Loading...
HomeMy WebLinkAbout2079 - Strider Construction - Change Order - State Avenue Corridor Improvement Project CO6CITY OF MARYSVILLE PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER No. 006 Date: July 2. 2021 Project: State Avenue Corridor Improvemeiits. ICQ* Street NE to 104* Street NE Job No.: R-16Q1 Owner: City of Marysvillc To: (Contractor) Stridcr Construction Company cc: (Surety) YOU ARE HEREBY INSTRUCTED TO: ^ Acknowledge and act upon changes in ^ Delete work as noted below the plans/specifications as noted below Q Restore areas as noted below n Perform extra work as noted below Value Engineering Change Proposal (VECP) - Walls 3 & 4 Contract Change Order No. 006 represents an agreed-to revision to the design of Retaining Walls 3 and 4, as authored by Strider and its designer. Aspect Consulting, and as further described within Strider Serial Letters 27, 28, 30, and 32 (dated 3/10/21, 4/23/21, 5/20/21. and 6/14/21. respectively) - attached herein and by this reference made part of this change order. This change is being made in accordance with City comments provided via Transmittal 231 (5/4/21), Serial Letter 11 (6/3/21), andXransmittal 248 (6/23/21), as well as Section 1-04.4(2) of the Contract, "Value Engineering Change Proposal," which stipulates: • Strider accepts design risk of all features, both temporary and permanent, of the changed Work. • Strider accepts risk of constructability of the changed Work. • Strider provides the Contracting Agency with the right to use all or any part of the proposal on future projects without further obligation or compensation. Further, Strider accepts risk and responsibility for any necessary modification to the unchanged components of Walls 3 & 4 or other elements of the Work which may arise from a) pile alignment issues encountered during driving and/or b) the VECP design changes generally. The table on the following page provides a summary of the gross savings from deleted work and the gross costs of added work arising from this change - itemized within existing Schedule A bid items and new bid items, respectively. (Note that new bid items are shown in bold font.) The difference between the two represents the net savings attribut^le to the change, and newly- established Schedule A Bid Item # 172) Incentive Pay - VECP, has been created to apportion one half of the net savings to Strider in accordance with Section 1 -04.4(2)31 of the Contract. ESTIMATED COST - CONTRACT CHANGE ORDER No. 006 Sub Section Bid Item* Description Unit Price Unit Est. Quantity Estimated Change Ami. BID SCHEDULE A 1 63 Shaft-36 In. Diameter $140.00 LF (834)($116,760.00) 1 64 Removing Soldier Pile Shaft Obstructions $2.48 EST (0.62)($11,160 00) 1 97 Portable Settling Tank $2,500.00 MO (2)($5,000.00) 1 170 Pile Driving. Walls 3 &4 (VECP)$79,250.00 LS 1 $79,250.00 1 171 Engineering Costs • VECP $17,000.00 LS 1 $17,000.00 I 172 Incentive Pay-VECP $18,335.00 LS 1 $18,335.00 Sch. A Subtotal:($18,335 00) BID SCHEDULE B Sch. B Subtotal:$0.00 BID SCHEDULE C Sch. C Subtotal:$0.00 ' Note: Bold highlight denotes newly-created bid iterr. Sub-Total. Sch. B and Sch. C Sales Tax @ 9.3%: Total for Schedules A, B, and C: ($18,335.00) $0.00 ($18,335.00) ORIGINAL CONTRACT AMOUNTdncl. WSST) $11,768,403.08 CONTRACT TOl AL AKTLRCHANGE $11,992,546.67 PERCENT CHANGE THIS ORDER -0.15580% TOTAL percent CHANGE +1.90462% Hie negotiated price for all items spccijied herein h inclusive ofthe labor, materials, tools, ami equipment required to complete the work. CONTRACT COMPLETION TIME; Same Q Estimated (increase/decrease) working days I k: July 7. 2021RECOMMEKWrO POR APPRJ>r/tL 8 DATE;APPROVAL BY: (PuUk Wurlu: DhtootI DATE: T6:DATE •MMnclor's Signaiuic) APPROVAL BY: ENIXJRSED BY p. 2 of 2