN CITY OF MSVL 360 651 5182 P.02 ,, The project consists of three main elements: Preliminary Design; Final Design and Permining for the upgrade of the existing Marysville wastewater treatment facility. In this biennium, the City is applying for funding for the proposed treatment upgrades designed to accommodate for unallocated (Tulalip) flows and City growth to 2020, as well as compliance with interim NPDES limits. Preliminary design activities will finalize the unit treatment processes and general configuration of the facilities to be consttucted. Recommendations in the Final 2001 Wastewater Capital Facilities Plan will be the basis for guiding this phase·ofthe work. The scope of the preliminary design will include: • An evaluation and recommendations of alternative configurations for a new treatment facility headworks; • Finalizing process design criteria, including confirmation and updating, if necessary, of the projected flow and pollutant loading on the existing wastewater treatment facility • Analyze electrical and generator improvements and develop a conceptual plan for the process instrumentation and control and electrical systems • Improvements and expansion of the aerated lagoons, including aeration system • Evaluate equipment procurement strategies for facilitating the purchase and installation of additional effluent filtration equipment • Pilot studies of effluent filters and UV disinfection system. • Effluent pump station modifications • Improvements to the existing disinfection facilities • A comprehensive geotechnical investigation to assure that appropriate foundation systems are designed for structural components and ancillary components of the treatment facility, • Develop an as-built topographic survey in the vicinity of the facilities included in the upgrade. • Obtain necessary local construction permits which apply to the plam upgrade • Preliminary l11yout of treatment facility processes and ancillary facilities, including plant operations cenrer and new maintenance facility. • An updated project cost estimate will be prepared as part of the preliminary design The scope of the final design includes the preparation of construction drawings and specifications for the upgraded wastewater treatment facility, which will become the contract drawings during the bidding process. A detailed construction cost estimate will be developed prior to bidding the project based on the final design drawings and specification. The final design includes process design criteria, hydraulic profile, process flow diagram; civil, structural. mechanical, instrumentation and control, architectural, and electrical drawings and specifications for the following: • wastewater treatment facility headworks, • aerated lagoon systems, • effluent filtration capacity, • additional disinfection facilities, • site improvements including upgrades to plant electrical and control systems. • additions to the plant operations center, • and a new plant maintenance facility and associated facil1ties. The plant upgrade may be bid in several packages to minimize overall project costs. The scope of the permining phase of the project inclLtdes providing assisrance to the City in preparation of applications for a Shorelines Substantial ·Development permit, local building permit, notice construction application with Puget Sound Air Quality Control Authority, variance to Sensitive Areas Ordinance, and a modification of the City's NPDES Scope of Work Page Two PW-01-691-PRE-l 14 Estimated Project Costs: Engineering Environmental Review Land/R-0-W Acquisition Other Fees Contingency (20%) I. Other (specify) Public Involvement/Information TOTAL ESTIMATED COSTS Anticipated Fund Sources: A. Federal Grants State Grants B. Locally Generated Revenue General Funds Capital Other Fund Rates Assessments (LID, RID, ULID) Special Levies Federal Loan(s) from: (identify all) State Loan(s) from: (identify all) Other: identify sources) TOTAL LOCAL REVENUE c. PUBLIC WORKS TRUST FUND LOAN \\Pwb01\shared\Contracting\Pre-Con\PC Scope 01 PRE 114.dot Total $ 922,978 $ 52,265 $ $ $ 200,000 $ $ 24,757 $ 1,200,000 $ $ $ $ $ 200,000 $ $ $ $ $ $ $ $ $ $ $ $ $ 1,000,000 Scope of Work Page 3 PW-01-691-PRE-114 Calculating Local Percentage: (Note: Please exclude any expansion/growth costs and funding before calculating the local percentage.) · Calculate as follows: Total Local Revenue PWTF Loan+ Total Local Revenue = Local Loan Percentage ___ _ $200,000 $1,000,000 + $200,000 = 17% The local contribution must be at least: Five percent (5%) Ten percent (10%) Fifteen percent (15%) for a loan interest rate of for a loan interest rate of for a loan interest rate of \\Pwb01\shared\Contracting\Pre-Con\PC Scope 01. PRE 114.dot 2% 1% 0.5% Public Works Trust Fund ATTACHMENT II: ATTORNEY'S CERTIFICATION I, -----'G ... ·"'"-'l-'-C("""r_1_+ __ [,-'"· _. _,('"",l"""-J "'E:--'"'""'c_Q.._.· ____ , hereby certify: I am an attorney at law admitted to practice in the State of Wa.shington and the duly appointed attorney of the (l_ H·3 <D f rVI (!( '';,12= u: I {Q (the LOCAL GOVERNMENT); and I have also examined any and all documents and records which are pertinent to the loan agreement, including the application requesting this financial assistance. · Based on the foregoing, it is my opinion that: 1. The LOCAL GOVERNMENT is a public body, proper1y constituted and operating under the . laws of the State of Washington, empowered to receive and expend federal, state and local funds, to contract with the State of Washington, and to receive and expend the funds involved to accomplish the objectives set forth in their application. 2. The LOCAL GOVERNMENT is empowered to accept the Public Works Trust Fund financial assistance and to provide for: repayment of the loan as set forth in the loan agreement. 3. There is currently no litigation in existence seeking to enjoin the commencement or completion of the above-described public facilities project or to enjoin the LOCAL GOVERNMENT from repaying the Public works Trust Fund loan extended by the DEPARTMENT with respect to such project. The LOCAL GOVERNMENT is not a party to litigation which will materially affect its ability to repay such loan on the tenns contained in the loan agreement. 4. Assumption of this obligation would not exceed statutory and administrative rule debt limitations applicable to the LOCAL GOVERNMENT. . Signature of Attorney /) rk· .. la-1J ~ . lA..r'U' Date Name A Address